Official PDF , 119 pages - The World Bank Documents [PDF]

Aug 14, 2010 - WU 119. Shinwari Gul tepa School ...... CC13.19 Tariq Bin Ziyad. Dara. 4 ... Shinwari. 4. 32,000.00. $. I

3 downloads 27 Views 410KB Size

Recommend Stories


Official PDF , 83 pages - The World Bank Documents [PDF]
Singapore, Ghana, Kenya, Malawi, Rwanda, South Africa, Tanzania, Uganda, Zambia,. Bolivia, Ecuador ... Six cases (the. Kenya Revenue Authority, KRA; the Mexican Tax Administration Service, SAT; Peru's. National .... of the staff of the internal reven

Official PDF , 173 pages - World Bank Documents & Reports [PDF]
2 staff for 60 days 0 20. 2,400. 2,400. 6 field asonistnt. f,r 60 days 0 10. 8,000. 3,000. 2 drivers for 60 days 0 10. 1,200. 1,200. Vehicle running costs (60 days) ... Oriente. Rosario S. de Landiner, Jefe, Proyecto Diseno e Implementacion de Sistem

Official PDF , 76 pages - World Bank Documents [PDF]
may be sizeable and can be quantified with household surveys in .... are thought to be beneficial, but the empirical measurement of this economic benefit of reducing .... out may be voluntarily adapted to an individual's current physical health .....

(PDF) , 348 pages - World Bank Documents & Reports [PDF]
distribution which includes a rural electrification program designed to increase the number of rural customers by 40% (Figure 17). igure 17. INVESTMENT. 19. Debt service has become an increasingly. INVESTMENT important use of funds. Its share increas

World Bank Documents & Reports [PDF]
Mar 4, 1987 - CMPE: Technical Assistance, Draft Terms of Reference ............. 72 ...... 257. 69. 42. 95. Mon-metalic mineral products. 21S. 283. 15.334 18.;12.

World Bank Document - The World Bank Documents
Make yourself a priority once in a while. It's not selfish. It's necessary. Anonymous

World Bank Document - The World Bank Documents
So many books, so little time. Frank Zappa

World Bank Document - The World Bank Documents
The beauty of a living thing is not the atoms that go into it, but the way those atoms are put together.

World Bank Document - The World Bank Documents
Ask yourself: If I could change one thing in my life, what would I change and why? Next

World Bank Document - The World Bank Documents
Be who you needed when you were younger. Anonymous

Idea Transcript


Public Disclosure Authorized

AFGHANISTAN EDUCATION QUALITY IMPROVEMENT PROGRAM-II

Public Disclosure Authorized

MINISTRY OF EDUCATION

PROCUREMENT PLAN FY2008-10-11

Public Disclosure Authorized

Public Disclosure Authorized

Procurement Management Unit Education Quality Imrpovement Program-II

Revised Procurement Plan EQUIP II (Revision Ref.: 04 on 15-05-10)

General 1 Project information: Education Quality Improvement Project II (EQUIP II) Country: Afghanistan Borrower: Islamic Republic of Afghanistan Project Name: Education Quality Improvement Project II (EQUIP II) Grant No.: H 354 –AF Project ID : P106259 P106259 Project Implementing Agency: Ministry of Education of the Islamic Republic of Afghanistan 2

Bank’s approval date of the procurement Plan : 17 Nov.2007 (Original:)

3

Period covered by this procurement plan: One year

Procurement for the proposed project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Legal Agreement. The procurement will be done through competitive bidding using the Bank’s Standard Bidding Documents (SBD). . The general description of various items under different expenditure category are described. For each contract to be financed by the Loan/Credit, the different procurement methods or consultant selection methods, estimated costs, prior review requirements, and time frame are agreed between the Recipient and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity.

II. Goods and Works and consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Procurement Method Civil Works Goods Direct Contracting

Prior Review Threshold US$ 500,000 or more per contract US$ 200,000 or more per contract All

Consulting Services (firms) Single Source Selection

US$ 100,000 or more per contract US$ 50,000 or more per contract All firms and Individuals

1

Procurement Method ICB Civil Works

Threshold for Methods US$ 5,000,000

2

NCB Civil Works

US$ 5,000,000

3

ICB Goods

US$ 200,000

4

NCB Goods

US$ 200,000

5

Shopping Goods

US$ 100,000

6

Community Contracts

US$ 100,000

1 2 3 4 5 6

Consulting Services (Individual)

Comment

Regardless of value

Regardless of value Comment

Equivalent or more Equivalent or less Equivalent or more Equivalent or less Equivalent or less Equivalent or less

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 1 2 3

Prior Review Threshold $ 100,000 50,000 All

Comments

4

Selection Method Competitive Methods (Firms) Competitive Individual Single Source (Firms & Individuals) Selection Method QCBS QBS/FBS/LCS QBS/QCBS CQS/QBS/FBS/LCS

Threshold for Methods 200,000 equivalent or above 200,000 equivalent or above 200,000 equivalent or less 200,000 equivalent or less

Comments

1 2 3 4

Regardless of value

1. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 100,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Procurement Plan EQUIP II Ref. 03 on 14-03-09

S. No. Procurement Type 1

2

Number of Projects/ Package 3 96

R. Procurement Plan EQUIP II Ref. 04 on 15-05-10 Number of Projects/ Package 7

Total Amount in Procurement S. No. USD Type 4

1

NCB

2

PED

3

CC

4

Trainings

5

TTC

4

$

6

Goods

18

7

IC

8

C. Firms

9 10

5

6

Total Amount in USD 8

$ 18,476,300.00 1

NCB

177

$ 26,380,347.40

$

PED

8

$

$ 32,610,000.00 3

CC

857

$ 43,818,408.00

$

Trainings

12

$

2,812,645.00

1,660,000.00 5

TTC

5

$

1,680,000.00

$

4,165,000.00 6

Goods

22

$

7,478,913.78

N/A

$

3,651,720.00 7

IC

N/A

$

6,913,210.00

8

$ 56,926,443.00 8

C. Firms

8

$ 22,569,000.00

Operation Cost

$

-

Operation Cost EQUIP+TED

Quality Enhancement Grants for 2536 schools in 29 provinces

$

-

Sub Total

$ 117,489,467.00

621

-

-

2

4

9

Sub Total

1,160,006.00

$

2,627,587.90

$

5,727,580.00

$ 121,167,698.08

Actual lot price S. No.

Package No

Estimated Cost in USD

Name of School

1 2 List of Schools of Badghis Province

3

4

Revised Estimated Cost in USD

Estimated Total Package cost

5

6

Dollars

Planned/Actual Date Domestic Preference

Afghanis

7

8

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

9

10

11

12

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion 13

14

1

NCB 1.1

Darululum School

$

140,000.00

$

140,000.00

N

N

MOE

10

NCB

2

NCB 1.2

Qarqach Kandalan Boys School

$

128,000.00

$

128,000.00

N

N

MOE

8

NCB

Ibeem roofing RCC

3

NCB 1.3

Sina Urdo boys School

$

128,000.00

$

128,000.00

N

N

MOE

8

NCB

4

NCB 1.4

Kunbad Kalora School

$

128,000.00

$

128,000.00

N

N

MOE

8

$

524,000.00 $

$ $ $ $ $ $ $ $ $

112,000.00 $ 224,000.00 140,000.00 112,000.00 112,000.00 112,000.00 112,000.00 -

256,000.00 $

256,000.00

N N N

N N N

MOE MOE MOE

N

Y

MOE

8 16 16 10 8 8 8 8

Sub Total List of Schools of Balkh Province 1 NCB2.1 Turabi Girls School 2 NCB2.2 Abul- muyid Balkhi 3 NCB2.3 Abu-Rayan Alberuni 4 Farida Balkhi High School 5 Deeragai NCB2.4 Bangala 6 7 Tatai 8 Salarzai Abul-Hameed 9

NCB2.5

Sultan Ibrahim Adham Girls School

10

Charbulak High school Sub Total List of schools of Daikundi Province 1 NCB5.1 Tarbiyae Maleem School 2 NCB5.2 Darululum School Sub Total List of Schools of Ghazni Province 1 -

$

-

112,000.00 1,036,000.00 $

$ $ $

140,000.00 140,000.00 280,000.00 $

Sultan Mahmmod Rawza High School $

-

5802894 8807338

$

128,000.00 $

$ $

140,000.00 140,000.00 $

288,000.00

-

3

Shahre kuhna Boys Sub Total

$ $

Jul-08

Jan-09

M/s Khalid Basheer CC

Jul-010

Jul-011

New Project Purposed

RCC

Jul-010

Jul-011

New Project Purposed

NCB

RCC

Jul-010

Jul-011

New Project Purposed

NCB NCB NCB

RCC Aug-08 Oct-09 Ibeem roofing Jul-08 with GI Sheet Jan-09 Ibeem roofing Aug-08 with GI Sheet Oct-09

NCB

RCC

224,000.00

N

N

MOE

8

NCB

RCC

8

M/s Siar Qurban CC Bids due for opening in August 2008 M/s Habib Aryan CC

Jan-09

Bids opened on 27 Decembert 2008 and contract under issue

Jul-010

Jul-011

Jul-08

Oct-09

Dropped as it is not a formal School Replacement of above school/ Projct Name has been revised from Charbagh Girls School to Sultan Ibrahim Adham Girls School M/s Abdullah Qurban CC

Jul-08

140,000.00 140,000.00

8282282 8172656

N N

N N

MOE MOE

10 10

NCB NCB

Ibeem roofing Aug-08 with GI sheetFeb-09 Ibeem roofing Aug-08 with GI Sheet Feb-09

10

NCB

RCC

8

NCB

RCC

NCB

RCC

NCB

RCC

M/s Baheshti CC M/s Baheshti CC

-

128,000.00

-

$

17

384,000.00

$

$

Jihan Numai Garmab School

588,000.00

8345733

160,000.00

Imam Hadad

16

-

$

2

NCB6.1

$

$ $

6037471

15

Name of Supplier/ Contractor/

$

288,000.00

N

7932723

N

MOE

10

Aug-09

Mar-09

Bids due for opening in August 2008 Project name has been revised from Alberuni Qarabaghi boys to Sultan Mahmood Rawza High Schoo dropped due to land problem Repalcement of above school/ Project name has been revised from Nazar Khan Baba school to Jihan Numai Garghi High School M/s Arun Zaki CC

Actual lot price S. No.

Package No

Name of School

Estimated Cost in USD

List of Schools of Ghor Provice 1 NCB7.1 Shiekh Mohammad Saghari High School $ 2 NCB7.2 Taqa Tamor High School $ 3 NCB7.3 NaswaneSultan Razia $ 4 NCB7.4 Darululum School $ 5 NCB7.5 Dawlatyar Girls Midle School $ 6 NCB7.6 Deh Haji High School $ Sub Total $ List of Schools of Hirat Province 1 NCB8.1 Fushaj High School $ 2 NCB8.2 Qalae Jawhar $ 3 NCB8.3 Lycee Inqelab $ 4 NCB8.4 Shara Parda $ 5 NCB8.5 Said Mohammad Qanat $ 6 NCB8.6 Jebrail Middle School $ 7 NCB8.7 Fakhri Saljoqi $ 8 NCB8.8 Ghoran Midle School $ 9 NCB8.9 Ghaibatan High School $ Sub Total $ List of Schools of Logar Province 1

NCB9.1

Surkh Abad High School

2 NCB9.2 Naser Kamal Khail Girls School Sub Total List of Schools of Maidan Wardak Province 1 NCB10.1 Darululum School 2 NCB10.2 Unkhi High School 3 NCB10.3 Milad u Nabi Midle School 4 NCB10.4 Abkazar Girls High School 5 NCB10.5 Hazrat Bilal School Sub Total List of schools of Paktia Province

$

Revised Estimated Cost in USD

128,000.00 128,000.00 128,000.00 384,000.00

$ $ $ $

$

160,000.00 128,000.00 280,000.00 128,000.00 224,000.00 224,000.00 128,000.00 128,000.00 128,000.00 1,528,000.00 $

-

$

$ $

128,000.00 128,000.00 $

$ $ $ $ $ $

140,000.00 480,000.00 256,000.00 128,000.00 128,000.00 1,132,000.00 $

256,000.00 256,000.00 160,000.00

Estimated Total Package cost

Dollars

Afghanis

Planned/Actual Date Domestic Preference

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

N N N N N N

N N N N N N

MOE MOE MOE MOE MOE MOE

16 16 16 10 8 8

NCB NCB NCB NCB NCB NCB

RCC Ibeem Roofing with GI sheet Aug-09 Mar-09 RCC RCC RCC Jun-10 Jun-11 RCC Jun-10 Jun-11

New Project Purposed New Project Purposed

N N N N N N N N N

N N N N N N N N N

MOE MOE MOE MOE MOE MOE MOE MOE MOE

20 16 20 16 16 16 8 8 8

NCB NCB NCB NCB NCB NCB NCB NCB NCB

Ibeem roofing Jul-08 with GI sheetOct-09 Ibeem roofing Jul-08 with GI sheetOct-09 RCC Jul-08 Oct-09 Ibeem roofing Jul-08 with GI sheetOct-09 RCC Jul-08 Oct-09 RCC Aug-08 Oct-09 RCC Jun-10 Jun-11 RCC Jun-10 Jun-11 RCC Jun-10 Jun-11

M/s Refa Sadat CC M/s Sahail Mumtaj CC M/s Adnan CC M/S Nav Bast CCn M/s Adnan CC M/s Adnan CC New Project Purposed New Project Purposed New Project Purposed

$ $ $ $ $ $

256,000.00 128,000.00 256,000.00 160,000.00 128,000.00 128,000.00

$ $ $ $ $ $ $ $ $

160,000.00 128,000.00 280,000.00 128,000.00 224,000.00 224,000.00 128,000.00 128,000.00 128,000.00

256,000.00 $

256,000.00

N

N

MOE

16

NCB

RCC

Sep-08

Mar-09

$

128,000.00

N

N

MOE

8

NCB

RCC

Aug-10

Aug-11

$ $ $ $ $

140,000.00 480,000.00 256,000.00 128,000.00 128,000.00

N N N N N

N N N N N

MOE MOE MOE MOE MOE

10 30 16 8 8

NCB NCB NCB NCB NCB

Ibeem roofing Sep-08 with GI sheetMar-09 RCC Jul-10 Jul-11 RCC Jul-10 Jul-11 RCC Jul-10 Jul-11 RCC Jul-10 Jul-11

Name of Supplier/ Contractor/

672,000.00 10088324 11002893 10920264 8732681 8460513 8617536

Project name has been revised from Pada Khwab Roghani High School to Surk Abad Boys High School New Project Purposed

256,000.00

-

6034868

M/S Noor Aftab CC New Project Purposed New Project Purposed New Project Purposed New Project Purposed

Actual lot price S. No.

Package No

Name of School

1 -

NCB12.1 Aryoob Jaji High School NCB12.2 Daulat Zai School Sub Total List of schools of Panjsher Province 1 List of List of 1 2

NCB13.1 Khinj High School Sub Total Schools of Parwan province NCB14.1 Zulfiqar boys School NCB14.2 Darae Sayedan High School NCB14.3 Darululum School NCB14.4 Hale Hunud School Sub Total schools of Sar-e-Pol Province NCB26.1 Darululum School WU-153 Yoltarab School

Sub Total List of Schools of Samangan Province 1 NCB27.1 Technical School Sub Total List of Schools of Takhar Province 1 NCB16.1 Abul Hasan Khirqani High School 2 NCB16.2 Nisar ahmad shaheed 3 -

NCB16.3 Ashrafia Tarashud Midle School

NCB16.4 Darululum School Sub Total List of Schools of Kabul City

Estimated Cost in USD

$ $ $

128,000.00 128,000.00 $

$

112,000.00

$

112,000.00 $

$ $ $ $ $

-

$

140,000.00 -

$

140,000.00

$ $

140,000.00 140,000.00 $

$ $

112,000.00 224,000.00

$ $

-

Dollars

Afghanis

Planned/Actual Date Domestic Preference

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

$ $

128,000.00 -

10715024

N N

N N

MOE MOE

16 8

NCB NCB

Ibeem roofing Jul-08 with GI sheetMar-09 RCC Sep-08 Mar-09

$

112,000.00

6424005

N

N

MOE

14

NCB

Ibeem roofing Jul-08 withGI SheetMar-09

N N N N

N N N N

MOE MOE MOE MOE

8 8 10 8

10

Name of Supplier/ Contractor/

M/S Sadad Mohammad cc Dropped due to land problem

M/s Basharat Noori CC

$ $ $ $

$ $

$

Estimated Total Package cost

Revised Estimated Cost in USD

-

Dropped as it si built bt PRT Dropped as it si built bt PRT Dropped as it si built bt PRT Dropped as it si built bt PRT

$ $

140,000.00 -

AFA 6,660,711.00

N

N

MOE

N

N

MOE

$

140,000.00

6739198

N

N

MOE

$

112,000.00

$

352,000.00

6613379 11172380

N

N

MOE

N

N

MOE

N

N

MOE

NCB

Ibeem roofing Sep-08 with GI Sheet Dec-09

NCB

Ibeem roofing Jul-10 with GI Sheet Jul-11

Kabul itefaq CC Shifted from EQUIP I/ Planed for 1389/ Project Procurement Method has been changed to CC

10

NCB

Ibeem roofing Jul-08 with GI Sheet Apr-09

M/S Chungar CC

8 16

NCB

RCC

NCB

RCC

NCB

RCC

M/s Shahi Kot CC Ms/ Sebaqat Wafayee CC Projec Name has been revised from Nawabade katayan to Ashrafia Tarashud Midle School Dropped as Built by other Agency

0

$

336,000.00 $

-

128,000.00

$ 128,000.00

-

8 10

Oct-08 Oct-08

Apr-09 Apr-09

Aug-10

Aug-11

Oct-08

Apr-09

Actual lot price S. No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 24 25

Package No

Name of School

Estimated Cost in USD

Darul Maleemin School $ 140,000.00 Mahjoba Herawi Girls School $ 420,000.00 Baihaqi Boys school $ Zabihulla Shahid Secondry school $ NCB15.2 Ibne Sina High school/Mohammad Seddiq $ FARHANG Alam Faizad High school $ Ustad Misba Secondry school $ 420,000.00 NCB15.3 Abizar Ghafari High school $ 224,000.00 Sayed Ismael Balkhi High school $ 280,000.00 NCB15.4 Qala Bahador Khan Secondry school $ 420,000.00 Shahrak Omid Sabz boys Primary school $ NCB15.5 Shahrak Omid Sabz Girls Primary school $ Aqa Ali Shams Boys secondry school $ 200 Family Rahman mina High school$ 420,000.00 NCB15.6 Saye Noor Mohammad Shah Mina $ 420,000.00 boys secondry school Hesa Awal Shah Shahid school $ NCB15.7 Shah Shahid Khas Secondry school $ Ali Ahmad Popal High school $ NCB15.8 Bibi Mahro boys High scool $ Qabil Bay Secondry school $ Khowaja Rawash Secondry school $ NCB15.9 Aziza Afghan Secondry school $ Sadudin Ansary Secondry school $ NCB15.10 Chamandi Char Qala Wazir Aabad $ Elhaqia Saidal Nasiry $ Khair Khana # 16 secondry school $ NCB15.11 Chashma Kotal secondry school (Azadi) $ Naw Abad Pul-i-Charkhi high school $ Arzan Qemat Girls secondry school $ Block 12 Primary school $ NCB15.12 Block 11/9 primary school $ 434,000.00 Dowazda Imam Mixed primary school $ Bibi Zainab Kobra secondry school $ NCB15.13 Hamayun Shahid high schoool $ Abdul Ghafor Ahmadi $ Shahrak Khorasan High school $ NCB15.14 Hale Hunud School $ NCB 15.15 Disabled and Blind school $ Administrative Building for NCB 15.16 $ 80,000.00 Infrastructure Department Sub Total $ 3,258,000.00

Revised Estimated Cost in USD

NCB15.1

$ $ $ $

$ $ $

Estimated Total Package cost

$

560,000.00

384,000.00 128,000.00 $ 128,000.00

640,000.00

$

644,000.00

$

700,000.00

256,000.00 256,000.00 $ -

512,000.00

$

840,000.00

$

Dollars

Afghanis

9991879 24365130

22263211 9991879 12056296 18043389

Planned/Actual Date Domestic Preference

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

N

Y

MOE

N

Y

MOE

N

Y

MOE

N

Y

MOE

N

Y

MOE

N

Y

MOE

320,000.00

N

N

MOE

$

960,000.00

N

Y

MOE

$

256,000.00

N

N

MOE

121823267

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

320,000.00 480,000.00 480,000.00 128,000.00 128,000.00 256,000.00 128,000.00 128,000.00 -

$ $ $ $ $ $ $

128,000.00 $ 128,000.00 $ -

$ $

3,456,000.00

$

30 20 30 30 30 16 8 16 8

NCB

RCC

NCB

RCC

512,000.00

$ $

420,000.00 256,000.00

-

N

Y

MOE

19,008,837.00 N

N

MOE

N

N

MOE

16 8 8 8 8 31 16 8 8 16 30 8

Dec-09

Aug-09

Mar-10

Jul-08

Feb-09

RCC

NCB

RCC

Aug-08

Feb-09

NCB

RCC

Aug-09

Mar-09

NCB

RCC

Aug-08

Feb-09

NCB

RCC

Aug-09

Mar-10

NCB

RCC

Aug-09

Mar-10

Aug-09

Mar-10

NCB

RCC Aug-09

Mar-10

Aug-09

Mar-10

Aug-09

Mar-10

Name of Supplier/ Contractor/

M/sAfghan Tamir CC M/s Mansoor Ayub CC

Dropped due to land M/s Noor Aftab CC M/s Afghan Tamir M/s Mushfaq Qadri CC M/s Zia Noori CC

Dropped due to land Ms Noor Constructionj Company

NCB

RCC

NCB

RCC

NCB

RCC

NCB

RCC

NCB

RCC

MOE 80,000.00

Aug-08

NCB

-

$

$

21832267

10 30 24 8 30 8 30 16 20 30 16 16 24 30

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

M/s Qanat Akbar shah CC Dropped due to land

Dropped due to land Dropped due to land Dropped due to land

Dropped due to land Dropped due to land Dropped due to land Aug-09 Mar-10 M/s Maushfaq Qadri CC Dropped due to land Aug-09 Mar-10 Aug-09

Mar-10

Aug-09

Mar-10

Aug-09

Mar-10

Aug-09

Mar-10

Dropped due to land Dropped due to land Dropped due to land Dropped due to land

Aug-10

Aug-11

New Project Purposed

Actual lot price S. No.

Package No

Name of School

List of Schools of Kabul Province 1 NCB17.1 Amir Habibullah 2 NCB17.2 Sahak girls School 3 NCB17.3 Farza Girls school 4 WU -154 Deh Araban Qargha Naswan Mirhamidullah, Girls, Mir 5 WNC22 Bacha Koat 6

WNC28

7

WNC 29

8

WNC32

9

WNC 27

10 11

Estimated Cost in USD

$ $ $ $

160,000.00 160,000.00 $ 104,000.00

Revised Estimated Cost in USD

Estimated Total Package cost

$ $ 256,000.00 $ $

160,000.00 160,000.00 256,000.00 104,000.00

$

55,000.00

$

55,000.00

Construction of 1)Naswan Dehdana, $ Girls, Dehdana Hawza 7,

108,275.00

$

108,275.00

Mirman Khajo, Girls, Guzar Achikzayee Hawza 1 Khawaja Rawash, Boys & girls, Khwaja Rawash Hawza 9 Naid Shahaed

$ $

108,275.00 99,972.40

$

99,972.40

Dollars

Afghanis

8958885 8958885

$

61,893.20 3,094,660

$

97,850.66 4,892,533

Planned/Actual Date IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

N N N N N

NCB NCB NCB NCB

Ibeem roofing Oct-08 with GI Sheet Apr-09 Ibeem roofing Oct-08 with GI Sheet Apr-09 RCC Aug-09 Mar-10 Ibeem roofing with GI Sheet

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

N N

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

MOE

NCB

Ibeem roofing Aug-09 with GI Sheet Mar-10

N

N

MOE

N N

N N

Domestic Preference

N N N N N

98,461.80 4,923,090

$

99,743.86 4,987,193

$

102,087.30 5,104,365

N N

$

108,275.00

$

108,275.00

WU51

Charbran SchoolGumal district $ Taqumuddin Mixed H. School, $ Seogard Sub Total $ List of Schools of Jozjan Province 1 Yangi arigh $ NCB19.1 2 Mirwais minah $ 3 NCB19.2 Khuwajah do koh $ 4 NCB19.3 Darululum School $ Sub Total $ List of Schools of Kapisa Province 1 NCB20.1 Madrasae Abdul Wahab $ 2 NCB20.2 Ashorkhil Midle School $ 3 NCB20.3 Abdul Mobin Shaheed Midle School $ 4 NCB20.4 Qari Mir Usman Midle School $ Sub Total $ List of Schools of Baghlan Province 1 NCB28.1 Darulum school $ 2 NCB28.2 Doshi Girls High School $ $ 3 NCB28.3 Wahdat Mili Wardak Ha Primary School 4 NCB28.4 Dehzak School $ 5 NCB28.5 Chinzai Primary School $ Sub Total $ List of Schools of Kundoz Province 1 NCB29.1 Darulum school $ 2 NCB29.2 Jangle Bashi $ 3 WU-120 Gunbad School $ 4 WU-124 Gul baldaq Takhta $ 5 WU-125 Dawlat Yar School $ 6 WU-126 Sawika School $ 7 WU-127 Taloka 8 WU-148 Karutai School $ 9 WU 119 Shinwari Gul tepa School $ 10 WU 120 Khaton Qala School $ 11 WU-121 Aamo School $ 12 WU-122 Naswane Archi School $ 13 WU-123 Kokcha School $ 14 WU-124 Bibi Asia Girls School $ 15 WU-125 Haji Miralam Girls School $ WU-126 Wakil Jamal Primary School $ 16

108,275.00

$

108,275.00 $

WU58

108,275.00

$

108,275.00

$

420,000.00

$ $

128,000.00 140,000.00

$ 128,000.00 128,000.00 128,000.00 384,000.00 $

160,000.00 $ $ $ $ 160,000.00

160,000.00 128,000.00 128,000.00 128,000.00

N N N N

$ 128,000.00 128,000.00 128,000.00 128,000.00 512,000.00 $

160,000.00 $ $ $ $ $ 160,000.00

160,000.00 128,000.00 128,000.00 128,000.00 128,000.00

140,000.00 140,000.00 112,000.00 112,000.00 $

$ $ $ $ $ 128,000.00 $ $ $

140,000.00 140,000.00 224,000.00 112,000.00 112,000.00 128,000.00 104,000.00 52,000.00

Sub Total

$

1,120,347.40 $ 196,000.00 224,000.00 128,000.00 140,000.00 688,000.00 $

130,000.00 112,000.00 128,000.00 128,000.00 80,000.00 128,000.00 128,000.00 128,000.00 1,466,000.00 $

107,278.54 5,363,927.00 108,275.00

16 16 16

N N

$

MOE MOE MOE MOE

N N N

N N N

Name of Supplier/ Contractor/

M/s Bright International CC M/s Bright International CC Shifted from EQUIP I/ Planed for 1389 Baryalai and Haqeeq Construction Company Jamal Zai Construction Company

Engineering Techniques Construction Company JANS Construction Company Instead of Khawaja Boghra, Boys, Khwaja Boghra Hawza 15 Saem Construction Company Contracted through BRAC

256,000.00 8912245 12096340 11603378 11052023

NCB

RCC

MOE MOE

14 16 16 10

Oct-08

Apr-09

NCB NCB

Ibeem roofing Oct-08 with IG Sheet Apr-09 RCC Oct-08 Apr-09

M/s Bibi Hawa CC M/s Faiz Nawayee M/s Abdullah Qurban CC Ms Murad Fiaz

N N N N

MOE MOE MOE MOE

10 8 8 8

NCB NCB NCB NCB

RCC RCC RCC RCC

Aug-09 Jul-10 Jul-10 Jul-10

Mar-10 Jul-11 Jul-11 Jul-11

New Project Purposed New Project Purposed New Project Purposed

N N N N N

N N N N N

MOE MOE MOE MOE MOE

10 8 8 8 8

NCB NCB NCB NCB NCB

RCC RCC RCC RCC RCC

Jul-10 Jul-10 Jul-10 Jul-10

Jul-11 Jul-11 Jul-11 Jul-11

New Project Purposed New Project Purposed New Project Purposed New Project Purposed

N N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N N

MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE

10 10

NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB

RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

Aug-10 Aug-10 Aug-10 Aug-10 Aug-10 Aug-10

Aug-11 Aug-11 Aug-11 Aug-11 Aug-11 Aug-11

-

$ $ $ $ $ $ 128,000.00

$ $ 128,000.00 $ 128,000.00 $ 80,000.00 $ 128,000.00 128,000.00 128,000.00

130,491.61 127,470.00 AFA 5,747,558.70 127,465.91 133,834.50 96,021.34

8 8 8 8

Opened on 15 th November 2008 Opened on 15th november 2008

Jul-10 Jul-10 Jul-10

Jul-11 Jul-11 Jul-11

Shifted from EQUIP I/ Planed for 1389 (To Be Checked Comb

Millad Wasel Constructio company Zaihoon Haidary CC Aziz Ghaznin Construction company Jamal Zai Construction Company Star Land Construction Company New Project Purposed New Project Purposed New Project Purposed

Actual lot price S. No.

Package No

Name of School

List of Schools of Laghman Province 1 NCB23.1 Darulum school WU-101 Shaheed Ahmad Shah Masood 2 School 3 WU-101.1 Badi-ul-abad Girls school 4 WU-102 naswani qalaei sheekhan 5 WU-102.1 mastora 6 WU-103 Badish School 7 WU-104 Shah Gelyan School 8 WU-106 gumandak 9 WU-107 Kaho Girls School Sub Total List of Schools of Badakhshan Province 1 NCB4.1 Darulum school NCB4.2 Rahe(Do) dara NCB4.3 Sheikhar Wali Sub Total List of Schools of Nooristan Province 1 NCB22.1 Darulum school Sub Total List of Schools of Farah Province NCB30.1 Sarmashkan School 1 WU-108 Qanat Akbarshah School Sub Total List of Schools of Nangrahar 1 NCB11.1 Majboor Abad High School NCB11.2 Hale Hunud School 2 WU-94 Shamir Baba Primary School 3 WU-97 Shabi Primary School 4 WU-98 Ali Sher Primary School 5 WU-99 Chilie Primary Schhool 6 WU-100 Tor Largay Primary School 7 WU-146 Qalae Akhund Girls middle 8 WU-147 Keptan baba School Sub Total

Estimated Cost in USD

$ $ $ $ $ $ $ $ $ $ $ $ $ $

Revised Estimated Cost in USD

140,000.00 208,000.00

$ $

208,000.00 208,000.00 208,000.00 52,000.00 52,000.00 64,000.00 64,000.00 1,204,000.00 $ -

Estimated Total Package cost

$

$

$ $

140,000.00 140,000.00 $

$ $ $

64,000.00 64,000.00 $

$ $ $ $ $ $ $ $ $ $

$ 80,000.00 80,000.00 64,000.00 64,000.00 64,000.00 80,000.00 80,000.00 512,000.00 $

$ $ $ $

Dollars

Afghanis

6853515

Planned/Actual Date Domestic Preference

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

NCB NCB

RCC

NCB NCB NCB NCB NCB NCB NCB

RCC RCC RCC RCC RCC RCC RCC

Aman Kaream Construction Company Aryana Ulfat Construction Company Masir Roshan Construction Company Ansar Store Construction Company Husa Construction Company Mashal Niazi Construction Company Mashal Niazi Construction Company

10

Name of Supplier/ Contractor/

140,000.00 416,000.00 $

N N

N

MOE

152,571.66

N

MOE

M/s Nangrahar shaq CC Aman Kaream Construction Company

$ 416,000.00 $ $ 104,000.00 $ $ 64,000.00 $ 64,000.00 $

150,812.64 178,716.48 189,958.04 38,081.91 39,898.48 68,549.27 70,001.64

N N N N N N N

N N N N N N N

MOE MOE MOE MOE MOE MOE MOE

N N N

N N N

MOE MOE MOE

10 8 8

NCB NCB

RCC Aug-10 Aug-11 Ibeem roofing with GI Sheet

New Project Purposed changed to CC dropped because of Social Problem

N

N

MOE

10

NCB

RCC

M/s Abdul Nazeef Masood

N N

N N

MOE MOE

8 NCB

RCC

Dropped as it’s build by an NGO Faisal Zabih Construction Company

N

N

NCB

RCC

N N N N N N N

MOE MOE MOE MOE MOE MOE MOE MOE MOE

16 8

N N N N N N N

NCB NCB NCB NCB NCB NCB NCB

RCC RCC RCC RCC RCC RCC RCC

RCC

160,000.00 $ $ $ 160,000.00

160,000.00 -

$

140,000.00

9725877

$ $

64,000.00 $

74,990.84

256,000.00 $ $ $ $ $ $ $ $ $ 256,000.00

256,000.00 80,000.00 80,000.00 64,000.00 64,000.00 64,000.00 80,000.00 80,000.00

$ $ $ $ $ $ $

95,560.78 95,502.64 70,295.10 70,186.15 67,690.67 86,683.16 AFA 4334158 87,545.66 AFA4377283

Aug-10

Aug-11

New Project Purposed Dropped due to land problem Masire Roshan Construction Company Ghazni Afghan Construction Company Dawlat Shah Construction Company Dawlat Shah Construction Company Bakhtar Bahar Construction Company M/s Etihad Khogyani CC M/s Etihad Khogyani CC

Actual lot price S. No.

Package No

Name of School

List of Schools of Khost 1 NCB 31.1 Hale Hunud School 2 WU-132 Bak High school 3 WU-129 Abdul hie habebe high school 4 WU-129.1 Alfatha high school 5 WU-130 Zakukhill madal school 6 WU-129.2 Lagan high school 7 WU-130 Achar Primary School 8 WU-130.1 Charban Primary school 9 WU-131 Meta Khan high school 10 WU-131 Shekh ameer high school WU-131.1 Shaheed Qadir Mohammad Middle 11 school 12 WU-133 Daragai Sub Total List of Schools of Kandahar 1 NCB 25.1 Hale Hunud School 2 Zarghuna middle Scxhool WU-136 3 Kaka said Ahmad 4 WU-137 Mashriqi Lycee 5 Shin Ghazi Baba 1 WU-134 Shaheed Khakrezwal girls 2 Shaheed Khakrezwal boys 3 WU-134.1 Mia Abdul Hakim 4 WU-134.2 Shaheed .S.M.Dawod 5 WU-134.3 Shaheed Ab Ahad .K. WU-134.4 Zinab Middle school 6 7 WU-134.5 Said Jamaludin Afghani girls 8 WU-134.6 Haji Miwais Nika 9 WU-135 Aino High School 10 WU-135.1 Mir Bazaar 11 WU-136 Shahid Abdul latif 12 WU-136 Mir wais Mina/Khaja ayub Ansari 13 WU-136.1 Mirwais mina Girls 14 WU-137 Said Abad 15 WU-136.2 Mahmmud Tarzi 16 WU-139 Barak Nika 17 WU-140 Madrasa Deni 18 WU-141 Maulawi Abdul Waseh 19 WU-141.1 Baba Wali Saib 20 WU-142 Madrasa Deni WU-143 H. Jamal Karz/Shin ghazi baba high 21 school 22 WU-144 Bala Zhara Sub Total

Estimated Cost in USD

Revised Estimated Cost in USD

Estimated Total Package cost

$ $ $ $ $ $ $ $ $ $ $

112,000.00 104,000.00 104,000.00 104,000.00 104,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00

$ $ $

$ $

64,000.00 912,000.00 $

$

$ $ $ $ $ $ $ $ $ $ $

112,000.00 78,000.00 78,000.00 104,000.00 64,000.00 260,000.00 260,000.00 104,000.00 104,000.00 104,000.00 104,000.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

104,000.00 104,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 104,000.00 78,000.00 78,000.00 64,000.00 64,000.00 78,000.00 64,000.00

$ $

78,000.00 2,656,000.00 $

$

$

Dollars

Afghanis

6498293

Planned/Actual Date Domestic Preference

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

N N N N N N N N N N N

MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE

NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB

RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

NCB

RCC

NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB

RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC RCC

112,000.00 64,000.00 416,000.00 $ $ $ $ 192,000.00 $ $ $ 128,000.00 $ $

101,397.78 100,273.50 96,220.67 98,783.74 68,318.00 86,260.00 60,356.00 82,634.64 66,511.00

N N N N N N N N N N N

64,000.00 $

73,614.00

N

N

MOE

N N N N N N N N N N N

N N N N N Y Y N N N N

N N N N N N N N N N N N N N N

N N N N N N N N N N N N N N N

MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE MOE

N

N

8

MOE

Name of Supplier/ Contractor/

M/s Afghan Imperial CC Dropped Wali Triziwal Construction Company Rais Construction Compjany Universal Construction Company Ajmal Hasas Construction Company Rais Construction Compjany Habib zaiconstruction Company Rais Construction Compjany Awal Jaman construction Company Rais Construction Compjany

RCC

Afghan Imparial

$

$ $ $ $

$

$ $ $ $ $ -

112,000.00

208,000.00 64,000.00 520,000.00 $ $ 624,000.00 $ $ $ $ $ $ 234,000.00 $ $ $ $ $ $ $ 156,000.00 $ $ 128,000.00 $ $ 78,000.00 $ 64,000.00 $ 78,000.00 $

217,488.34 242,859.24 104,134.64 102,391.22 104,139.46 102,717.28 110,717.28 119,832.81 46,472.00 47,725.00 47,725.00 65,391.34 63,035.44 59,151.36 94,819.02 45,909.11 47,779.73 60,011.12 60,023.16 61,741.92

AFA 10,889,641.00 AFA12159962 AFA 5206732 AFA 5119561 AFA 5206973 5,135,863.91 AFA 5535864 AFA 6,000,029.00 AFA 2317563 AFA2380052 AFA2380052 AFA 3,269,567.00 AFA 3151772 AFA 2957568 AFA 4,740,951.00 AFA 2,288,569.00 AFA 2,381,819.00

AFA 3,087,096.00

60,716.26 AFA 3035813 61,766.71

MOE MOE

8

NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB

RCC RCC

29th November opened and Contract under issue Aug-10 Aug-10 Aug-10 Aug-10

Aug-11 Aug-11 Aug-11 Aug-11

Shifted from EQUIP I/ Planed for 1389 Ahmad shahi manapal CC M/S Community CC M/S Argasthan CC M/s Haji Khan CC M/S Argasthan CC M/s Haji khan construction company M/S Mashoor cc Ms/ Niazi Aryan CC Rashteen AfghanConstruction Compjany New BoostConstruction Compjany New BoostConstruction Compjany M/s Garb Haleem CC M/s Gulishatn sistan M/sJaved Masood cc M/s Mashoor CC Noor Hami co Arian Mutalid c.c New BoostConstruction Compjany New BoostConstruction Compjany Ms/ Habeeb Bashar CC New BoostConstruction Compjany Al Hudq Nazif cons.company

Actual lot price S. No.

Package No

Name of School

Hilmand Province 11 Urban Schools 1 NCB 30 Babaji School 2 NCB 30.1 Qarghab Sofla School 3 NCB 30.2 Qarghab School Sub Total List of Schools of Faryab WU-150 Darul Ulum School Sub Total List of Schools of Zabul 1 NCB 40 Baba Hotak High School 2 NCB 40.1 Babagak Midle School 3 NCB 40.2 Zarghona Primary School Sub Total List of Schools of Paktika 1 NCB 50 Darulom Islami 2 NCB 50.1 Hayat baba High School Shaheed Payenda Mohammad Khan 3 NCB 50.2 High Sub Total 177

177

Total

Grand Total

Estimated Cost in USD

$ $ $ $ $ $

Revised Estimated Cost in USD

128,000.00 128,000.00 128,000.00 384,000.00 $ -

Estimated Total Package cost

$ $ $

$ $ $ $

128,000.00 128,000.00 128,000.00 384,000.00 $

$ $ $

128,000.00 128,000.00 128,000.00

$

384,000.00 $

$

20,076,347.40 $

$

26,380,347.40

Afghanis

128,000.00 128,000.00 128,000.00

IDA Prior No. of Responsib Review Classrooms le Agency (Y/N) to be built

Type of Type of Constructi Date of Contract Expected Bid on Delivery/ opening date Completion

N N N

N N N

MOE MOE MOE

NCB NCB NCB

N

N

MOE

8 8 8

RCC RCC RCC

Name of Supplier/ Contractor/

10-Aug-2010 10-Aug-2011 10-Aug-2010 10-Aug-2011 New Projects Purposed 10-Aug-2010 10-Aug-2011

$

$

Dollars

Planned/Actual Date Domestic Preference

-

$

113,600.54 5,680,027

NCB

Dropped due to land problem

$ $ $

128,000.00 128,000.00 128,000.00

N N N

N N N

MOE MOE MOE

8 8 8

NCB NCB NCB

RCC RCC RCC

10-Aug-2010 10-Aug-2011 New Project Purposed 10-Aug-2010 10-Aug-2011 New Project Purposed 10-Aug-2010 10-Aug-2011 New Project Purposed

$ $ $

128,000.00 128,000.00 128,000.00

N N N

N N N

MOE MOE

8 8 8

NCB NCB NCB

RCC RCC RCC

10-Aug-2010 10-Aug-2011 New Project Purposed 10-Aug-2010 10-Aug-2011 New Project Purposed New Project Purposed 10-Aug-2010 10-Aug-2011

-

6,304,000.00

MOE

S. No.

Contract Package Number1

1

2

1 2 3

WP13 WP15 WP16

Name of Contract Description)

(Brief

3 Construction of Nangarhar PED Building Construction of Takhar PED Building Construction of Ghazni PED Building

1 1 1

Quantity/ Number

Estimated Cost OR Actual Contract Price (with contract currency)

Revised Estimated cost

4

5

6

$ $ $

130,000.00 $ 130,000.00 $ 130,000.00 $

Planned/Actual Date Contract IDA Prior Procedure/ Date of Signing/ Actual Review Method Delivery/ Date of (Y/N) Completion Contract Signing 7 8 9 10

150,000.00 NCB 150,000.00 NCB 150,000.00 NCB

N N N

1-Aug-10 1-Aug-10 1-Aug-10

3-Sep-011 3-Sep-011 3-Sep-011

4

WP21

Construction of Ghor PED Building

1

$

130,000.00 $

150,000.00 NCB

N

1-Aug-10

3-Sep-011

5

WP22

Construction of Qunduz PED Building

1

$

130,000.00 $

150,000.00 NCB

N

1-Aug-10

3-Sep-011

6

WP25

Construction of Bamyan PED Building

1

$

130,000.00 $

150,000.00 NCB

N

1-Aug-10

31-Jul-011

7

WP31

Constrution of Noristan PED Building

1

$

130,000.00 $

130,000.00 NCB

N

1-Aug-10

31-Jul-011

8

8

WP30

Construction of Daikundi PED Building

Total

1 $

130,000.00 $

130,000.00 NCB

$ 1,040,005.00 $ 1,160,006.00

N

1-Aug-10

31-Jul-011

Name of Supplier/ Contractor/

11 Shifted from EQUIP I Shifted from EQUIP I Shifted from EQUIP I Shifted from EQUIP I Shifted from EQUIP I Shifted from EQUIP I Shifted from EQUIP I Shifted from EQUIP I

Progress of To be Procurement as Completed in of 12 Not Contracted

1389

Not Contracted

1389

Not Contracted

1389

Not Contracted

1389

Not Contracted

1389

Not Contracted

1389

On Going

1389

On Going

1389

S. No.

Ref.No

Name of School

No. of Location (District) Classrooms to be built

1 2 3 4 List of t Schools of Badghis Province 1 CC 1.1 Chalatak Primary School Abkamari 2 CC 1.2 Quritu Murghab 3 CC 1.3 Zadmard Primary School Abkamari CC 1.4 Safidalak Primary School Abkamari 4 CC 1.4 Chasme gulshah Ghurmach 5 CC 1.5 Gudar Primary School Abkamari Najak Lalmey Primary 6 CC 1.6 Abkamari School 7 CC 1.7 Shorak Primary School Qadas 8 CC 1.8 Shewdan Primary School Qadas Dara-e-Tabar Primary 9 CC 1.9 Qadas School 10 CC 1.10 Shar Share Chaman Qadas 11 CC1.10 Idgah qalae-i-nav 12 CC 1.11 Rubat Primary School Qadas Ghaibali Dasht Girls 13 CC 1.12 Qadas Primary School Chaprodha Girls Primary 14 CC 1.13 Qadas School CC 1.14 Charkhab Primary School Murghab 15 CC 1.14 Buyae Zardalugak Murghab 16 CC 1.15 Lalah bai Primary School Jwand Takht-e-Zard Primary 17 CC 1.16 Jwand School Tagab-e-Alam Primary 18 CC 1.17 Jwand School 19 CC 1.18 Dahistan Primary School Abkamari Chashma-e-Sunjid Primary 20 CC 1.19 Abkamari School Qarqach Kandlan Primary 21 CC 1.20 Abkamari School CC 1.21 Aab- Barik Murghab 22 CC 1.21 Mangan Murghab 23 CC 1.22 Dawary / Qadis Khordak Murghab 24 CC 1.23 Naswane Kapa Baba Murghab 25 CC 1.24 Khanaqa Abkamari 26 CC 1.25 Aab Jaal/Chilanak Jwand 27 CC 1.26 Naswane Dahak Qadis 28 CC 1.27 Naswane senjedak Muqur 29 CC 1.28 Jare Shorab Qadis 30 CC 1.29 Joe Ganj 31 CC 1.30 Aka Zai Girls School Balamurghab Sub Total

Planned/Actual Date

10

Contract Signing/ Actual Date 11

Date of Delivery/ Completion 12

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Type of Construction

Type of Contract

6

7

8

9

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC

5 4 4 4 4

IDA Prior Responsible Review Agency (Y/N)

Estimated cost in USD

4

$ $ $ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

4 4 4 6 4

$ $ $ $ $ $

32,000.00 32,000.00 32,000.00 48,000.00 32,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC CC

N N N N N N

MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 01-Jun-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

4 4 4 4 6

$ $ $ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00 48,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

01-Jun-08

15-Jul-10

6

$ $ $ $ $ $ $ $ $ $ $ $

CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08 01-Jun-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

6 6 6 6 6 6 6 6 8

48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 64,000.00 1,200,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

Comments

13

Dropped as Built by PRT Replacement of above

Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed Name of the school changed

Name of the school changed

List of t Schools of Balkh Province 1 CC 2.1 Markaze Kaldar 2 CC 2.2 Shangal Abad 3 CC 2.3 Paikan dara 4 CC 2.4 Kashanda Sufla 5 CC 2.5 Qala-e-Razaq CC 2.6 Ota qul 6 CC 2.7 Maulawi Rahmatullah 7 CC 2.8 Abdul Qader Khumi 8 9 CC 2.9 Dewali maidan 10 CC 2.10 Rahman Baba 11 CC 2.11 Tangi girls school 12 CC 2.12 Buzarigh 13 CC 2.13 Khasa Puz CC 2.14 Woljatu 14 CC 2.15 Shurarq 15 CC 2.16 Mahmoudia 16 17 CC 2.17 Abdulgan 18 CC 2.18 Abuzar ghafari 19 CC 2.19 Dahanu girls 20 CC 2.20 Naswan School CC 2.21 surkh kocha 21 22 CC 2.22 Naswane Tukhta 23 CC 2.23 Bibi Khadija CC 2.24 Hayatan 24 CC 2.25 Sayed Qasim Mohammadi 25 26 CC 2.26 Abo Ismat Marmal 27 CC 2.27 Naward kotgai 28 CC 2.28 Marifat High School 29 CC 2.29 Charsang Girls High Schol

Kaldar Dawlat Abad Sholgar Kushenda Chemtal Nahr-e-Shahi Kushinda Mazar-e-sharif Balkh Charbolak Khulm Shor Tepa Dehdadi khulm Shor Tepa Chahr Kant Zaari Zaari Khulm Kaldar Charkent Dehdadi Sholgar Chahi Zari Marmal Balkh Mazar-e-Sharif Center

4 6 5 5 4 4 4 5 4 4 4 6 4 5 4 6 4 4 4 4 4 4 8 8 8 8 6 6 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

32,000.00 48,000.00 40,000.00 40,000.00 32,000.00 32,000.00 32,000.00 40,000.00 32,000.00 32,000.00 32,000.00 48,000.00 32,000.00 40,000.00 32,000.00 48,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 64,000.00 64,000.00 64,000.00 64,000.00 84,000.00 84,000.00 80,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet RCC RCC Ibeem roofing with GI Sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11

New Project Purposed

30

CC 2.30 Khoshal Khan Midle School

Charbolak

8

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

31 32

CC 2.31 Block 5 Primary School CC 2.32 Qarye Shahidan School

Center Kholum

8 8

$ $

80,000.00 Ibeem roofing with GI Sheet 80,000.00 Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

Sep-10 Sep-10

Sep-11 Sep-11

New Project Purposed New Project Purposed

33

CC 2.33 Sayed Ismayel Balkhi School Balkh

100,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

Sub Total

10

$ $

1,628,000.00

List of Schools of Bamyan Province CC 3.1 Maroof Girls School

Yakaw Lang

1

CC 3.1 Lycee markazi yak awlang

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

CC 3.2 CC 3.2 CC 3.3 CC 3.4 CC 3.5 CC 3.6 CC 3.7 CC 3.8 CC 3.9 CC 3.10 CC 3.11 CC 3.12 CC 3.13 CC 3.14 CC 3.15 CC 3.15 CC 3.16 CC 3.17 CC 3.18 CC 3.19 CC 3.20 CC 3.21 CC 3.22 CC 3.23 CC 3.24 CC 3.25 CC 3.26 CC 3.27 CC 3.28 CC 3.29 CC 3.30 CC3.31 CC 3.31 CC3.32 CC 3.32 CC3.33

Siya Bomak middle Daga Schooll Shina Akhdarat Girls School Godar Girls School Targhai girls School Kundok Safid ghare ulya School Qolba-Tu Girls School Warezagh School Chartaq School Do Abi girl School Baghak girls School Sayed Baba Solej Boys Zardsang High School Turbalaq Pachandor Olya School Bayani Girls School Khushkak School Cheraghan School Du- Ruy School Naswane chijan Darae Chasht Sarmqul Sachak Girls high School Sachak Boys High School Payan Bagh Girls School Samara School Surkhboom Kerman Dahane qalacha Chuye taman Zokor Ajar Doshakh Girls School Sare Murghi Girls School Qara ghajor School Eg Primary School

4

Yakaw Lang

Yakaw Lang Yakaw Lang Panjab Panjab Panjab Waras Waras Waras Waras Kohmard Shebar Shebar Seghan Yakaw Lang Panjab Panjab Waras Seghan Shebar Saighan Kohmard Waras Yakaw Lang Yakaw Lang Yakaw Lang Yakaw Lang Kohmard Center Panjab Panjab Waras Kahmard Pomar Yakwlang Waras Waras Sub Total

$ $

4 4 4 4 4 4 4 4 4 4 4 4 6 6 6 6 4 5 4 4 4 4 8 8 8 4 8 8 8 4 4 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

-

Dropped due to security reasons

32,000.00 IBEEM Roofing with GI Sheet 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 48,000.00 48,000.00 48,000.00 32,000.00 40,000.00 32,000.00 32,000.00 32,000.00 32,000.00 64,000.00 64,000.00 64,000.00 32,000.00 64,000.00 64,000.00 64,000.00 44,000.00 44,000.00 88,000.00 88,000.00 88,000.00 1,576,000.00

CC

N

MoE

15-Aug-08

15-Jul-10

IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet

CC CC CC CC CC CC CC CC cc CC CC CC CC

N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet IBEEM Roofing with GI Sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10 Sep-10 Sep-10 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11 Sep-11 Sep-11 Sep-11

New Project Purposed Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed

New Project Purposed New Project Purposed New Project Purposed New Project Purposed

List of schools of Badakhshan Province 1 CC 4.1 Lesa Khohan girls (khohan) CC 4.2 Saeedan High School 2 CC 4.2 Roinzar school 3 CC 4.3 Naswan-e-Esmati 4 CC 4.4 Zarak Middle School

Khohan Khohan Khohan Khash Daraiem

5

CC 4.5 Hazara Qadam middle School Argo

6 7 8 9 10 11 12 13 14 15 16 17

CC 4.6 CC 4.7 CC 4.8 CC 4.9 CC 4.10 CC 4.11 CC 4.12 CC 4.13 CC 4.14 CC 4.15 CC 4.16 CC 4.17

18

CC 4.18 Bajawar Javed high school Sheghnan

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

CC 4.19 CC 4.20 CC 4.21 CC 4.22 CC 4.23 CC 4.24 CC 4.25 CC 4.26 CC 4.27 CC 4.28 CC 4.29 CC 4.30 CC 4.31 CC 4.32 CC 4.33

34

CC 4.34

35 36 37 38 39 40 41 42 43

CC 4.35 CC 4.36 CC 4.37 CC 4.38 CC 4.39 CC 4.40 CC 4.41 CC 4.42 CC 4.43

Yakh Daru middle School Lesa Abo Taleha girls Lesa Khohan (khohan) Sail Dahan high School Rahan Kazda Kalar Naswan Zebak Baharstan Nashur Shahran girls High School Murghak Middle School

Fetrat high school Ubaghan girls school Skazar Girls School Anjuman Primary Barragh High School darululume Argo Darululum Jayru ulya Naswan-e-Dorkhan Gardang Gohar Ayeena Poshta Khor Chang-e-Bala Langar primery Sasht primery School Khambak-e-bala primery School Haft Chinar primery school Deh Sangan kaj Dara Sare hawz Kanderim Pater Sabet High School Gandom Qul Naswane Ganda Cheshma Attachment of Faramand Shaheed Girls Bede Kalan Middle School

Ashkashem Shohada Khohan Khohan Yawan Ragh Wardoj Raghestan Zaybak Baharak Koof Kash Arghanchkhoa

8 8 8 8

$ $ $ $ $

64,000.00 64,000.00 64,000.00 64,000.00

Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

8

$

8 8 8 8 8 8 8 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $

64,000.00 Ibeem roofing with GI Sheet 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

8

$

64,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Mayami Shiki Keran-menjan Keran-menjan kohistan Argo Tashkan Khohan Khash Shar-e-bozork Yamgan Tashkan Jurm Yaftal-e-Payan Wakhan

8 8 8 8 8 8 8 4 4 4 4 4 6 4 4

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 32,000.00 32,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

40,000.00 Ibeem roofing with GI Sheet

Tagab-e-Kishm

5

$

CC

N

MoE

15-Aug-08

15-Jul-10

Kishm Jurm Nasi Jurm Raghestan Raghestan Daraiem Kishm Argo

6 6 5 6 8 8 8 8 8

$ $ $ $ $ $ $ $ $

48,000.00 48,000.00 40,000.00 48,000.00 64,000.00 64,000.00 64,000.00 64,000.00 64,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC CC CC CC CC

N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Argo

8

$

64,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Hamagan

8

$

64,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

8

$

64,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

8 8 6 8 8

64,000.00 64,000.00 48,000.00 64,000.00 64,000.00 64,000.00 80,000.00 88,000.00 66,000.00 60,000.00 60,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC CC CC

N N N N N N N

MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

44

CC 4.44

45

CC 4.45

46

CC 4.46 Charmaghz Dara Girls School Kishm

47 48 49 50 51 52 53 54 55 56 57

CC 4.47 CC 4.48 CC 4.49 CC 4.50 CC 4.51 CC 4.51 CC 4.52 CC 4.53 CC 4.54 CC 4.55 CC 4.56 CC 4.57

58

Yamgan Yamgan Yamgan Yamgan Yamgan Yamgan Yamgan Yamgan Raghestan Raghestan wakhan wakhan

8 10 8 6 4 4

$ $ $ $ $ $ $ $ $ $ $ $

CC 4.58 Yabab

Jurm

8

$

88,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

59

CC 4.59 Kata wa Qazi

Daraiem

6

$

66,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

60 61 62

CC 4.60 Simorgh Midle School CC 4.61 Spin Girls High School CC 4.62 Darulom Khash

8 8 8

$ $ $ $

88,000.00 Ibeem roofing with GI Sheet 88,000.00 Ibeem roofing with GI Sheet 88,000.00 Ibeem roofing with GI Sheet 3,748,000.00

CC CC CC

N N N

MoE MoE MoE

Sep-10 Sep-10 Sep-10

Sep-11 Sep-11 Sep-11

Nasir Khesraw High School Fatimatul Zahra Erghisk primary School Nalwech Khwary Sarab jOkhan Shinam Ghurmi Rahe dodara Zulazma moosa khan shahid Karzai School

Share Bozorugh Yaftale Payan Khash Sub Total

Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed

Project name has been changed from Ghiasi high school to Yabab Midle School Project name has been changed from Yalani to Kata wa Qazi New Project Purposed New Project Purposed New Project Purposed

List of schools of Daikundi Province 1 CC 5.1 Markaze Quchin Qi School 2 CC 5.2 Sarneli Girls Middle School 3

Eshtarli Center

6 4

$ $

48,000.00 I-Beam Roofing 32,000.00 Ibeem roofing with GI sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

4

$

32,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Kajran

4

$

32,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Shahrastan Meeramor Meeramor Khadeer

4 4 4 4

$ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

4

$

32,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

6

$

48,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC 5.3 Baghban Girls Middle School Kajran

4

CC 5.4

5 6 7 8

CC 5.5 CC 5.6 CC 5.7 CC 5.8

Haftad Nafar Boys Middle School Barlan Girls Middle School Sangan Boys High School Askan Girls High School Sar Dara Khodi High School

9

CC 5.9 Dahan-e-Barghas High School Sang Takht

10

CC 5.10 Kiso Girls High School

11

CC 5.11 Khakbarak Boys High School Sang Takht

6

$

48,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

CC 5.12 CC 5.13 CC 5.14 CC 5.15 CC 5.16 CC 5.17 CC 5.18 CC 5.19 CC 5.20 CC 5.21 CC 5.22 CC 5.23 CC 5.24 CC 5.25 CC 5.26 CC 5.27 CC 5.28

Meeramor Eshtarli Eshtarli Shahrastan Center Shahrastan Meeramor Shahrastan Keti Keti Sang Takht Khadeer Meeramor Shahrastan Kajran Eshtarli Meeramor

6 6 6 6 6 6 6 5 5 5 5 5 6 6 4 4 12

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 48,000.00 48,000.00 32,000.00 32,000.00 96,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

29

CC 5.29 Khadeer Central High school

Khadeer

8

$

64,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

30 31 32 33 34 35 36 37 38 39 40 41 42

CC 5.30 CC 5.31 CC 5.32 CC 5.33 CC 5.34 CC 5.35 CC 5.36 CC 5.37 CC 5.38 CC 5.39 CC 5.40 CC 5.41 CC 5.42

Keti Center Gezab Gezab Gezab Gezab Gezab Gezab Gezab Gezab Gezab Gezab Gezab

10 8 6 6 6 6 6 6 6 6 6 6 6

$ $ $ $ $ $ $ $ $ $ $ $ $

80,000.00 64,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Miramor

8

$

88,000.00

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

Keti Center Shahristan Miramor Sub Total

8 8 8 8

$ $ $ $ $

88,000.00 88,000.00 88,000.00 88,000.00 2,368,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

Sep-10 Sep-10 Sep-10 Sep-10

Sep-11 Sep-11 Sep-11 Sep-11

New Project Purposed New Project Purposed New Project Purposed New Project Purposed

Geeru Dehdadi Jaghuri Qarabagh Maqur Malistan Ajeeristan Gailan Nahur Gairu Qarabagh Zankhan andar Nahur Rashidan

4 4 4 4 5 4 5 4 6 4 4 5 5 5 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

32,000.00 32,000.00 32,000.00 40,000.00 32,000.00 40,000.00 32,000.00 48,000.00 32,000.00 40,000.00 40,000.00 64,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC

N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Waghaz

5

$

40,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Aabe Band Dheyak

5 5

$ $

40,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

43

CC 5.43

44 45 46 47

CC 5.44 CC 5.45 CC 5.46 CC 5.47

List of 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Tagab Boys High School Naglaj Boys High School Shelan High School Ushu Girls Mesh Boys Middle School Gerd girls Middle School Sulbi Middle School Jangalak monmae Hushi Immam Sadeq Sang Chelak Naswane Miramor Zakure Burlan Naswane Shah joe Naswane Sheikh Miran Burger High School

Royan Girls High School Qul Qadeer Sayed Jamaluddin Husaini Fakhor Sartagab Sheran Serenj Fakhor Fatima Wageer Zainabia Roqya Shiran Tagabdar Beri Warsal Rebad Girls High School Kaiso Central High School Sewook Shibar Boys School Largar Boys High School Tagab Girls High School

Schools of Ghazni Province CC 6.1 Milni Primary School CC 6.1 dehyak Primary school CC 6.2 said Ahmad haludal CC 6.3 Khwaja Ali Middle CC 6.4 Dari Zabanha CC 6.5 Jaka Pashi CC 6.6 Langarkhail Baba CC 6.7 Patap CC 6.8 Imam Hussain Kurmurda CC 6.9 Malik ibne-Qais CC 6.9 Parwar dar school CC 6.10 Siaqul CC 6.10 Ansari CC 6.11 Said Jamaludin Barjagi CC 6.12 Sanayi Shaheed Abd.Qayum CC 6.13 Surkhak CC 6.14 ubaidullah Landakhail CC 6.14 shahid Abdul Matin

Keti

Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed Dropped due to security reasons New Project Purposed Number of classes increased

Dropped due to security reasons New Project Purposed

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

CC 6.15 Ulya Sarab CC 6.16 Malikdin CC 6.16 aghujan CC 6.17 Pirykhail CC 6.18 Mawlana Abdul Hai CC 6.19 Larga CC 6.20 Mirwal CC 6.21 Halyatu Shughla Girls CC 6.22 Shaheed Faiz CC 6.23 Sarab Ulya CC 6.23 Namian Qule shutornurda CC 6.24 Naswane Maknak CC 6.25 Lahl Big High School CC 6.26 hujat Ibne hassan CC 6.27 Ayqulak CC 6.27 nani School CC 6.28 Khairu Madares CC 6.29 Naswane khaza ali CC 6.30 Kalai qazi CC 6.31 Malistan Girls High School

Jaghatu Nawa Geilan Ajeeristan Waghaz Maqur Qarabagh Jaghori Malistan Nahure Nahure Malistan Nahure Jaghuri Jaghuri andar Dheyak Center Center Malistan Sub Total

5 5 5 4 4 6 4 10 10 10 10 12 6 8 8 9 5 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

40,000.00 40,000.00 32,000.00 32,000.00 48,000.00 32,000.00 80,000.00 80,000.00 80,000.00 96,000.00 48,000.00 64,000.00 72,000.00 40,000.00 64,000.00 64,000.00 88,000.00 1,544,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC

N N N N N N N

MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11

Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed

Dropped due to security reasons New Project Purposed

New Project Purposed

List of Schools of Ghor Provice 1 CC 7.1 Garmab High School 2 CC 7.2 Zarni High School 3 CC 7.3 Deh Khwaja Middle School 4 CC 7.4 Oshan Middle School

Lal Sar Jangule Tiorah Pasaband Shahrak

5

CC 7.5 Taht-e-Shahrak Middle School Shahrak

6 7 8 9 10

CC 7.6 CC 7.7 CC 7.8 CC 7.9 CC 7.10

11

CC 7.11 Shah Sangan Middle School

Dai Primary School Gharak Primary School Qala-e-Gohar High School Tail Bai Nazar School Dehad Middle School

That-e-Markaze Tolak High School Khwaja Mohammad Ganjan Middle School Dahane sare sabad Dehtali High School Allah Yar High Schhool

4 4 4 4

$ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00

Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

5

$

40,000.00 Ibeem Roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Tolak Dawlatia Chahar Sada Dawlat Yar Dawlat Yar

4 4 4 4 4

$ $ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Pasaband

5

$

40,000.00 Ibeem Roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Tolak

5

$

40,000.00 Ibeem Roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Tiorah

5

$

Tiorah Tiorah Dawlat Yar

5 6 6

$ $ $

40,000.00 Ibeem Roofing with GI sheet 48,000.00 Ibeem Roofing with GI sheet 48,000.00 Ibeem Roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

4

$

32,000.00 Ibeem Roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

4 4 4 4 4 4 4 4 4 4 4 4 10 8 8 6 6 4 10 6 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet

CC CC CC CC CC CC

N N N N N N

MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet Ibeem Roofing with GI sheet

CC CC CC CC CC CC CC

N N N N N N N

MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11

12

CC 7.12

-

CC 7.13

13 14 15

CC 7.13 CC 7.14 CC 7.15

16

CC 7.16 Karman dashte Safarak Middle Lal Sar Jangule

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

CC 7.17 CC 7.17 CC 7.18 CC 7.19 CC 7.20 CC 7.21 CC 7.22 CC 7.23 CC 7.23 CC 7.24 CC 7.25 CC 7.26 CC 7.27 CC 7.28 CC 7.28 CC 7.29 CC 7.30 CC 7.31 CC 7.32 CC7.33 CC 7.33

Tayura Payae Hesar Tayura Zardbead Tayura Pay Tab Saghar Khair Nak Dawlanya That-e Markaz Dawlanya Dawlanya Khwajagan Chahar Sada Deh Haji Naswane Talmistan Pasaband Roof Pasaband Naswane Safidbuz Pasaband Tulak Tahaab Samuchak Teyora Dawlat Yar High School Dawlat Yar Barah Khana Middle School Dawlat Yar Noor ahmed shahid Chekh-Charan Shuraba Chekh-Charan miyan Tagab Ghalmin Chekh-Charan Dahoor Chekh-Charan attachmnet of Garmba school lal Sar Jangule12 attachment of SHURABA Chekh-Charan school Qalai Jaka Primary School Dawlat Yar Sub Total

-

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 80,000.00 64,000.00 48,000.00 48,000.00 32,000.00 100,000.00 60,000.00 80,000.00 1,408,000.00

Dropped due to community problem Replacement of above school

dropped due to security problem Replacement of above school

Dropped as it is built by NADERA Replacement of above school

Dropped as it is built by world vision Replacement of above school increase in number fo classrooms

New Project Purposed

List of 1 2 3 4 5 6 7 8 9 10 11 12 13

Schools of Hirat Province CC8.1 Sar koroh Primary School CC8.2 Asfarza Primary School CC8.3 Khwaja Malal Primary School CC8.4 Kariz Elyas- Dahanae Zulfiqar Bai Mohammad Primary CC8.5 School CC8.6 Chauni Masjid Primary School CC8.7 Do Ab Middle School CC8.8 Margha Primary School CC8.9 Urayan CC8.10 Abgazasht Primary School Zinda Chashm Girls Primary CC8.11 School Jafar Baik Khurasani Primary CC8.12 School CC8.13 Shakar Ab Primary School

Shindand Oba Kushk Rubat-eSang Gulran Kohsan Karukh Farsi Chasht-e-Sharif Shindand Kush Kuhna Kush Kuhna Kushk Rubat-eSang Gulran

4 4 4 4 4 4 6 6 6 6 6 6 5

$ $ $ $ $ $ $ $ $ $ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 40,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

14

CC8.14 Nayeb Ghafor Primary School Kohsan

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

15 16 17

CC8.15 Mamora Primary School CC8.16 Joy Naw Primary School CC8.17 Khwaja Noh

5 5 5

$ $ $

40,000.00 40,000.00 40,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

18

CC8.18 Kareez Padah Primary School Zinda Jan

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

CC8.19 CC8.20 CC8.20 CC8.21 CC8.21 CC8.22 CC8.23 CC8.23 CC8.24 CC8.25 CC8.26 CC8.27 CC8.28 CC8.29 CC8.30 CC8.31 CC8.32 CC8.33 CC8.34 CC8.35 CC8.35 CC8.36 CC8.37 CC8.38 CC8.39 CC8.39 CC8.40 CC8.41 CC8.42 CC8.43 CC8.44 CC8.45 CC8.46 CC8.47 CC8.48 CC8.49 CC8.50 CC8.51 CC8.52

5 6 7 6 7 6 6 7 8 8 8 12 8 12 12 8 8 6 8 8 9 8 6 5 6 7 6 6 8 6 8 8 8 8 6 8 6 8 6

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

40,000.00 56,000.00 56,000.00 48,000.00 56,000.00 64,000.00 64,000.00 64,000.00 96,000.00 64,000.00 96,000.00 96,000.00 64,000.00 64,000.00 48,000.00 64,000.00 72,000.00 64,000.00 48,000.00 40,000.00 56,000.00 48,000.00 48,000.00 64,000.00 48,000.00 64,000.00 64,000.00 64,000.00 64,000.00 48,000.00 64,000.00 48,000.00 64,000.00 48,000.00 2,776,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Pashtoon Zarghoon Pashtoon Zarghoon Shindand

Karizak Shindand Gaw Siya Zinda Jan naswane kabuthat khan Zinda Jan Kapak Mayan Zinda Jan San jab Zinda Jan Deh Minar Zinda Jan Qalae Turkman Zinda Jan Siya aab Zinda Jan Deh Gorgan Primary School Ghoryan Chajat Adraskan Dara Jamal Keshke Kuhna Naswane Peshakan Pashtoon Zarghun Kamana Kuhsan Aabe Safid Gulran Qalae Sharbat Kurkh Khame Muzafar Shindand Keshk Rubate Ajreen Sangeen Qaraqul Injil Gardab Injil naswane nawbadan Injil Naw badam Injil Sahar Khaiz Injil Naswane arzaqi Guzara Kabisae Farah Siya wasashan Guzara Qalae Bakhtyari kalatae Guzara Behbud Madarasea ziaratjah Guzara palawanha Karukh Naswane dahanae ghar Karukh lycee yadgar Zinda Jan Bazemchi Zinda Jan Koshke Rubate Jafar Baik Kohdani Sangi Khwaja Ubaidullah Herary Injil humesh Adraskan Zardalugak Adraskan ziayarat primary Adraskan Bande Benafsh Obe Esfarza Obe saripul Obe shaid momand Injil Sub Total

Dropped due to community problem Replacement of above school Dropped due to community problem Replacement of above school Dropped due to community problem Replacement of above school

Dropped due to community problem Replacement of above school

Dropped due to community problem Replacement of above school

List of Schools of Logar Province 1 Baraki Barak CC 9.1 Bedak Middle School 2 Center CC 9.2 Hisarak High School Hawas Khails Girls Primary 3 CC 9.3 Baraki Barak school 4 Charkh CC 9.4 Paspajak Pingram 5 Center CC 9.5 Mirwal School 6 Center CC 9.6 Dasht-e-Bahari School 7 Mohammad Agha CC 9.7 Gozi Middle School 8 Baraki Barak CC 9.8 Topak School 9 Charkh CC 9.9 Kharoti School 10 Charkh CC 9.10 Malakai School 11 CC 9.11 Raham Abad Middle School Mohammad Agha 12 Baraki Barak CC 9.12 Cheltan Middle School 13 Baraki Barak CC 9.13 Babri girls high school 14 Baraki Barak CC 9.14 Qalae Shaki girls school 15 Mohammad Agha CC 9.15 Malik tooth school Pule alam 16 CC 9.16 Jauzare altamoor school 17 Ashnapoor CC 9.17 Ashnapoor 18 Azru CC 9.18 Qasim khail 19 takhtak CC 9.19 Takhtak pingaram 20 garmaba CC 9.20 Garmaba 21 padkhab CC 9.21 faiz Kariz school 22 Center CC 9.22 Qala-e-Sare Sanng Mohammad Agha CC 9.23 Bibi Malalai School Mohammad Agha 23 CC 9.23 sare aabparam 24 Khoshi CC 9.24 Khoshi High School 25 Azru CC 9.25 Ghazi Khalil 26 Baraki Barak CC 9.26 Ibrahim Khail School Hazra 27 CC 9.27 Musa Khan School Attachment; Zarghon Shahr 28 CC 9.28 Mohammad Agha High School 29 Azru CC 9.29 Usman Khail Charkh 30 CC 9.30 Naw Shahr School 31 Mohammad Agha CC 9.31 Haji Gardai Kochai Sayed Hussain Kamidan Girls 32 CC 9.32 Center School 33 Mohammad Agha CC 9.33 Haji Badur School Mohammad Agha 34 CC 9.34 Ab bazak Girls School Shaheed Engr. Ahmad Shah 35 CC 9.35 Mohammad Agha School Sub Total

4 8

$ $

32,000.00 64,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

5 5 5 4 4 5 5 5 6 4 5 4 5 5 4 4 5 4 4 6 6 6 6 4 6

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

40,000.00 40,000.00 40,000.00 32,000.00 32,000.00 40,000.00 40,000.00 40,000.00 48,000.00 32,000.00 40,000.00 32,000.00 40,000.00 40,000.00 32,000.00 32,000.00 40,000.00 32,000.00 32,000.00 48,000.00 48,000.00 48,000.00 32,000.00 48,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

10

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

5 10 8

$ $ $

40,000.00 80,000.00 80,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 Sep-10

15-Jul-10 15-Jul-10 Sep-11

New Project Purposed

8

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

8 8

$ $

80,000.00 80,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC

N N

MoE MoE

Sep-10 Sep-10

Sep-11 Sep-11

New Project Purposed New Project Purposed

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

$

1,664,000.00

8

Droppedas it’s built by community members Replacement of above school

List of Schools of Maidan Wardak Province 1 CC10.1 Kharoti Girls Middle school Jalrez Ghazi Mohammad Afzal Jaghato 2 CC10.2 Primary School

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

3

CC10.3 Dahan Hesar Primary School

Hesa Awal

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

4 5 6

CC10.4 Bi Bi Hajera Primary School CC10.5 Resalat Primary School CC10.6 Joqol girls Middle School

Markaz-e-Behsood Markaz-e-Behsood Narkh

4 4 4

$ $ $

32,000.00 32,000.00 32,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

7

CC10.7 Shohadai Abdara High School Sayed Abad

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

8 9 10 11 12 13

Hazrat-e-Omar Farooq CC10.8 Primary School Wahdat Dewlan Middle CC10.9 School CC10.10 Shaheed Shirzad Haidari Baghlan Middle CC10.11 School Abdul Mahiyuddin High CC10.12 School Shaheed Ali Raza Primary CC10.13 School

Jaghato Jalrez

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Chak

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Chak

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Sayed Abad

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Daimird

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

14

CC10.14 Tezak Primary School

Hesa Awal

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

15

CC10.15 Raqul

Behsud

8

$

64,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

16

Qazi Gul Mohammad Shaheed CC10.16 Narkh Middle School

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

17

CC10.17 Taitamor Middle School

Narkh

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

18

CC10.18 Dabkazar High School

Chak

5

$

40,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

19

CC10.19 Ghazi Esmatuulah

Daimird

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

20

CC10.20 Alisha

Chak

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

21

CC10.21 Deh kherqa Primary

Narkh

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

22

CC10.22 Chugh hura

Narkh

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

23

CC10.23 Bibi Fatima Primary

Chak

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Sayed Abad

24

CC10.24 Awra Primary

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

25

CC10.25 Shaheed Ahmadshah Primary Jaghato

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

26

CC10.26 Inqelab Primary

Daimird

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

27

CC10.27 Sharhe Niru Primary

hesa Awal Behsud

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

28

CC10.28 Siya Qoot Primary

Center of Behsud

4

$

32,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

29

CC10.29 Khatamul Anbiya Middle

Center of Behsud

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

30

CC10.30 Khalid Bine Walid

maidan Shahr

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

31

CC10.31 aqcha primary

Narkh

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

32

CC10.32 Shaheed Izatullah School

Sayed Abad

8

$

64,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

33

CC10.33

Behsud

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

34

CC10.34 Mami Khail girls School

Center

4

$

56,000.00

RCC

CC

N

MoE

15-Aug-08

15-Jul-10

35

CC10.35 Amar Baba Girls Middle

Center

6

$

84,000.00

RCC

CC

N

MoE

15-Aug-08

15-Jul-10

36

CC10.36 Aab Kazar High School

chak

8

$

64,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

37

CC10.37 Sang Shanda High school

Behsud

8

$

64,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

38

CC10.38 Attachment of Raqul

Behsud

8

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC10.39 Unkhi High School

Sayed Abad

10

$

CC10.40 Shikh Abad High School

Sayed Abad

8

$

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

40

Do Aab Helmand Primary School

80,000.00

Changed to NCB New Project Purposed

41

CC10.41 Shahadat High School

42

CC10.42

43

CC10.43 Badam Dara Primary School

Bid Mushk Khudai Nazar Midle School

Chak

8

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

Jaghato

8

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

Sayed Abad

8

$

80,000.00

Ibeem roofing with GI sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

$

1,980,000.00

Sub Total

List of Schools of Nangrahar Mohammdi Saibzada High 1 11.1 School 2 11.2 Trelai School 3 11.3 Gandomak School Qalai Muqam Khan Girls 4 11.4 School 5 11.5 Afghan Mena School

Behsood

8

$

64,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC

MOE

01-Aug-08

15-Jul-10

8 8

$ $

80,000.00 Ibeem roofing with GI sheet Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC

MOE MOE

Sep-10 Sep-10

Sep-11 Sep-11

New Project Purposed New Project Purposed

8

$

80,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC

MOE

Sep-10

Sep-11

New Project Purposed

8

$ $

80,000.00 384,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC

MOE

Sep-10

Sep-11

New Project Purposed

32,000.00 56,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 48,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00

Sub Total List of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

schools of Paktia Province CC12.1 Rooqyan School CC12.2 Shakar Khail School CC12.3 Fatih Khail School CC12.3 Kal a niazi CC12.4 zandi Khail School CC12.5 Charago Kelay School CC12.6 Sultan Khail Primary School CC12.6 zahu school CC12.7 Khwaja Hasan School CC12.8 Moshka School CC12.9 Matwarakh School CC12.10 Garami School CC12.11 Darka School CC12.12 Rubat School CC12.13 Gerda serai CC12.13 mari Khail school CC12.14 Qala-e-Sharif High School CC12.15 Banuzai Middle CC12.16 Rubat School CC12.17 Darul Hefaz Hazrate Bilal

Aryoub Jaji Gardiz Zurmat gardiz Ahmad Abah Laja Mangal Kardah Heeri Gardiz Gardiz Ahmad Khail Butan Chamkani Chamkani Jani Khail Gerda Serai Aryoub Jaji Aryoub Jaji Gardiz Gardiz Gardiz

4 4 4 4 4 4 4 4 4 4 4 6 6 5 5 5 5 5 5 5

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

CC12.18 Balk Khail middle school

Jani Khail

6

$

18

CC12.18 Muti school

Ahmad Khail

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

19 20

CC12.19 Orgul middle school CC12.20 Karezgai Primary CC12.20 kariz school

Chamkani Gerda Serai Said Karam

6 4 4

$ $ $

48,000.00 Ibeem roofing with GI sheet 32,000.00 Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC

N

MoE

15-Aug-08

15-Jul-10

21

CC12.21 Hazar Dara middle School

Jaji

6

$

48,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

22 23 24 25 26 27 28 29 30 31 32 33 34

CC12.22 Akhund khail primary CC12.23 Shahree Changa School CC12.23 Andowan high school CC12.24 Jehad Kalay School CC12.25 Gul Ghundi High School CC12.25 Karez primary school CC12.26 Khailan High School CC12.27 Naswane Rude Ahmadzai CC12.28 Machal Gho Girls School CC12.29 Dawlat Zai School CC12.30 Ahmad Khil Midle School CC12.31 Nargisi School CC12.32 Qalai Mahmod School CC12.33 Ibrahim Khil Girls School CC12.34 Kata Khil Girls School

Ahmad Abah Zurmat Said Karam Sayed Karam Aryoub Jaji Said Karam Said Karam Ahmad Abah Ahmad Abah

4 10 10 8 10 10 8 10 8 8 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

32,000.00 80,000.00 64,000.00 80,000.00 64,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 1,784,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

-

Center Jaji Ayob Sub Total

Ibeem roofing with GI sheet RCC

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC

N N N N N N N

MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

-

Dropped due to community problem Replacement of above school

Dropped due to community problem Replacement of above school

Dropped due to community problem Replacement of above school

Dropped due to community problem Replacement of above school Dropped due to community problem Replacement of above school

Dropped due to community problem Replacement of above school Dropped due to community problem Replacement of above school

New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed

List of schools of Panjsher Province 1 CC13.1 Korabah Middle School CC13.2 Faraj High School 2 CC13.2 Par shahar 3 CC13.3 Kar Abdara Primary School 4 CC13.4 Badqol Girls Middle School Ayesha Seddiqa No. 1 Primary 5 CC13.5 School 6 CC13.6 Paranda Primary School CC13.7 Tankhu 7 CC13.7 Khaja Primary

Shatal Anaba Anaba Anaba Center

5 5 5 6 5

$ $ $ $ $

45,000.00 Ibeem roofing with GI Sheet 40,000.00 Ibeem roofing with GI Sheet 54,000.00 70,000.00 RCC

CC

N

MoE

15-Aug-08

15-Jul-10

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Said Karam

5

$

70,000.00

CC

N

MoE

15-Aug-08

15-Jul-10

Center Dara Dara

5 4 4

$ $ $

70,000.00 RCC 32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC

N

MoE

15-Aug-08

15-Jul-10

RCC

Dropped due to land problem Replacement of above project

Dropped due to land problem Replacement of above school

8

CC13.8 Astana Kalan Primary School Dara

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

9

CC13.9 Naswane umarz

Dara

6

$

54,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Change in amount as it needs extra work

10

CC13.10 Royedae Shatal

Shatal

6

$

54,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Change in amount as it needs extra work

11

Bibi Ayesha Seddiqa No. 2 CC13.11 Primary School

Rakhah

5

$

45,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Change in amount as it needs extra work

CC13.12 Khawaja Arif Primary School Paryan

5

$

12

-

shalkacha

Paryan

5

$

45,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

13

CC13.13 Faraj High School

Anaba

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

14

CC13.14 Zamankor Primary School

Anaba

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

15

CC13.15 Naswane Abdullah Khail

Dara

6

$

54,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Change in amount as it needs extra work

16

CC13.16 Massoud Shaheed

Hissa Awal

6

$

54,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Change in amount as it needs extra work

17

CC13.17 Abd.Wadood Shaheed Middle Dara

6

$

54,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Change in amount as it needs extra work

18

CC13.18 Astana Kalan Middle School

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Dara

-

Ibeem roofing with GI Sheet

Dropped as it is already built by PRT

19

CC13.19 Tariq Bin Ziyad

Dara

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

20

CC13.20 Jamal warda Primary

Rakhah

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

21

CC13.21 Madrase Dinee Dara

Roy Dara

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

22

CC13.22 Naswane Tamina

Dara

6

$

48,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

23

CC13.23 Naswane Tankhu

Dara

6

$

54,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

-

CC13.24 Perengal/Pasgaran

Dara

4

$

32,000.00

-

Gulabuddin Shaheed High CC13.25 School

Shatal

8

$

24 25 -

CC13.25 Madrase dini CC13.26

Malak Mirza Shaheed High School

CC13.26 Kharau Girls

Shatal

8

$

10

$

Hissa Awal

10

$

80,000.00

10

$

80,000.00

CC13.27 Baba Ali Girls Primary School Dara

64,000.00

Dropped as it is already built by PRT Ibeem roofing withGI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing withGI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC13.28 Sang Gana Girls high School

Center

8

$

64,000.00

Ibeem roofing withGI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC13.29 Madrasae Abu-Hanifa

Paryan

8

$

64,000.00

Ibeem roofing withGI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

28

CC13.30 Unaba high School

Unaba

10

$

80,000.00

Ibeem roofing withGI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

29

CC13.31 Piawasht School Roofing

Ibeem roofing withGI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

$

1,611,000.00

Replacement of above school Dropped as it is already built by PRT

26

$

Replacement of above school Dropped as it is already built by PRT

27

Sub Total

Change in amount as it needs extra work Dropped as it is already built by PRT

-

Dara

Replacement of above school

Dropped (Build by other source)

List of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Schools of Parwan province CC14.1 Yakhdara CC14.2 Bibi Sangari Girls School CC14.3 Sardara Girls School CC14.4 Khak-e-Ghulam Ali CC14.5 Joqol School CC14.6 Dahan-e-Rubat Girls School CC14.7 Shaheed Haqbeen CC14.8 Dawlat khani Girls School CC14.9 Shamal Khail CC14.10 Sharkai Girls School CC14.11 Durrani Girls School CC14.12 Numan Khail CC14.13 Chap Qol Primary School CC14.14 Babah Khail Girls School CC14.15 Siyatank CC14.16 Angur Dara CC14.17 Mandi Qul CC14.17 Naswane Mandi Qul CC14.18 Qalae Bayazid CC14.19 Qalae Zhala CC14.20 Ro Aaab CC14.21 Salah Khan CC14.21 KHWAJA Shahwali CC14.22 Baba khail CC14.23 Ghambaki CC14.24 Khakrez Middle School CC14.25 Naswane Dahane Khakrez CC14.26 Yakh Dara CC14.27 Madrase qamchaq CC14.28 Zakhure qutondar CC14.29 Sahadat CC14.30 madrase haqan ia CC14.31 Madrase saranwal hujat CC14.32 Gunbad darae quli baheer Madrsae Maulawi yar CC14.33 Mahamud CC14.34 Kuhnadeh CC14.35 Madrasae Haqania CC14.36 Sadat Primary CC14.37 Saranwal Hujat CC14.38 Neyazi School CC14.39 Sofi Khil School CC14.40 Shikhan Midle School CC14.41 Wazghar High School CC14.42 Samanderya High School CC14.43 Numanya Ashtar Kheel

Siah Gard Center Shinwari Shiekh Ali Shiekh Ali Shiekh Ali Surkh Parsa Surkh Parsa Koh-e-Safi Koh-e-Safi Koh-e-Safi Koh-e-Safi Jabal Saraj Center Koh-e-Safi Koh-e-Safi Koh-e-Safi Koh-e-Safi Bagram Bagram Salang Salang Salang Ghorband Ghorband Surkh Parsa Surkh Parsa Ghorband Surkh Parsa Ghorband charikar shaikali Surkh Parsa Shinware

8 4 4 4 4 4 4 4 4 4 4 4 4 6 5 5 6 6 4 4 4 4 4 4 4 6 6 6 8 8 6 6 6 6

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

64,000.00 56,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 40,000.00 40,000.00 48,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 48,000.00 48,000.00 80,000.00 80,000.00 60,000.00 60,000.00 60,000.00 60,000.00

Ibeem roofing with GI sheet RCC Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Shinware

12

$

96,000.00

Ibeem roofing with GI sheet

CC

N

MoE

15-Aug-08

15-Jul-10

shinware sheikh Ali Charikar Surkhe Parsa Bagram Shinwari Kohe Safi Sia Gerd Sia Gerd Shinwari Sub Total

6 6 6 6 8 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $

48,000.00 48,000.00 60,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 2,116,000.00

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet Ibeem roofing with GI sheet

CC CC CC CC CC

N N N N N N

MoE MoE MoE MoE MoE MoE

Sep-10 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10

Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

Dropped as built by PRT Replacement of above school

Dropped as the school is not a formal School Replacement of above school

Dropped due to land problem New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed

List of 1 2 3 4 5 6 7 8 9 10 11 12 13 14

schools of Sar-e-Pol Province CC26.1 Farashqan Kalan School CC26.2 Qazaq Malak School CC26.3 Jarghan School CC26.4 Angushta School CC26.4 SHAMAKAI charas School CC26.5 Korak CC26.6 Pushtae Ali CC26.7 Naswane Angute Uzbakia CC26.8 Baghawi Olya Midle School CC26.9 Shakh Dara Balkhab CC26.10 Kharkhash Midle School CC26.11 Yolturab School CC26.12 Mirza walang School CC26.13 tholo School CC26.14 Shaheed Safdari School

List of 1 2 3 4 5

Schools of Takhar Province CC16.1 Katak Jar Middle School CC16.2 Qara Tapa Primary School CC16.3 Chaila Primary School CC16.4 Bashir Abad Middle School CC16.5 Tarma Bhai Primary School

Sancharak Sozma Qala Kohistan Siad Kohistan Saripul Saripul Saripul Center Balkhab Center Gosfandi

10 10 8 8 8 6 4 6 8 4 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

80,000.00 80,000.00 64,000.00 64,000.00 84,000.00 56,000.00 84,000.00 80,000.00 40,000.00 80,000.00 80,000.00 12,000.00 18,000.00 12,000.00 792,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet RCC RCC RCC RCC RCC RCC RCC

CC CC CC CC CC CC CC CC

N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10 Sep-10 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11 Sep-11 Sep-11

5 5 5 6 4

$ $ $ $ $

40,000.00 40,000.00 40,000.00 48,000.00 32,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Sub Total Katak Jar Qara Tapa Chailah Center Center

6

CC16.6 Khwaja Khalil Primary School Center

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

7

CC16.7 Yak Zarang Primary School Shorcha Markaz Primary CC16.8 School Hazrat-e-Usman Middle CC16.9 School CC16.10 Tabatash Chapdarah CC16.11 Ishan abad CC16.12 Punbak School CC16.13 Hazrate zaid School CC16.14 Mansoore Shaheed CC16.15 Maulawi Mahammud Nazar CC16.16 Tashbolaq School CC16.17 Shosh Dara Primary School CC16.18 Kabir Shaheed School CC16.19 Ghulam Hazrat School CC16.20 Chegam Primary School CC16.21 No 1 Girl High School CC16.22 Omar Farooq High School CC16.23 Namakab High School

Center

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Center

4

$

32,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Bad Guzar

10

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Rustaq Yangi qala Chal Rustaq Bangi warih Namakab Namakab Namakab Warsaj Center Rostaq Rostaq Namakab Sub Total

12 12 8 8 8 8 8 8 8 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

96,000.00 Ibeem roofing with GI Sheet 96,000.00 Ibeem roofing with GI Sheet 64,000.00 Ibeem roofing with GI sheet 64,000.00 Ibeem roofing with GI sheet 64,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 80,000.00 Ibeem roofing with GI sheet 1,480,000.00

CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Dropped as built by UNICEF Replacement of above school

New Project Purposed New Project Purposed New Project Purposed Last installment to be paid Last installment to be paid Last installment to be paid

New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed

List of Schools of Kabul Province 1 CC17.1 Deh Yahya High School 2 CC17.2 Tara Khail High School Abdul jan shaheed High 3 CC17.3 School Deh Araban Qargha High 4 CC17.4 School 5 CC17.5 Boya Zar Nasiri High School 6 CC17.6 Danishmand High School 7

Deh Sabz Deh Sabz

8 8

$ $

80,000.00 Ibeem roofing with GI Sheet 80,000.00 Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10

Paghman

8

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Paghman

8

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Shakardara Shakardara

8 8

$ $

80,000.00 Ibeem roofing with GI Sheet 80,000.00 Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10

CC17.7 Hazrat-e-Osman High School Shakardara

8

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Mosahi

8

$

Mosahi Bagrami Bagrami

8 8 8

$ $ $

80,000.00 Ibeem roofing with GI Sheet 80,000.00 Ibeem roofing with GI Sheet 80,000.00 Ibeem roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Bagrami

8

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Bagrami

8

$

80,000.00 Ibeem roofing with GI Sheet

Bagrami Kalakan Qarabagh Farza Guldara

8 8 10 8 8

$ $ $ $ $

Istalif

4

Mir Bachakot Bagrami Shakardara Shakardara Farza Sarobi Sarobi Mir Bachakot Sarobi Sarobi Sarobi Sarobi

4 4 5 4 4 4 4 4

Sarobi Sarobi

4 4

Sarobi

4

Sarobi Shakar dara

8 9 10

Deh Kalan Mosahi High CC17.8 School Mosahi sufla School CC17.9 Alokhail Middle School CC17.10 Habib Jan Shaheed

11

CC17.11

12

CC17.12

-

Haji Shamalai Khan Shaheed (Newly Established)

-

Dropped as it is already built by PRT Replacement of above school

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

Haji Zafran (Newly Established) CC17.13 Botkhak High School CC17.14 Karanda Girls School CC17.15 Abdul Rahman Baba CC17.16 Bustan CC17.17 Guldara Girls Ghulam Haider Shaheed CC17.18 Primary School CC17.19 Qolchaq Primary School CC17.20 Wyar Ahmadzai CC17.21 Karizmir Girls School CC17.22 Shamsul- Madares CC17.23 Madrasae Muskinya CC17.24 Yakhdand Primary CC17.25 Tehzine Ulya CC17.26 Naswane Daku CC17.27 Dabilli CC17.27 In zerai CC17.28 Loy kelai CC17.28 waka Khas CC17.29 Zarandai Kas CC17.29 Sezelai CC17.30 Mainz Ghundi CC17.31 Marwasa CC17.31 Shurab Chashhma CC17.32 Tu Tu Kas CC17.32 Sapar abdullah zai CC17.32 Omarzai Girls School

34

CC17.32 Qalai Wazir Girls High School Bagrami

8

$

Baba Qashqar Girls Primary CC17.32 School CC17.32 Madrasa Sarenwal Janatgul CC17.32 Koshkak Boys, Girls School

Deh Sabz

8

$

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

Bagrami Paghman Sub Total

10 8

$ $ $

100,000.00 Ibeem roofing with GI Sheet 80,000.00 Ibeem roofing with GI Sheet 2,410,000.00

CC CC

N N

MoE MoE

Sep-10 Sep-10

Sep-11 Sep-11

New Project Purposed New Project Purposed

13 14 15 16 17 18

35 36 37

CC

N

MoE

01-Aug-08

15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

$

40,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

40,000.00 40,000.00 50,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 80,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC CC CC CC

N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet

CC

N

MoE

01-Aug-08

4 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

01-Aug-08 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 Sep-11

80,000.00 Ibeem roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

4 4

80,000.00 80,000.00 100,000.00 80,000.00 80,000.00

Dropped asit is not a formal School Replacement of above school Dropped asit is not a formal School Replacement of above school Dropped asit is not a formal School Replacement of above school Dropped asit is not a formal School Replacement of above school Dropped asit is not a formal School Replacement of above school New Project Purposed

List of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Schools of Kunar Province CC18.1 Char Qala Primary School CC18.2 Tango Primary School CC18.3 Zor Barol High School CC18.4 Barikot Girls Primary School CC18.5 Muhabat Kalay High School CC18.6 Barchaki Primary School CC18.7 Bargame Wasat CC18.8 Qalauna primery CC18.9 Darul uleme Chawki CC18.10 Shikhan Midle School CC18.11 Kochyan oh Bila School CC18.12 Nangalam Girls School CC18.13 Shegai Primary School CC18.14 Belai Primary School CC18.15 Chiragul School CC18.16 Degal School CC18.17 Shinkorak School CC18.18 Andar Lachak CC18.19 Bithal

Narang Sarkani Dangam Nari Dara-e-Pech Asad Abad Nari chawki Center Sarkani Darai Pich Usmar Sawkai

Sub Total List of Schools of Jozjan Province Qara Yoot Onchi Primary 1 CC19.1 Darzab Schhool 2 CC19.2 Qarastoon Primary School Darzab 3 CC19.3 Peer Gharab Primary School Darzab 4 CC19.4 Tash Akhor Primary School Qosh Tepa 5 CC19.5 Cheghar Girls High School Mangjak 6 CC19.6 Shakar Qol Primary School Qarqeen 7 CC19.7 Qarqeen girls Primary School Khamab 8 CC19.8 Khamab High School 9 CC19.9 Safar Kol Primary School Aqcha 10 CC19.10 Alkarbat Primary School Mardyan 11 CC19.11 Chelak Ganj Middle School Darzab 12 CC19.12 Aq Bolaq Primary School Qosh Tepa 13 CC19.13 Naswane Arabha Qosh Tepa 14 CC19.14 Abas girls Primary School Mangjak 15 CC19.15 Qazan Naro Primary School Faizabad 16 CC19.16 Niswaney haider abad Aqcha 17 CC19.17 Beljah abdul rahman Mangjak 18 CC19.18 Niswaney sheshah khanah Faizabad Qush Tepa 19 CC19.19 Niswaney khan aqa 20 CC19.20 Bala Mardyan High School Faizabad Shah Saleem Baba Middle 21 CC19.21 Faizabad Schhool 22 CC19.22 Shahr-e-Kohna High School Aqcha Aqcha 23 CC19.23 Umar Khan High School 24 CC19.24 Khanqah High School Khanqah 25 CC19.25 Khan aqaey sagharan Sheberghan 26 CC19.26 Manguti Primary School Sheberghan 27 CC19.27 Chokanah Darz Aab 28 CC19.28 Niswaney darz aab Darz Aab 29 CC19.29 Kochi Hai Qarawol School Faizabad 30 CC19.30 Qazal Qeshlaq Girls School Darzab 31 CC19.31 Sardari Girls School Darzab Sub Total

8 8 10 8 8 6 12 8 8 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

64,000.00 64,000.00 80,000.00 64,000.00 64,000.00 84,000.00 96,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 12,000.00 12,000.00 22,000.00 12,000.00 80,000.00 996,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

01-Aug-08 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10

15-Jul-10 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

4

$

32,000.00

4 4 4 4 4 4 4 6 6 6 6 6 6 6 6 4 4 4 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 48,000.00 32,000.00 32,000.00 32,000.00 64,000.00

Ibeem roofing with IG sheet

CC

N

MoE

01-Aug-08

15-Jul-10

Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG sheet Ibeem roofing with IG Sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

8

$

10 10 8 6 5 8 12 8 8 8

$ $ $ $ $ $ $ $ $ $ $

64,000.00 Ibeem roofing with IG Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 Sep-10 Sep-10 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11 Sep-11 Sep-11

80,000.00 80,000.00 64,000.00 84,000.00 70,000.00 64,000.00 96,000.00 80,000.00 80,000.00 80,000.00 1,642,000.00

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet RCC RCC Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet Ibeem roofing with IG Sheet

completed New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed Last installment to be paid Last installment to be paid Last installment to be paid Last installment to be paid Last installment to be paid

New Proejct Purposed New Proejct Purposed New Proejct Purposed

List of Schools of Kapisa Province Allah Mohammad Shahid CC20.1 Center Middle School 1 CC20.1 Hazrath e khalid school Center Daulat Mohammad Shah 2 CC20.2 Najrab Middle School Abdul Saboor Shaheed Middle 3 CC20.3 Najrab School Hisa 2 4 CC20.4 Ghulam Mustafa 5 CC20.5 Abdul Rashid School Najrab 6 CC20.6 Ghazi khankhail Tagab 7 CC20.7 Said Aqa Alah Sai 8 CC20.8 Hayatullah Alah Sai 9 CC20.9 Hamidul madares Tagab 10 CC20.10 Abu Zar ghafari Najrab 11 CC20.11 Fatul madares Najrab 12 CC20.12 Madrasae Khal Mohammad Kohband Hisa 2 13 CC20.13 Salman Farsi 14 CC20.14 Faiza Tagab 15 CC20.15 Abdul Manan Alah Sai 16 CC20.16 Delyar Girls Middle School Najrab 17 CC20.17 Sultan Khail Middle School Alah Sai 18 CC20.18 Haq Parast Middle school Alah Sai 19 CC20.19 Naswane Qala Khan Najrab 20 CC20.20 Mawlana Abd.Zahir Hisa Awal Kohistan Najrab 21 CC20.21 Naswane Darae kalan 22 CC20.22 Naswane mir Ahmad Alah Sai 23 CC20.23 Hassan Abad middle Alah Sai 24 CC20.24 Naswane Shirak Pirak hisa 2 Niak Mohammad Shaheed 25 CC20.25 Najrab School Sub Total List of Schools of Nemroz Province Zaranj 1 CC21.01 Feroza Gai 2 CC21.02 Naswane Markaz Primary Zaranj 3 CC21.03 Danu Gadal Chaqansur 4 CC21.04 Sistan Middle School Khashrud Shaheed Gul Mohammad 5 CC21.05 Center School Center 6 CC21.06 Farkhi School 7 CC21.07 De Morda School Center

6

$

6

$

84,000.00

-

8

$

12 12 10 8 8 8 10 10 12 10 8 4 4 4 4 4 6 6 6 6 4 6 8

$

Dropped as it is already built by PRT CC

N

MoE

01-Aug-08

15-Jul-10

64,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

$

96,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

96,000.00 80,000.00 64,000.00 64,000.00 64,000.00 80,000.00 80,000.00 96,000.00 80,000.00 64,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 48,000.00 48,000.00 48,000.00 48,000.00 32,000.00 48,000.00

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

64,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

01-Aug-08

15-Jul-10

$

RCC

Replacement of above school

1,508,000.00

8 8 8 12

$ $ $ $

64,000.00 64,000.00 64,000.00 96,000.00

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

01-Aug-08 01-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

8 8

$ $

80,000.00 Ibeem Roofing with GI Sheet 80,000.00 Ibeem Roofing with GI Sheet

CC CC

N N

MoE MoE

Sep-10 Sep-10

Sep-11 Sep-11

New Project Purposed New Project Purposed

8

CC21.08 Kanak Din Mohammad School Center

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

9

CC21.09 Shaheed Habib School

8

$ $

80,000.00 Ibeem Roofing with GI Sheet 688,000.00

CC

N

MoE

Sep-10

Sep-11

New Project Purposed

Center Sub Total

List of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Schools of Nooristan Province CC22.01 Mandighar girls CC22.01 Zakure tetin CC22.02 Samarbagh CC22.02 shtwi girls school CC22.03 Kutya CC22.04 Pule-rustam CC22.04 Pashki girls school CC22.05 Gadhwal CC22.06 Abzuk CC22.06 Wamae qadeem Primary CC22.07 Dewana-baba CC22.07 mashpa primary school CC22.08 Darulhulume Bargimatal CC22.09 Wadahu Arnas Girls school CC22.10 Shuk boys school CC22.11 kulam girls CC22.11 Nashi gram girls school CC22.12 Suna Gala CC22.13 Sawu Primery CC22.14 Hamshoz Midle School CC22.15 Darul Ulom Waigal Arnas CC22.16 Waigal Girls High School CC22.17 Jonia Primary School CC22.18 Kolum Girls Midle School CC22.19 Nilab Primary School CC22.20 Piar Girls School CC22.21 Pala Gal School CC22.22 Jonia School CC22.23 Kolam School CC22.24 Pashgar Girls School CC22.25 Mashook Malik School CC22.26 Kultan/Takra School CC22.27 Mandil/Malil School CC22.28 Shakoorzada School CC22.29 Karach School CC22.30 Mandool School

List of 1 2 3

Schools of Laghman Province CC23.01 Saalabe Ulya CC23.02 Salar Sofla CC23.03 Karanj Primary School Shaheed Mohammad Ismal CC23.04 Tariq High School Char Bagh Girls Prmary CC23.05 School CC23.06 Manjan Primary School CC23.07 Abi Now Primary School

4 5 6 7

Kamdish NoorGram Kamdish parun Kamdish Kamdish parun Mandul Bargimatal wama Bargimatal NoorGram Bargimatal NoorGram waigal Dawaba Dawaba waigal Nari Nari Waigal Waigal Waigal Do Aab Do Aab doab doab doab doab doab NoorGram NoorGram NoorGram NoorGram Mandol Mandol Mandol Sub Total

6 6 4 4 4 4 4 4 4 4 4 4 8 5 5 5 5 5 5 4 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Alingar Alingar Mehtarlam

6 8 8

Alingar Qarghayee Ali Shang Alingar Sub Total

48,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 64,000.00 40,000.00 40,000.00 40,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 5,513.85 23,986.56 5,513.85 5,513.85 2,313.85 5,513.76 5,513.81 5,513.81 5,513.85 5,513.85 5,513.85 5,513.85 824,000.00

Dropped due to security reasons Replacement of above project Dropped due to security reasons Replacement of above project

Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet Ibeem roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

CC CC CC CC CC

N N N N N

MoE MoE MoE MoE MoE

Sep-10 Sep-10 Sep-10 Sep-10 Sep-10

Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

$ $ $

48,000.00 Ibeem Roofing with GI Sheet 80,000.00 Ibeem Roofing with GI Sheet 80,000.00 Ibeem Roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

01-May Sep-10 Sep-10

15-Jul-10 Sep-11 Sep-11

New Proejct Purposed New Proejct Purposed

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Proejct Purposed

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Sep-10

Sep-11

New Proejct Purposed

8 8

$ $ $

80,000.00 Ibeem Roofing with GI Sheet 80,000.00 Ibeem Roofing with GI Sheet 528,000.00

CC CC

N N

MoE MoE

Sep-10 Sep-10

Sep-11 Sep-11

New Proejct Purposed New Proejct Purposed

Droppeddue to security reasons Replacement of above project Dropped.security reasons Replacement of above project Dropped due to security reasons Replacement of above project Built by other source Replacement of above school Dropped due to security reasons Replacement of above school Dropped due to security reasons Dropped due to security reasons New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid Shifted from EQUIP I/Last Installment to be paid

List of Schools Of Urozgan Province 1 CC24.01 Tarinkoot madrasa 2 CC24.02 Chorah madrasa 3 CC24.03 Deh raward Madrasa CC24.04 Gazab Madrasa 4 CC24.04 Kata khanjak Madrasa CC24.05 Kahs urozgan Madrasa 5

Terinkoot Chorah Dehrawood Gizab Terinkoot khas Urozgan

8 8 8 8 8 8

$ $ $ $ $ $

80,000.00 80,000.00 80,000.00 80,000.00 80,000.00

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10 15-Jul-10

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC

N N

MoE MoE

15-Aug-08 15-Aug-08

15-Jul-10 15-Jul-10

6

CC24.06 Char chena Madrasa school

charchina

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

15-Aug-08

15-Jul-10

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

CC24.07 Chenarto Madrasa school CC24.08 Sar chakhli Boys CC24.09 Sar chakhli Girls CC24.10 Sadmardah CC24.11 Dehjawz Barakzai CC24.12 Sarkhum-e- sufla CC24.13 Jangi karez CC24.14 Malezi Sufla CC24.15 Kochian CC24.16 To To Sufla CC24.17 Durji CC24.18 Mukhtalat Now abad CC24.19 sar kila CC24.20 Pay kila CC24.21 Sery School CC24.22 Naw abad kochyan CC24.23 Qala Rag CC24.24 Wacha wyala CC24.25 Sarchina CC24.26 Abe-e- Ulya CC24.27 Kalily CC24.28 Kotal CC24.29 Kuhna Qala-e- Ulia CC24.30 Zerkoh CC24.31 Kawrai CC24.32 Siyah Ghar CC24.33 Chorah high School CC24.34 Jangi Karez CC24.35 Shin Ghula CC24.36 Sahoor School CC24.37 Qarya Shiwak School CC24.38 Shah Hussain School CC24.39 Sorkh Murghab School CC24.40 Abas Ali School CC24.41 Garmab Sufla School CC24.42 Babur Quli School CC24.43 Thori School CC24.44 Charamgar Girls School CC24.45 Sinan School CC24.46 Shnaqala School CC24.47 Sajawal School CC24.48 Sadmurda School CC24.49 Nawabad Salambaba School CC24.50 Safid Khar School

chenarto Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Dehrawood Dehrawood Chorah chorah chorah chorah Terinkoot chorah Chorah Chorah Chorah chorah Chorah chenarto chenarto chenarto chenarto Terinkoot Terinkoot Dehrawood Gizab Center Center Center Center Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot Terinkoot

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 8 8 8 8 8

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 18,000.00 18,000.00 19,000.00 30,000.00 18,000.00 18,000.00 18,000.00 48,000.00 18,000.00 18,000.00

CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC

N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE MoE

15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 15-Aug-08 Sep-10 Sep-10 Sep-10 Sep-10 Sep-10

15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 15-Jul-10 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

51

CC24.51 Haramshah / Mianghar School Terinkoot

52 53 54 55 56 57 58 59 60 61 62 63

CC24.52 Sabzabad/Patan School CC24.53 Wani/Hisar School CC24.54 Seyaghar School CC24.55 Chalbi School CC24.56 Chinarthu High School CC24.57 Ishfiluq School CC24.58 Sakzai School CC24.59 Seyasang School CC24.60 Sharthughii School CC24.61 Warjan School CC24.62 Kamkooch School CC24.63 Mazar School

Terinkoot Terinkoot Chinarthu Chinarthu Chinarthu Chinarthu Dehrawood Dehrawood Dehrawood Dehrawood Dehrawood Dehrawood Sub Total

$ $ $ $ $ $ $ $ $ $ $ $ $ $

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

18,000.00 Ibeem Roofing with GI Sheet 30,000.00 18,000.00 48,000.00 48,000.00 36,000.00 10,000.00 18,000.00 18,000.00 18,000.00 30,000.00 30,000.00 30,000.00 3,195,000.00

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

Dropped due to security reasons Replacement of above

New Project Purposed New Project Purposed New Project Purposed New Project Purposed New Project Purposed Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid

List of Schools Of Kandahar Province CC25.1 Peer Md. Kakar high School 1 CC25.2 Wahab Zai CC25.2 Haji Abdul Hanif 2 CC25.3 Pashmul CC25.3 Pashmul Primary 3 CC25.4 shaheedan Ghundai 4 CC25.5 Madrasae Dinee 5 CC25.6 zala khan primary CC25.6 Salehan primary school 6 CC25.7 Talu kan CC25.7 shaik kqalandar baba 7 CC25.8 Badizoy Chel Ghor CC25.8 Naswane shahrak 8 9 CC25.9 Ghaibana Baba CC25.10 Timor Shahi High School 1 CC25.11 Sofi Sahib Girls High School 2 Mahmood Hotaki Middle 3 CC25.12 School

Zhelae Zhelae Zhelae Zhelae Zhelae Zhelae Zhelae Panjwai Panjwai Panjwai Panjwai Panjwai Panjwai Panjwai Center Center

10 6 6 6 6 8 8 8 8 6 6 6 6 8

Ibeem Roofing with GI Sheet

CC

N

MoE

15-Jun-08

15-Jul-10

Ibeem Roofing with GI Sheet

CC

N

MoE

15-Jun-08

15-Jul-10

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

15-Jun-08 15-Jun-08 15-Jun-08

15-Jul-10 15-Jul-10 15-Jul-10

Ibeem Roofing with GI Sheet

CC

N

MoE

15-Jun-08

15-Jul-10

Ibeem Roofing with GI Sheet

CC

N

MoE

15-Jun-08

15-Jul-10

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Rehabilitation Rehabilitation

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Jun-08 15-Jun-08

15-Jul-10 15-Jul-10

2,755.00

Rehabilitation

CC

N

MoE

Rehabilitation

$

2,578.00

Rehabilitation

CC

N

MoE

Rehabilitation

Center

$

10,854.00

Rehabilitation

CC

N

MoE

Rehabilitation

Center Center Center Arghandab

5

$ $ $ $

7,267.00 Rehabilitation 16,337.00 Rehabilitation 5,841.00 Rehabilitation 40,000.00 Ibeem Roofing with GI Sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

Oct-10

Oct-11

Rehabilitation Rehabilitation Rehabilitation Shifted from EQUIP I/ Planed for1389

Boldak

5

$

40,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

Boldak

4

$

32,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

12

CC25.21 Mahmood Jalali Deni Madrasa Boldak

4

$

32,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

13 14 15 16 17 18

CC25.22 Ali Nika Wish School CC25.23 Abdul Jabar Khan School CC25.24 Hasan Zoe School CC25.25 Shir Aka Primary School CC25.26 Farmi Tarnak School CC25.27 Khoshab School

Boldak Boldak Takhtapul Takhtapul Daman Daman

4 4 4 4 4 4

$ $ $ $ $ $

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC CC CC CC CC

N N N N N N

MoE MoE MoE MoE MoE MoE

Oct-10 Oct-10 Oct-10 Oct-10 Oct-10 Oct-10

Oct-11 Oct-11 Oct-11 Oct-11 Oct-11 Oct-11

Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389

19

CC25.28 Shinghazi Baba High School

center

8

$

64,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

20

CC25.29 Zarghuna Ana Middle School Center

6

$

48,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

21

CC25.30 Kaka Sayed Ahmad School Center Mashriqi/Sofi Sahib Girls High CC25.31 Center School Faqiranu Kalay/Khalid Bin CC25.32 center Walid School Center CC25.33 Piru Kalacha School CC25.34 Nisaji/Jaikan School Daman Hazrat Bilal/Shaheed Sardar Center CC25.35 M. Dawood School CC25.36 Gariwal School Center Haji Arab/Kotal Morcha CC25.37 Center School

6

$

48,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

8

$

64,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

6

$

48,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

6 6

$ $

48,000.00 Ibeem Roofing with GI Sheet 48,000.00 Ibeem Roofing with GI Sheet

CC CC

N N

MoE MoE

Oct-10 Oct-10

Oct-11 Oct-11

Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389

6

$

48,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

6

$

48,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

6

$

48,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

80,000.00 48,000.00 48,000.00 64,000.00 64,000.00 64,000.00 48,000.00 48,000.00 64,000.00 3,636.00 12,005.00

Center

$

CC25.13 Zarghuna Ana Middle School Center

5

CC25.14 Ahmad Shahi Middle School

6 7 8 9

11

CC25.15 Aino Middle School CC25.16 Nisaji High School CC25.17 Azimullah Shaheed School CC25.18 Joe Lahore School Mullah Mohammad Akbar CC25.19 School CC25.20 Malak Wazir School

4

10

22 23 24 25 26 27 28

Dropped due to security reasons Replacement of above Dropped due to security reasons Replacement of above

Dropped due to security reasons Replacement of above Dropped due to security reasons Replacement of above Dropped due to security reasons Replacement of above Rehabilitation Rehabilitation

29

CC25.38 Zarghuna Ana Middle School Center

2

$

16,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

Shifted from EQUIP I/ Planed for1389

30 31

CC25.39 Seyori School CC25.40 Bagh Agha School

4 4

$ $ $

32,000.00 Ibeem Roofing with GI Sheet 32,000.00 Ibeem Roofing with GI Sheet 1,517,273.00

CC CC

N N

MoE MoE

Oct-10 Oct-10

Oct-11 Oct-11

Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389

Nish Nish Sub Total

List of Schools of Baghlan Province 1 CC 26.1 Dare Ashraf Attachment of Abdul Razaq 2 CC 26.2 Shaheed 3 CC 26.3 Speen Joomat 5 CC 26.4 Abdul Qadir Akhunzada

doshi

Central Baghlan

10

$

100,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

15-Jun-08

15-Jul-10

6

$

60,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

6 6

$ $ $

60,000.00 Ibeem Roofing with GI Sheet 48,000.00 Ibeem Roofing with GI Sheet 268,000.00

CC

N

MoE

Oct-10 Oct-10

Oct-11 Oct-11

New Project Purposed Shifted from EQUIP I/ Planed for1389

8 8 6 8

$ $ $ $ $

Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet

CC CC CC CC

N N N N

MoE MoE MoE MoE

15-Aug-08 Oct-10 Oct-10 Oct-10

15-Jul-10 Oct-11 Oct-11 Oct-11

12 12

$ $

96,000.00 Ibeem Roofing with GI Sheet 96,000.00 Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet 461,364.00 Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet Ibeem Roofing with GI Sheet 653,364.00

CC CC

N N

MoE MoE

Oct-10 Oct-10

Oct-11 Oct-11

New Project Purposed New Project Purposed Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid

Sub Total List of Schools of Faryab Province 1 CC 27.1 Ghali Khana boys School 2 CC 27.2 Toop Khana Qala 3 CC 27.3 Dahan Dara Gilam Baf 4 CC 27.4 Qarayee Boys

Doshi

Sub Total List of Schools of Farah Province CC 28.1 Pashto Zhbe School 1 CC 28.2 Merman Nazo Qesm Awal 2 CC 28.3 Sabzgazi School 3 CC 28.4 Chargook Girls School 4 CC 28.5 Qooch Primary School 5 CC 28.6 Nawbar School 6 CC 28.7 King School 7 CC 28.8 Shashak Girls School 8 CC 28.9 Panjla School 9 10 CC 28.10 Qalai Mohammad School 11 CC 28.11 Ilyas Abad School 12 CC 28.12 Boomadiha School 13 CC 28.13 Gink School 14 CC 28.14 Chahi Zandan School 15 CC 28.15 Farib Girls School 16 CC 28.16 Jorak School 17 CC 28.17 Luftan Girls School 18 CC 28.18 Panjdeh School 19 CC 28.19 Gurgak School 20 CC 28.20 Kalathi Alam Khan School 21 CC 28.21 Dehzak School 22 CC 28.22 Pio Pasab School 23 CC 28.23 Nang Abad School 24 CC 28.24 Islamabad School 25 CC 28.25 Larwand School 26 CC 28.26 Sarmushkan School 27 CC 28.27 Faizabad School 28 CC 28.28 Larthi School 29 CC 28.29 Ghazi Abad School 30 CC 28.30 Shagai School 31 CC 28.31 Kariz Surkha School

Center Center Join Join Join Pushti Kooh Anardara Shib Koh center center center Shib Koh Pushti Kooh Pushti Kooh Shib Koh Shib Koh joen joen anardara Anardara bala balook bala balook Khak Safid Khak Safid Purchaman Purchaman Gulistan Gulistan Bakwa Bakwa Shib Koh Sub Total

List of Schools of Khost Province 1 CC 29.1 Degan Midle School 2 3

CC 29.2 Shamal Piran High School

CC 29.3 Maton School Sub Total List of Schools of Kabul City Province 1 CC 30.1 Ariana School 2 CC 30.2 Qari Abdullah 3 CC 30.3 Rabia Balkhi Girls School 4 CC 30.4 Qari Abdullah

$

$

88,000.00 88,000.00 66,000.00 88,000.00 330,000.00

New Project Purposed New Project Purposed New Project Purposed

Ismayel Khil

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

Center

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

Center

8

$ $

80,000.00 Ibeem Roofing with GI Sheet 240,000.00

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

4 4

$ $ $ $ $

30,000.00 Ibeem Roofing with GI Sheet 40,000.00 Ibeem Roofing with GI Sheet Rehabilitation 17,771.00 2nd Building Rehabilitation 87,771.00

CC CC CC CC

N N N N

MoE MoE MoE MoE

Oct-10 Oct-10 Oct-10 Oct-10

Oct-11 Oct-11 Oct-11 Oct-11

Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389 Shifted from EQUIP I/ Planed for1389

Sub Total

List of Schools of Samangan Province 1 CC.31.1 Khwaja Boland School 2 CC.31.2 Abohanifa High School 3 CC.31.3 Chardi Primary School Abkhorak Ulia Primary 4 CC.31.4 School

Aybak Dare Sorkh Payan Dare Sorkh Bala

6 6 8

$ $ $

60,000.00 Ibeem Roofing with GI Sheet 60,000.00 Ibeem Roofing with GI Sheet 80,000.00 Ibeem Roofing with GI Sheet

CC CC CC

N N N

MoE MoE MoE

Oct-10 Oct-10 Oct-10

Oct-11 Oct-11 Oct-11

New Project Purposed New Project Purposed New Project Purposed

Roy do aab

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

5

CC.31.5 Galwan Sai Primary School Dare Soof

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

6

CC.31.6 Paytangi School

6

$

60,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

7

CC.31.7 Karte Mamorin Girls School Markaz

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

Roy do aab

Sub Total List of Schools of Kundoz Province Wazir Mohammad Gul 1 CC 32.1 Khan School 2 CC 32.2 Kharoti School 3 CC 32.3 Alchin Midle School List of Schools of Hilmand Province Karthi Mamorin Girls 1 CC 33.1 School Karthi Mamorin Boys 2 CC 33.2 School

Archee

$

500,000.00

8

$

80,000.00 Ibeem Roofing with GI Sheet

CC

N

MoE

Oct-10

Oct-11

New Project Purposed

8 8

$ $ $

80,000.00 Ibeem Roofing with GI Sheet 80,000.00 Ibeem Roofing with GI Sheet 240,000.00

CC CC

N N

MoE MoE

Oct-10 Oct-10

Oct-11 Oct-11

New Project Purposed New Project Purposed

Lashkargah

$

12,000.00 Ibeem Roofing with GI Sheet

Center Imam Sahib Sub Total

Lashkargah

$

12,000.00 Ibeem Roofing with GI Sheet

3

CC 33.3 Karthi Bolan

Lashkargah

$

16,000.00 Ibeem Roofing with GI Sheet

4

CC 33.4 Ahli Hanood Safian

Lashkargah

$

8,000.00 Ibeem Roofing with GI Sheet

5

CC 33.5 Dashthi Bolan Boys School Lashkargah

$

8,000.00 Ibeem Roofing with GI Sheet

6

CC 33.6 C1 Karthi Lagan

$

12,000.00 Ibeem Roofing with GI Sheet

7

CC 33.7

$

8,000.00 Ibeem Roofing with GI Sheet

8

CC 33.8 Boolan Markazi School

$

8,000.00 Ibeem Roofing with GI Sheet

Lashkargah

Abul Fathhi Boosthi Middle Girashk School Lashkargah

9

CC 33.9 Hazrat Hamza School

Girashk

$

8,000.00 Ibeem Roofing with GI Sheet

10

CC 33.10C1 Karthi Lagan

Lashkargah

$

16,000.00 Ibeem Roofing with GI Sheet

11

CC 33.11Nawamish Baghran School Baghrab

$

16,000.00 Ibeem Roofing with GI Sheet

12

Lashkari Bazar Gharbi CC 33.12 School

$

857

Grand Total:

Lashkargah

$ $

8,000.00 Ibeem Roofing with GI Sheet 132,000.00 43,818,408.00

Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid Shifted from EQUIP I Last installment to be paid

Planned/Actual Date

SL No.

1 Trainings

Contract Package Number*

Name of Contract (Brief Description)

2

Qty

3

1

T1

MOE Head of Departments Trainings, Bangaladish

2

T2

Provincail Trainings

3

T3

4

T4

4

5

6

IDA Prior Procedur Contract Signing/ Review e/ Method Actual Date of Date of Completion (Y/N) Contract Signing 7

8

09-Jan-00

Name of Consultant

Progress of Procurement as of

Remarks

11

12

13

10-Jan-00

$0.00

$0.00

Y

07-Feb-07

30,Jan,08

NA

NA

Dropped

8

$244,725.00

$50,000.00

Y

07-Feb-07

30-Jan-08

NA

NA

Partially taken place.Details under Compilation

5

T5

6

T6

Teacher Training InSet1 Roll Out @65$

30’000

7

T7

Teacher Training Scholarship@6615$

400

8

T8

$0.00

$0.00

Y

01-Feb-07

01-Feb-08

NA

NA

Dropped

$0.00

$0.00

Y

01-Feb-07

01-Feb-08

NA

NA

Dropped

$0.00

$0.00

Y

01-Feb-07

01-Feb-08

NA

NA

Dropped

$1,950,000.00

$232,000.00

Y

01-Feb-07

01-Feb-08

NA

NA

Committedin bothEquip I and Equip II Dropped

$0.00

$0.00

Y

01-Feb-07

01-Feb-08

NA

NA

4

$18,000

$0

N

01-Apr-09

31-Dec-10

NA

NA

22750

$377,650

$0

Y

10-Aug-10

09-Aug-11

NA

NA

New Training Proposed

210

$104,760

$0

N

10-Aug-10

09-Aug-11

NA

NA

New Training Proposed

1158

$110,010

$0

N

10-Sep-10

09-Sep-11

NA

NA

New Training Proposed

$7,500

$0

N

10-Sep-10

09-Sep-11

NA

NA

New Training Proposed

$2,812,645.00

$282,000.00

9

T9

10

T10

11

T11

Provincial Monitoring & Evaluation Staff Training

12

T12

Trainning inside the country for EMIS Staff 5 Grand Total:

Actuals

12

TED Preparation Training for (India 204 Scholarship Candidates)@419$ Teacher Training upgrading from Grad-12 10’000 to Grad-14@100$ Teacher Training upgrading to Grad10’000 12@50$

Training for procurement officers of MOE at ASCI,INDIA or any other reputed institute SMC Training Provincial Social Mobilization Staff Training

OriginallyEstimated Cost

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Budget

SL No.

1

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

2 3 4 In-Service Section (DT3 Program)

Actual

5

6

7

8

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

9

10

Name of Consultant

11

Progr ess of Proc urem ent as of 12

1

TE51.1

Senior DT3 Coordinator

8

$128,000.00

$0.00

IC

Y

01-Aug-10

31-Mar-11

Vacant

N/A

2

TE51.2

Senior DT3 Manager

12

$48,000.00

$48,000.00

IC

N

21-Mar-10

20-Mar-10

Mohammidi gul Wahidi

N/A

3

TE51.3

Senior DT3 Manager

12

$48,000.00

IC

N

01-Jul-10

30-Jun-11

Vacant

N/A

4

TE51.4

DT3 Technical Advisor

8

$80,000.00

IC

Y

01-Jul-10

31-Mar-11

Vacant

N/A

5

TE51.5

12 DT3 Finance & Admin Officer

$24,000.00

IC

N

21-Mar-10

20-Mar-10

Vacant

N/A

6

TE51.6

DT3 Monitoring Officer

12

$24,000.00

IC

N

01-Jul-10

30-Jun-11

Vacant

N/A

7

TE51.7

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Nasrullah

N/A

8

TE51.8

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Seema

N/A

9

TE51.9

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Kanishka Shabi

N/A

10

TE51.10

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Shah Piray

N/A

11

TE51.11

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Ghulam Rabani

N/A

12

TE51.12

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Abdul Aziz

N/A

13

TE51.13

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Enayatullah Zaland

N/A

14

TE51.14

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Sardar Hussian

N/A

15

TE51.15

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Sherzaman Abasin

N/A

16

TE51.16

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Najibullah

N/A

17

TE51.17

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Ali Shah

N/A

18

TE51.18

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Mohammad Arif

N/A

19

TE51.19

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Allah Mohammad

N/A

20

TE51.20

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Gul Kaarim

N/A

$0.00

$0.00

$0.00

$0.00

Remarks

13 already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

Progr ess of Proc urem ent as of

21

TE51.21

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Ghoshma Gul

N/A

22

TE51.22

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Mohammad Alim

N/A

23

TE51.23

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Shah Mohammad

N/A

24

TE51.24

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Mohammad Hussain Rahimi

N/A

25

TE51.25

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Sayed Rahim

N/A

26

TE51.26

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Saif Ul Rahman

N/A

27

TE51.27

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Besmillah Abid

N/A

28

TE51.28

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Mohammad Qahir

N/A

29

TE51.29

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Habib Sharanwal

N/A

30

TE51.30

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Shamsull Habib

N/A

31

TE51.31

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Soorgul Mosadiq

N/A

32

TE51.32

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Palwasha

N/A

33

TE51.33

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Abdul Saboor

N/A

34

TE51.34

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Mohammad Shafi Stanikzi

N/A

35

TE51.35

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Ahmad Sharif

N/A

36

TE51.36

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Abd Safdar

N/A

37

TE51.37

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Fazal Rahman

N/A

38

TE51.38

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Pir Mohammad

N/A

39

TE51.39

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Abd Haq

N/A

40

TE51.40

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Abd Raqib

N/A

41

TE51.41

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Wazir Gul

N/A

Remarks

already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

Progr ess of Proc urem ent as of

42

TE51.42

DT3 Database Officer

12

$18,000.00

$18,000.00

IC

N

21-Mar-10

20-Mar-10

Sadaqat Ali

N/A

43

TE51.43

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Mustafa

N/A

44

TE51.44

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Hamid Rehman

N/A

45

TE51.45

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Sebghatullah

N/A

Remarks

already existing in equip II already existing in equip II already existing in equip II already existing in equip II

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

Progr ess of Proc urem ent as of

46

TE51.46

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Mustafa

N/A

47

TE51.47

DT3 IT Officer

12

$18,000.00

$18,000.00

IC

N

21-Mar-10

20-Mar-10

Fareedullah Kharotai

N/A

48

TE51.48

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Besmillah

N/A

49

TE51.49

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Gul Rahman

N/A

50

TE51.50

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Imaduddin

N/A

51

TE51.51

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Waisuddin

N/A

52

TE51.52

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Said Abdul Salam

N/A

53

TE51.53

DT3 Monitor

12

$8,400.00

$8,400.00

IC

N

21-Mar-10

20-Mar-10

Abdul Matin

N/A

54

TE51.54

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Solaiman

N/A

55

TE51.55

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Sharifuddin

N/A

56

TE51.56

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

vacant

N/A

57

TE51.57

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Rahimullah

N/A

58

TE51.58

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

fayaz

N/A

59

TE51.59

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

M. Qayoum Bahir

N/A

60

TE51.60

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Zubair

N/A

61

TE51.61

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Said Khalid Ahmad

N/A

62

TE51.62

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Hazar Gul

N/A

63

TE51.63

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Nangyaly Hashimi

N/A

64

TE51.64

DT3 Data Entry Technician12

$4,800.00

$4,800.00

IC

N

21-Mar-10

20-Mar-10

Fazal Akbar

N/A

$0.00 65

TE51.65

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

Newly proposed

Remarks

already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II Newly proposed and approved by WB

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

TE51.66

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

Newly proposed

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

Newly proposed

Newly proposed and approved by WB

$0.00 67

TE51.67

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 68

TE51.68

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 69

TE51.69

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 70

TE51.70

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 71

TE51.71

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 72

TE51.72

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 73

TE51.73

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 74

TE51.74

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 75

TE51.75

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 76

TE51.76

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 77

TE51.77

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 78

TE51.78

DT3 Data Entry Technician 9

$4,500.00

IC

N

01-Jul-10

31-Mar-11

$0.00 79

TE51.79

Executive Assistant Subtotal:

Pre-Service Section

9

$10,800.00 $878,200.00

IC $500,400.00

N

01-Jul-10

31-Mar-11

Remarks

Newly proposed and approved by WB

$0.00 66

Progr ess of Proc urem ent as of

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

Progr ess of Proc urem ent as of

80

TE52.1

Senior Manager

12

$48,000.00

$40,800.00

IC

N

21-Mar-10

20-Mar-11

abdul haq rahmati

81

TE52.2

12 Senior Manager Scholarships

$48,000.00

39600

IC

N

01-Feb-10

31-Jan-11

gul agha ahmadi

N/A

82

TE52.3

TTC Development Officer 12

$24,000.00

24000

IC

N

14-Dec-09

13-Dec-10

abdul wahab

N/A

$0.00

0

IC

N

01-Apr-09

31-Mar-10

$24,000.00

$16,800.00

IC

N

01-Apr-10

31-Mar-11

sifatullah saboon

N/A

$144,000.00

$121,200.00

12

83

TE52.4

Distance Education Officer 12

Subtotal:

N/A

Remarks

already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II

Curriculum & Standards $0.00 84

TE52.5

$48,000.00 12 Curriculum & Standard Development Senior Manager

85

TE52.6

Curriculum Advisor

12

$196,000.00

86

TE52.7

Research Officer

12

$24,000.00

IC

N

01-Jul-10

30-Jun-11

Vacant

N/A

IC

Y

01-Jul-10

30-Jun-11

Vacant

N/A

IC

N

01-Jul-10

30-Jun-11

Vacant

N/A

31-Mar-11

Amir mohammad Mansory

N/A

$0.00

$0.00

Snr. Technical Advisor 87

12

TE52.8 Subtotal:

IC $196,000.00

$196,000.00

$464,000.00

$196,000.00

Y

01-Jul-10

already existing in equip II already existing in equip II already existing in equip II already existing in equip II

National Teacher Traninig Institute (NTTI) $0.00 88

TE53.1

Institute Senior Manager 12

$48,000.00 $48,000.00

Subtotal:

IC

N

01-Jul-10

30-Jun-11

Vacant

already existing in N/A equip II

$0.00

General Services IC 89

TE54.1

Computer Operator

12

$6,000

$6,000

90

TE54.2

Computer Operator

12

$12,000

$12,000

91

TE54.3

IT Incharge Officer

12

$17,280

$17,280

92

TE54.4

Admin/Logistic Officer

12

$17,280

93

TE54.5

6 MOE) Senior procurement officer(at

$12,000

$12,000

94

TE54.6

9 Procurement Assistant(at MOE)

$9,000

$9,000

95

TE54.7

6 $24,000 Translator(English-Dari)for Procurement(MOE)

$24,000

96

TE54.8

$24,000 Administrative Assistant for 9Procurement (MOE)

$24,000

N

21-Mar-10

20-Mar-11

Toryalai

N/A

N

21-Mar-10

20-Mar-11

Mirwais Rasouly

N/A

N

21-Mar-10

20-Mar-11

Ahmad Samim

N/A

N

21-Mar-10

20-Mar-11

Vacant

N/A

N

21-Mar-10

15-Sep-10

Matin rasoly

N/A

N

21-Mar-10

31-Dec-10

Parviz Samah

N

21-Mar-10

14-Aug-10

Fahim

N/A

N

21-Mar-10

07-Oct-10

Maisara

N/A

IC

IC

$0.00

IC

IC

IC

IC

IC Subtotal: EMIS Development Requirements

$121,560

$104,280

already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II already existing in equip II

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

$0.00 97

TE55.1

Sr. EMIS advisor

$54,000

9

IC

98

TE55.2

System Analyst

12

$31,200

$31,200

99

TE55.3

System Developer

11

22000

22000

100

TE55.4

$22,500 Database developers and Programmer 10

TE55.5

$27,000 Database developers and Programmer 9

IC

01-Jul-10

31-Mar-11

01-Jan-09

31-Mar-10

Y

01-Apr-10

31-Mar-11

Hameedullah Sherani

Y

25-Apr-10

31-Mar-11

Mohammad Ilyas

Y

10-May-10

31-Mar-11

Mirwais Ahmadzai

Y

01-Jul-10

31-Mar-11

Vacant

Y

IC

IC $22,500

Vacant

IC

Subtotal:

$156,700

$75,700

$26,840.00

$26,840.00

Progr ess of Proc urem ent as of

Remarks

already existing in II N/A equip already

existing already in existing in already existing in N/A equip II already existing in N/A equip II already existing in N/A equip II N/A

ICT MANAGEMENT UNIT TEAM .Sr. Network Administrator 101

TE56.1

102

TE56.2

103

TE56.3

104

TE56.4

11

.Sr. Database Administrator 10

Sr. Technician

10

Hardware Technician

12

IC

Y

01-May-10

31-Mar-11

Ahmad Shah

N/A

$0.00

IC

N

01-Jul-10

31-april-11

Vacant

N/A

$0.00

IC

N

01-Jul-10

31-april-11

Vacant

N/A

IC

N

21-Mar-10

20-Mar-11

Mohammad Shafi

N/A

$24,000.00

$14,400.00

$17,280.00

$17,280.00

$82,520.00

$44,120.00

11

$0.00

$0.00

01-Apr-05

28-Feb-06

12

$0.00

$0.00

01-Jun-06

31-May-07

18

$0.00

$0.00

01-Jun-07

30-Jun-08

24

$0.00

$0.00

01-Jul-08

26-Jul-08

18

$0.00

$0.00

06-Jan-09

05-Jul-10

Shafiq Ahmad Qarizada

10

$67,000.00

$0.00

01-Jun-10

31-Mar-11

vacant

Subtotal:

already existing in equip II already existing in equip II already existing in equip II already existing in equip II

EQUIP CORE TEAM IN THE CENTER

105

S1.1

EQUIP Coordinator

13 Financial Management Specialist 6 12

106

S1.2

6 Months & 28 Days 12 Finance Officer (Replacement) 3 Months

$0.00

$0.00

01-Jun-05

30-Jun-06

$0.00

$0.00

01-Jul-06

31-Dec-06

$0.00

$0.00

3-Jun-07

2-Jun-08

3-Jun-08

31-Dec-08

IC $0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

$14,400.00

$0.00

01-Jun-10

31-Mar-11

13

$0.00

$0.00

01-Jun-05

30-Jun-06

4

$0.00

$0.00

01-Jul-06

31-Oct-06

8

$0.00

$0.00

05-Nov-06

30-Jun-07

5 Months &7 Days

IC

N/A

Mohammad Salim Qayum

N/A

Ziaulhaq Safi

shifted from equip I N/A

N

$0.00

Procurement Officer

S1.3

Y

$0.00

10

107

IC

Mohammad Qaderi

N/A Mohammad Ashoor Sabori

shifted from equip I

vacant

Naveed Bakhshi Nadia Sahar Sidiqi N/A

N

$0.00

$0.00

24-Sep-07

28-Feb-08

Matin Rasuly

12

$0.00

$0.00

12 Months

$0.00

$0.00

01-Mar-08

28-Feb-09

Matin Rasuly

01-Jan-09

31-Dec-09

Abbas Khan

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) Senior Program Officer

3 Months

$0.00

10

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

$0.00

01-Jan-10

31-Mar-10

Abbas Khan

$0.00

01-May-10

31-Mar-11

Zubair

Progr ess of Proc urem ent as of

shifted from equip I

$18,480.00

108

S1.4

13

$0.00

$0.00

09-Jun-05

30-Jun-06

11

$0.00

$0.00

01-Jul-06

31-May-07

1

$0.00

$0.00

01-Jun-07

30-Jun-07

17

$0.00

$0.00

01-Aug-07

31-Dec-08

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

12 Social Mobilization Specialist 3 Months

IC

N

109

110

S1.5

S1.6

Finance Officer

$0.00

$18,876.00

$18,876.00

12

$0.00

$0.00

17

$0.00

$0.00

01-Aug-06

31-Jul-07

01-Aug-07

31-Dec-08

12

$0.00

$0.00

08-Oct-08

07-Oct-09

5 months & 22 days

$0.00

$0.00

08-Oct-09

31-Mar-10

12

$17,280.00

$17,280.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

01-Aug-06

30-Jun-07

12

$0.00

$0.00

01-Apr-07

31-Mar-08

9

$0.00

$0.00

01-Apr-08

31-Dec-08

7 Months &8 Days Social Mobilization Assistant 12 3 Months

IC

N

112

S1.7

S1.8

IT Officer

Mohammad Naeem

shifted from equip I Mohammad Kabir

Zabiullah Hashemi

shifted from equip I Mohammad Naeem Maryam Abassi

$0.00

$0.00

$0.00

N

24-May-08

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

15-Dec-05

30-Jun-06

01-Jul-06

23-Jan-07

Husnia Noorzai $0.00

shifted from equip I

$9,600.00

$9,600.00

6.5

$0.00

$0.00

6 Months & 23 Days

$0.00

$0.00

12

$0.00

$0.00

13-Nov-07

12-Nov-08

12

$0.00

$0.00

13-Nov-08

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$17,280.00

$17,280.00

01-Apr-10

31-Mar-11

$0.00

$0.00

17-Oct-06

29-Aug-07

Tamim Yousafzai

$0.00

$0.00

24-Sep-07

31-Dec-08

Mohammad Younus Atah

$0.00

$0.00

02-Mar-08

31-Dec-08

Abass Rahimi

$0.00

$0.00

16-Jun-09

21-Apr-10

10 Months & 12 Days 15 Months &7 Days 9 Months Procurement Assistant & 29 Days 10 motnth s& 23 days

N/A

N/A IC

12

111

Mohammad Afzal

N/A

12 Finance Assistant

Remarks

IC

IC

N

N

Ghulam Jailani

N/A

N/A Najibullah Akbari

shifted from equip I

Munir

N/A

SL No.

113

114

ID PKG. No. (New)

S1.9

S1.10

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s) 8Month s& Days

$8,400.00

11 12

115

S1.11

Program Officer

$0.00

$0.00

01-May-10

30-Apr-11

$0.00

$0.00

11-Sep-06

10-Sep-07

$0.00

$0.00

11-Sep-07

31-Dec-08

3

$0.00

$0.00

01-Jan-10

31-Mar-1-

12

$17,280.00

$17,280.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

01-Jul-06

30-Jun-07

IC

N

IC

N

$0.00

$0.00

01-Oct-07

31-Dec-08

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

12 17 Months & 17 Days 7 Months & 21 Days

3 Months

$0.00

$9,600.00

$9,600.00

$0.00

$0.00

15-Jul-06

14-Jul-07

$0.00

$0.00

15-Jul-07

31-Dec-08

Data Officer

$0.00

$0.00

$0.00

N

10-May-08

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

16-Feb-08

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

21-Dec-06

20-Dec-07

07-Feb-08

31-Dec-08

$17,280.00

$17,280.00

$0.00

$0.00

12

$0.00

$0.00

IC

N

$0.00

117

S1.13

10 Months & 21 Days Provincial Relation Officer 12 3 Months

$17,280.00

$17,280.00

$0.00

$0.00

$0.00

$0.00

S1.14

Monitoring Officer

Shifted from EQUIP 1 Ahmad Sameer

N/A Edi Farhad

Shifted from EQUIP 1

Javid Stanekzai

Abdul Rahim Wardak

Shifted from EQUIP 1

Obaidullah Hayran

N/A

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

21-Dec-06

20-Dec-07

Shifted from EQUIP 1 Sayed Mohammad Momand N/A

IC

N

Najibullah

12 3 Months & 29 Days

N/A

$0.00

12

12

vacant

$0.00

10 Months & 15 Days

3 Months

Shifted from EQUIP 1

N/A IC

12

S1.12

Remarks

Masooda Safi

12 3 Months

Name of Consultant

Progr ess of Proc urem ent as of

31-Dec-10

15

12

116

Contract Signing/ Date of Actual Date of Completion Contract Signing

22-Apr-10

12 Program Assistant

Planned/Actual Date

$8,400.00

15 Months & 20 Days Social Mobilization Assistant

Logistic Assistant

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$17,280.00

$17,280.00

$0.00

$0.00

IC

N

Shifted from EQUIP 1 Abdullah Jan Ahmedzai

N/A

Budget

SL No.

ID PKG. No. (New)

S1.15

S1.16

S1.17

S1.18

118

S1.19

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Monitoring Assistant

Monitoring Assistant

Monitoring Assistant

Monitoring Assistant

Actual

12

$0.00

$0.00

4 Months & 16 Days

$0.00

$0.00

12

$0.00

$0.00

8 Months &6 Days

$0.00

$0.00

12

$0.00

$0.00

8 Months & 13 Days

$0.00

$0.00

12

$0.00

$0.00

8 Months & 13 Days

$0.00

$0.00

12

$0.00

6 Months & 26 Days 16 12 Social Mobilization Junior Officer 3 Months

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

15-Aug-08

14-Aug-09

Vacant

15-Apr-07

31-Aug-07

Abdullah Jan Ahmedzai

15-Aug-08

14-Aug-09

Vacant

26-Dec-06

31-Aug-07

Murad Shaheed

15-Aug-08

14-Aug-09

Vacant

19-Dec-06

31-Aug-07

Abdul Rahim

15-Aug-08

14-Aug-09

Vacant

19-Dec-06

31-Aug-07

Sidiq ur Rahman

$0.00

15-Aug-08

14-Aug-09

Vacant

$0.00

$0.00

05-Jan-07

31-Jul-07

Mohammad Naeem

$0.00

$0.00

01-Sep-07

31-Dec-08

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

IC

IC

IC

IC

N

N

N

N

N

Progr ess of Proc urem ent as of

N/A

N/A

N/A

N/A

N/A

Abdul Rahim Wardak

Sayed Noorullah 12

$14,400.00

01-Apr-10

31-Mar-11

11-Dec-06

30-Sep-07

Nader Barak

Abdul Wakil Hanifi

Shifted from EQUIP 1

$14,400.00

S1.20

9 Months Deputy Equip Coordinator & 21 Days 15 Months &11 Days 9

119

S1.21

Regional Coordinator

3 Months

$0.00

$0.00

IC

N

$0.00

$0.00

20-Sep-07

31-Dec-08

$0.00

$0.00

01-Apr-09

31-Dec-09

01-Jan-10

31-Mar-10

$0.00 $0.00

IC

N

12

120

S1.22

Regional Coordinator

$39,600.00

$39,600.00

$0.00

$0.00

12

$0.00

3 Months

S1.23

Regional Coordinator

1-Oct-07

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

IC

N

Shifted from EQUIP 1 N/A

Nader Barak

$0.00

Shifted from EQUIP 1

01-Apr-10 $39,600.00

$39,600.00

15 Months

$0.00

$0.00

1-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

3 Months

N/A Kabir Ahmad Zai

31-Mar-11

12

121

N/A

01-Apr-10

15 Months

Remarks

$0.00

31-Mar-11

IC

N

N/A

Sayed Ali Sajad

$0.00

12

01-Apr-10 $39,600.00

$39,600.00

31-Mar-11

Shifted from EQUIP 1

Budget

SL No.

122

ID PKG. No. (New)

S1.24

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Regional Coordinator

15 Months & 11 Days

$0.00

12

$0.00

Actual

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

IC

$0.00

$0.00

1-Aug-07

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

3 Regional Social MobilizerMonths officer

$0.00

$17,280.00 $0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

N

01-Apr-09

31-Dec-09

vacant

N

15-Mar-07

14-Jun-07

Y

28-Jun-07

27-Jun-08

Mohammad Suliman Kakar

N/A

7-May-07

6-Oct-07

10-Jan-08

9-Aug-08

Sayed Naqibullah

N/A

1-May-07

30-Sep-07

1-Jan-08

30-Apr-08

Farhad Sediqi

N/A

1-Sep-08

31-Jul-09

3 Regional Social MobilizerMonths officer

$17,280.00

$17,280.00

$0.00

$0.00

12

$0.00

$0.00

Shifted from EQUIP 1

Samiullah Safi Haji Amanullah

N/A

N

$0.00 $0.00

$17,280.00

$17,280.00

$0.00

$0.00

S1.29

3 Sr. Social Mobilization Advisor 12

$0.00

$0.00

$0.00

$0.00

S1.30

5 Survey Coordinator-EMIS Project 7

$0.00

$0.00

$0.00

$0.00

S1.31

Finance Officer-EMIS Project

5

$0.00

$0.00

7

$0.00

$0.00

11

$0.00

$0.00

Natoinal Procurement Advisor 12

$48,780.00

$48,780.00

127

S1.33

Procurement Assistant

11

$7,700.00

$7,700.00

11

$0.00

$7,700.00

S1.34

Procurement Assistant

12

$8,400.00

$8,400.00

12

$0.00

$7,200.00

5

$0.00

$3,000.00

12

$9,600.00

$9,600.00

9

$0.00

$0.00

Shifted from EQUIP 1

Ehssanullah noori IC IC IC

N

IC

N

IC

N

IC

N

IC

N

IC

N

N/A

1-Oct-09

31-Jul-10

Abdul Wakil Hanifi

10-Oct-08

9-Oct-10

Omar

15-Nov-08

14-Nov-09

15-Nov-09

14-Nov-10

1-Oct-08 1-Nov-09

30-Sep-09 31-Mar-10

1-Apr-10

31-Mar-11

01-Apr-09

31-Dec-09

Transport Assistant

Liaisons Officer

N/A

N

$0.00

17

3 Regional Social MobilizerMonths officer

Qaheer Khan

$0.00

Regional Social Mobilizer officer 9

S 1.36

Shifted from EQUIP 1

$0.00

S1.32

130

Dr. Roshan Rasikh

$17,280.00

S1.28

S1.35

N/A

17

126

129

Shifted from EQUIP 1

N

$0.00

12

128

31-Mar-10

$0.00

IC S1.27

01-Jan-10

12

12

125

31-Dec-09

Abdul Qayun Ghani

$9,900.00

IC S1.26

01-Jan-09

$0.00

12

124

31-Dec-08

17

IC S1.25

Remarks

N/A 01-Sep-08

$9,900.00

Name of Consultant

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

N

3 Months

123

Planned/Actual Date

Following H.E. Instruction, Designation has been changed from Procureme nt Director to National Procureme nt Advisor Shifted N/A from EQUIP 1 N/A

Hamid

Jawid Stanekzai N/A

IC

N

vacant

Shifted from EQUIP 1

Shifted from EQUIP 1

Budget

SL No. 130

131

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) 11

$0.00

$0.00

01-May-10

31-Mar-11

Vacant

Tracking Database Officer 9

$0.00

$0.00

IC

N

01-Apr-09

31-Dec-09

vacant

8 Months

$0.00

$0.00

IC

N

21-May-08

31-12-08

12 Social Mobilisation Officermonths

$0.00

$0.00

IC

N

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$17,280.00

$17,280.00

1-Apr-10

31-Mar-11

S 1.38

S2.1

S2.3

7

$0.00

$0.00

01-Jun-06

31-Dec-06

$0.00

$0.00

03-May-09

02-Apr-10

12

$60,000.00

$60,000.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

4-Jul-06

03-Jul-07

$0.00

$0.00

4-Jul-07

31-Dec-08

Y

IC

Y

$0.00

$0.00

Y

11-Jun-06

10-Jun-07

$0.00

$0.00

N

11-Jun-07

30-Jun-07

$0.00

$0.00

1-Jul-07

31-Dec-08

12

$0.00

$0.00

1-Jan-09

31-Dec-09

12

$0.00

$0.00

16-Jun-09

15-Jun-10

12

$42,000.00

$42,000.00

01-Apr-10

31-Mar-11

4.5

$0.00

$0.00

7.5 $0.00 Human Resource Management Advisor 18.5 $0.00

$0.00

Finance Officer

N IC

Y

15-Jun-06

31-Oct-06

1-Nov-06

15-Jun-07

16-Jun-07

31-Dec-08

$0.00

1-Jan-09

31-Dec-09

12

$0.00

$0.00

15-Aug-09

14-Aug-10

12

$54,000.00

$54,000.00

01-Apr-10

31-Mar-11 31-May-07

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

7.5

$0.00

$0.00

4.5

$0.00

$0.00

19 Months & 17 Days

$0.00

$0.00

12

$0.00

Finance Manager - Payroll

Y

$0.00

12 Snr. Admin and Finance Advisor 1

$0.00

IC

12

18

S2.6

IC

12 20 Days 18 Engineering Advisor

3 Months

Progr ess of Proc urem ent as of

N/A

Shifted from EQUIP 1

IC

Y

1-Jun-06

N

1-Jun-07

30-Jun-07

Y

1-Jul-07

31-Dec-08

N

15-May-06

31-Dec-06

1-Jan-07

14-May-07

15-May-07

31-Dec-08

1-Jan-09

31-Dec-09

1-Jan-10

31-Mar-10

Jeaniene Spink

N/A

Shifted from EQUIP 1

Attaullah Wahidyar

Dr. Sedeq Weera

N/A

Eng. Yonus

N/A

already existing in equip II

zia Radyar

Miajan Mia

N/A

Shifted from EQUIP 1

Gulali Monmand

Nargis Nehan

N/A

N/A

IC Y

$0.00 $0.00

Qudratullah Andar

$0.00

Shifted from EQUIP 1

12 $39,600.00

$39,600.00

$0.00

$0.00

$0.00

$0.00

15

$0.00

12

$0.00

10

$0.00

$0.00

1-Jun-10

31-Mar-11

Logistics & Admin Assistant7

$0.00

$0.00

1-Jun-06

31-Dec-07

12

136

S.2.7

19 Months & 17 Finance & Admin Officer Days

Remarks

$454,756.00

11

17 Snr. Technical Advisor Months & 28 Days

S2.4

S2.5

Masooda Safi

Snr. Policy Advisor

RIMU Coordinator

135

Name of Consultant

S1.37

S2.2

134

Contract Signing/ Date of Actual Date of Completion Contract Signing

Liaisons Officer

$536,736.00 MOE POLICY DEVELOPMENT & CAPACITY BUILDING TEAM

133

Planned/Actual Date

S 1.36

Subtotal:

132

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

01-Apr-10

31-Mar-11

15-May-06

14-May-07

15-May-07

31-Dec-08

$0.00

1-Oct-07

31-Dec-08

$0.00

1-Jan-09

12-Sep-09

Matin Rasuly IC

N

N/A

Masooda Safi vacant

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

S2.8

$0.00

$0.00

1-Jan-07

31-May-07

$0.00

$0.00

1-Jun-07

31-Dec-08

1-Jan-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr-10

31-Mar-11

13-May-06

12-May-07

13-May-07

30-Jun-07

1-Jul-07

31-Dec-08

$0.00

$0.00

IC

N

$0.00

138

S2.10

IT Manager

S2.11

S2.12

139

S2.13

$17,280.00

$17,280.00

12

$0.00

$0.00

1 Month & 19 Days

$0.00

$0.00

IC

Y

IC

N

4-Jul-06

03-Jul-07

N

1-Jul-06

30-Jun-07

Y

31-Dec-08 05-Mar-10 31-Mar-11

18

$0.00

$0.00

12

$0.00

$0.00

12

$0.00

$0.00

18

$0.00

$0.00

12 $0.00 Executive Assistant & Advisor to Minister

$0.00

1-Jul-07 06-Mar-09 1-Apr-10

Logistics Assistant

12

$35,292.00

$35,292.00

12

$0.00

$0.00

18

$0.00

$0.00

5.5

$0.00

5 Finance Manager - Budget & Accounting Months $0.00 & 16 Days 16 Months Finance Manager - Budget & Accounting$0.00 (Replacement) & 27 Days 12 Months

$0.00

IC

1-Jul-06

30-Jun-07

1-Jul-07

31-Dec-08

$0.00

19-Jul-06

31-Dec-06

$0.00

1-Jan-07

16-Jun-07

IC

IC

N

140

S2.14

$0.00

$0.00

IC

N

5-Aug-07

31-Dec-08

5-Jun-09

4-Jun-10

141

S2.15

$24,000.00

1-Apr-10

31-Mar-11

12

$0.00

$0.00

29-Jul-06

28-Jul-07

$0.00

$0.00

29-Jul-07

31-Dec-08

12

$0.00

$0.00

1-Jan-09

31-Dec-09

12

$20,160.00

$20,160.00

1-Apr-10

31-Mar-11

$0.00

$0.00

01-Jan-10

31-Mar-10

5.5

$0.00

$0.00

19-Jul-06

31-Dec-06

6.5

$0.00

$0.00

1-Jan-07

18-Jul-07

12 IT Officer/ LAN Administrator 13 momths & 23 days

IC

N

$0.00

$0.00 IC

Salim Hayran Habib Ur Rahman Wayand

N/A N/A

Shifted from EQUIP 1

Shafi Haqmal

Rahimullah

N/A

Haleem Shah

Zaher Nazari

Jamaluddin Hamid

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1 Mohammad Bilal

19-Jul-07

31-Aug-07

N

$0.00

7-Nov-07

08-Nov-08

$0.00

$0.00

7-Nov-08

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-11

12

$17,280.00

$17,280.00

1-Apr-10

31-Mar-11

$0.00

$0.00

7-Nov-08

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

3

Samima Durrani N/A

Mohammad Bilal

$0.00

12

Shifted from EQUIP 1

Wadid ur Rahman

$24,000.00

1 Month & 13 Days

Fridoon Satary

N/A

12

3

Remarks

N/A

N

Finance Manager - Budget & Accounting

17 Months &3 Days IT Officer/ Database Administrator

Name of Consultant

Progr ess of Proc urem ent as of

$0.00

12

Admin Advisor

Contract Signing/ Date of Actual Date of Completion Contract Signing

5

3 Logistics & Admin Officer Months

S2.9

Planned/Actual Date

19 12 137

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Abdul Wali

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

S2.16

142

S2.17

Duratio Name of Contract (BriefnDescription) (Month Planed s) 6 Months & 21 Senior Procurement Officer Days 11 Months & 30 Days

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

$0.00

1-Jan-07 IC

21-Jul-07

N

N/A

$0.00

2-Jan-08

31-Dec-08

Ziaullah Hashmi

12

$0.00

$0.00

5-Aug-06

04-Aug-07

Zaher Nazari

12 Months & 22 Days

$0.00

$0.00

10-Dec-07

31-Dec-08

Arian Rahimi

$0.00

$0.00

1-Jun-08

31-Dec-08

Engr. Abdul Zohour

$0.00

$0.00

1-Jan-10

31-Mar-10

3 Months

IC

N

N/A

Zaher Nazari 12 Months

S2.18

143

S2.19

$0.00

10

$0.00

$0.00

1-Mar-08

31-Dec-08

8 Months & 10 Days

$0.00

$0.00

22-Oct-05

30-Jun-06

4

$0.00

$0.00

12

$0.00

$0.00

14 $0.00 Executive Assistant to Deputy Minister 12 $0.00 $0.00

IC

IC

N

N

1-Nov-07

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-06

19-Sep-07

28-Oct-06

27-Oct-07

Abdul Wakil Hanifi Shazia Saba

21-Feb-08

31-Dec-08

Sameer Haidari

1-Oct-06

30-Sep-07

1-Oct-07

31-Dec-08

$0.00

$0.00

12

$0.00

$0.00

$0.00

$0.00

12

Admin Manager

$0.00

$0.00

15

$0.00

$0.00

12 Finance Manager Budget 13

$0.00

$0.00

S2.23

$0.00

$0.00

12

$0.00

$0.00

Finance Adviser

$0.00

N/A

$0.00

Donor Coordination Manager 12

11

Ab. Mobeen Quraishee

31-Oct-06 31-Oct-07

$16,200.00

10 Donor Coordination Officer Months

N/A

1-Jul-06

$16,200.00

$0.00

IC

N

IC

N

IC

N

IC

N

IC

N

1-Dec-06

30-Nov-07

1-Dec-07

31-Dec-08

01-Jan-09

14-Apr-09

15-Apr-09

14-Mar-10

Shifted from EQUIP 1

Mohammad Amin Saraj Vacant

1-Nov-06

S2.22

S2.23

28-Feb-07

$0.00

&8 Days

144

1-Mar-06

12

12

S2.21

31-Mar-11

$23,520.00

3 Months

S2.20

1-Apr-10 $23,520.00

EMIS Specialist

Remarks

Arian Rahimi $0.00

$0.00

7 Senior. Procurement Officer

Progr ess of Proc urem ent as of

Shifted from EQUIP 1 N/A

N/A

Noorulhaq Farid

N/A

Ziaulhaq Safi

N/A

in lieu of S2.23 .Selec tion will be done Zia ul Haq Safi after appro val of Plan

The designation has been changed from Finance Director to Finance Adviser based on H.E. instructions, but the TOR remains the same.

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) 12 months & 15 Days

Contract Signing/ Date of Actual Date of Completion Contract Signing

$48,780.00

$48,780.00

15-Mar-10

31-Mar-11

Name of Consultant

Progr ess of Proc urem ent as of

$0.00

$0.00

18-Nov-07

17-Nov-08

S2.25

International Implementation 15Advisor 43 National Procurement Consultant Days 12

$0.00

$0.00

1-Oct-07

31-Dec-08

Greesh Kumar Sharma Vacant Najeeb Azizi

N/A

Faizullah

N/A

S2.27

GMU Assistant

$0.00

$0.00

$0.00

$0.00

11 Months & 21 Days

$0.00

$0.00

12

$0.00

3 Months

$0.00

IC

3-Aug-06

21-Sep-06

11-Jan-07

10-Jan-08

11-Jan-08

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

$9,600.00 S2.28

12 $0.00 Senior AdvisorVocational & Technical Education 10 $0.00 12

S2.29

$0.00

10 Months $0.00 &8 Days Planning, Monioring & Reporting Advisor$0.00 12

N/A N/A

N

Shifted from EQUIP 1

$9,600.00 $0.00 $0.00

IC

Y

$0.00

$0.00

IC

N

1-Mar-07

28-Feb-08

1-Mar-08

31-Dec-08

21-Feb-07

20-Feb-08

21-Feb-08

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$40,800.00

$40,800.00

01-Apr-10

31-Mar-11

Khwaja Omary

N/A

Abdul Baseer

N/A

Shifted from EQUIP 1

Lutfullah Safi

147

S2.30

Monitoring & Evaluations (Schools 15 Survey) $0.00

$0.00

IC

Y

1-Oct-07

31-Dec-08

Vacant

N/A

S2.31

12 International Procurement Advisor

$0.00

$0.00

IC

Y

3-Feb-08

2-Feb-09

N/A

$0.00

$0.00

3-Feb-09

2-Feb-10

G.V. Narayana Murthy

S2.32

International Database Developer 15

$0.00

$0.00

IC

Y

1-Oct-07

31-Dec-08

S2.33

National Database Developer 15

$0.00

$0.00

IC

N

1-Oct-07

31-Dec-08

S2.34

12 Snr. Financial Management Advisor 12

$0.00

$0.00

N

31-May-08

$0.00

IC

1-Jun-07

$0.00

1-Jun-08

31-May-09

S2.35

Procurement Manager

18 Months 10 Days

$0.00

$0.00

IC

Y

21-Jun-07

30-Jun-08

12

$0.00

$0.00

04-Jun-07

03-Jun-08

6 Months & 27 Days

$0.00

$0.00

04-Jun-08

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

S2.36

IC

N

12 $0.00 $0.00 Project Manager (Empolyee Registeration & ID Card IssuaICe Project 3 $0.00 $0.00 Months

12

148

S2.37

Team Leader

$50,400.00

$50,400.00

6

$0.00

$0.00

17-Apr-07

16-Oct-07

6

$0.00

$0.00

17-Oct-07

16-Apr-08

8 Months & 14 Days

$0.00

$0.00

17-Apr-08

31-Dec-08

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

IC

Remarks

Shifted from EQUIP 1

International Procurement Advisor 12

12 Months

146

Planned/Actual Date

S2.24

S2.26

145

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

N

N

Vacant Mohammad Shafi Afzali Assad Zamir

N/A N/A N/A

Edrees Omarzad N/A

N/A

Salim Hayran

Shifted from EQUIP 1

Wazir Razi

Ahmad Rateb

N/A

SL No.

ID PKG. No. (New)

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

149

S2.38

Team Leader

S2.39

Team Leader

01-Apr-10

S2.40

Team Leader

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

N

S2.41

Team Leader

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

S2.42

Team Leader

N/A

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

Mohammad Ameen

Shifted from EQUIP 1

N

N

Akhtar Mohammad N/A

Shifted from EQUIP 1

N/A

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

12 $8,400.00

$8,400.00

Abdul Ghafar

Shifted from EQUIP 1

N

12

153

Progr ess of Proc Name of Remarks Consultant urem ent as of Ahmad Rateb Shifted from EQUIP 1

IC

12

152

31-Mar-11

$8,400.00

12

151

Contract Signing/ Date of Actual Date of Completion Contract Signing

$8,400.00

12

150

Planned/Actual Date

Zia Ahmad Khwaja N/A

Shifted from EQUIP 1

N Ahmad Bashir

N/A

Shifted from EQUIP 1

Budget

SL No.

154

ID PKG. No. (New)

S2.43

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Team Leader

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

S2.44

Team Leader

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

S2.45

Team Leader

$8,400.00

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

N/A

Mohammad Haroon

Shifted from EQUIP 1

Tamim Satari

N/A

Shifted from EQUIP 1

Mohammad Mustafa N/A

N

Ebad ur Rahman 12

157

S2.46

Team Leader

S2.47

Team Leader

31-Mar-11

Shifted from EQUIP 1

$8,400.00

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09 Abdul Khabir MasoudN/A

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

N

12

158

01-Apr-10

6

IC

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

12

Remarks

N

6

IC

Name of Consultant

Progr ess of Proc urem ent as of

N

12

156

Contract Signing/ Date of Actual Date of Completion Contract Signing

6

12

155

Planned/Actual Date

Shifted from EQUIP 1

N

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

Abdul Sami

N/A

Shifted from EQUIP 1

Budget

SL No.

159

ID PKG. No. (New)

S2.48

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Team Leader

8 Months & 16 Days

$0.00

12

$0.00

3 Months

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

S2.49

Team Leader

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

S2.50

Team Leader

$8,400.00

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

15-Apr-08

31-Dec-08

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$0.00

$0.00

3 Months

$0.00

$0.00

IC

IC

N

S2.51

Team Leader

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

S2.52

Team Leader

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N/A

Shifted from EQUIP 1

$8,400.00

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N/A

N

6

12

Shifted from EQUIP 1

Ahmad Shaker

12

163

Hamed Hamdard N/A

Zabiullah Noori

N

12

162

Shifted from EQUIP 1

N

6 8 Months & 16 Days

Remarks

Noor Agha Ahadyar N/A

$20,120.00

6

12

161

Name of Consultant

Progr ess of Proc urem ent as of

N

12

160

Contract Signing/ Date of Actual Date of Completion Contract Signing

15-Apr-08 IC

$20,120.00

Planned/Actual Date

N

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

$0.00

$0.00

Abdul Rahman

Shifted from EQUIP 1

N/A

Haji Yousuf

Shifted from EQUIP 1

Budget

SL No.

164

ID PKG. No. (New)

S2.53

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Team Leader

8 Months & 16 Days

Actual

IC

S2.54

Team Leader

S2.55

Team Leader

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

S2.56

Team Leader

N

S2.57

Team Leader

S2.58

Team Leader

S2.59

Team Leader

01-Jun-10

31-Mar-11

01-May-07

31-Oct-07

N/A

Shifted from EQUIP 1

vacant

$8,400.00

$8,400.00

$0.00

$0.00

6

$0.00

$0.00

01-Nov-07

30-Apr-08

8

$0.00

$0.00

01-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

Qazi Mohammad Amin N/A

Shifted from EQUIP 1

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

6

$0.00

$0.00

15-Oct-07

14-Oct-07Mohammad Akbar Lagzay N/A 14-Apr-08 Vacant

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

15-Apr-07

14-Oct-07

IC

N

$8,400.00

$8,400.00

6

$0.00

$0.00 IC

N

6

$0.00

$0.00

15-Oct-07

14-Apr-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

15-Apr-07

14-Oct-07

15-Oct-07

14-Apr-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$8,400.00

$8,400.00

6

$0.00

$0.00

6

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Hamidullah Tokhi

N/A

Mohd Rateb Team Leade r

Shifted from EQUIP 1

Mehdi IC

IC

N

N

Ahmad zai

N/A

Ahmad Shaker

Shifted from EQUIP 1

Hazrat Shah

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

01-Jan-09

31-Dec-09

IC $0.00

Shifted from EQUIP 1

Baktash

12

170

Shifted from EQUIP 1

Abdul Sami

Ahmad Tawab

6

12

169

Remarks

Ajmal

12

168

Name of Consultant

Progr ess of Proc urem ent as of

Abdul Kabir MoqeemN/A

N

12

167

Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00

12

166

Planned/Actual Date

$0.00

12

165

IDA Proce Prior dure/ Revie Metho w d (Y/N)

N Nematullah

N/A

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) 3 Months

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

12 $8,400.00

171

S2.60

Team Leader

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing 01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Name of Consultant

Progr ess of Proc urem ent as of

Shifted from EQUIP 1

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

Din Mohammad

N/A

Farooq Faqor 12 $8,400.00

172

S2.61

Team Leader

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

12

173

S2.62

Team Leader

S2.63

Team Leader

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

S2.64

Team Leader

Abdul Basir

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1

Frogh Big

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

N

Sayd Zaher

N/A

IC

12

175

Ahmad Khalid Nabi N/A

Waheedullah

$8,400.00 6

12

174

Shifted from EQUIP 1

$8,400.00

6

Remarks

Shifted from EQUIP 1

Jawedurahman

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

N

N/A

IC Zabihullah Atal

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

176

S2.65

Team Leader

Team Leader

181

182

S2.67

S2.68

S2.69

Team Leader

Team Leader

Team Leader

31-Mar-11

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

Name of Consultant

Progr ess of Proc urem ent as of

Khyber

Shifted from EQUIP 1

$8,400.00

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09 Amir Mohammad Ulfat

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

N/A

N

$8,400.00

$8,400.00

6

$0.00

$0.00

15-Apr-07

14-Oct-07

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$8,400.00

$8,400.00

01-Apr-10

31-Mar-11

6

$0.00

$0.00

01-May-07

31-Oct-07

6

$0.00

$0.00

01-Nov-07

30-Apr-08

8

$0.00

$0.00

01-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$8,400.00

$8,400.00

01-Apr-10

31-Mar-11

6

$0.00

$0.00

6

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

12

$8,400.00

$8,400.00

6

$0.00

6

$0.00

8 Months & 16 Days

$0.00

$0.00

IC

Shifted from EQUIP 1

N/A

N

N IC

Haji Habibullah

Shifted from EQUIP 1 N/A

Mohammad Sarwar

Shifted from EQUIP 1

17-Apr-07

16-Oct-07

Nesar Ahmad

17-Oct-07

16-Apr-08

Vacant

01-Jan-09

31-Dec-09

Ajmal

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$0.00

15-Apr-07

14-Oct-07

$0.00

15-Oct-07

14-Apr-08

15-Apr-08

31-Dec-08

IC

IC

IC

Shifted from EQUIP 1

N/A

6

IC

Remarks

N

12

180

01-Apr-10 $8,400.00

$8,400.00

S2.66

Contract Signing/ Date of Actual Date of Completion Contract Signing

6

12

177

Planned/Actual Date

N

N

N

N/A

Shifted from EQUIP 1

Ahmad zamer Rasheedi

N/A Danish

SL No.

183

184

185

ID PKG. No. (New)

S2.70

S2.71

S2.72

S2.73

186

S2.74

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

S2.76

S2.77

187

S2.78

$0.00

01-Jan-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$8,400.00

$8,400.00

01-Apr-10

31-Mar-11

01-Jan-09

15-Aug-09

Shah Wali

13-Sep-09

31-Mar-10

Masooda Samadi

12

$0.00

$0.00

7.5

$0.00

$0.00

12

$17,280.00

$17,280.00

01-Apr-10

31-Mar-11

10

$0.00

$0.00

1-Mar-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

3-Jan-09

12

$0.00

$0.00

4-Jan-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$19,200.00

$19,200.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

14-Dec-07

13-Dec-08

12

$0.00

$0.00

15-Dec-07

14-Dec-08

8 Months & 19 Days

$0.00

$0.00

12-Mar-08

13-Dec-08

12

$0.00

$0.00

14-Dec-08

13-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Provincial Financial Officer

IC

IC

IC

IC

N

N

N

Progr ess of Proc urem ent as of

Hamidullah Rahil

N/A

from N/A

Hashmatullah Momand

Ahmad Shekib Ferazi Yalda Hashemi

Shifted from EQUIP 1 N/A

N/A

N Jamshid Sediqi

Shifted from EQUIP 1

$10,740.00

$0.00

$0.00

IC

N

15-Oct-07

31-Dec-08

Vacant

N/A

$0.00

$0.00

IC

N

15-Oct-07

31-Dec-08

Vacant

N/A

$0.00

$0.00

IC

N

15-Oct-07

31-Dec-08

Vacant

N/A

6

$0.00

$0.00

15-Oct-07

14-Apr-08

8 Months & 16 Days

$0.00

$0.00

15-Apr-08

31-Dec-08

Rahimullah

N/A

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$8,400.00

$8,400.00

01-Apr-10

31-Mar-11

N IC

Shifted from EQUIP 1

Abdul aziz

189

S2.79

Finance Assistant

9

$8,100.00

$0.00

$859,952.00

$851,852.00

01-Jul-10

12

$0.00

$0.00

01-Jun-06

1

$0.00

$0.00

01-Jun-07

30-Jun-07

18

$0.00

$0.00

01-Jul-07

31-Dec-08

01-Jan-09

31-Dec-09

Newly proposed and approved by WB

31-Mar-11 Newly Proposed

Subtotal: EQUIP ENGINEERING TEAM

12

Remarks

Shifted from EQUIP 1

$10,740.00 14 Months Provincial Financial Coordinator & 17 Days 14 Months Logistic Assistant & 17 Days 14 Months Deputy Head of GMU & 17 Days

Team Leader

Name of Consultant

$0.00

12

S2.75

Contract Signing/ Date of Actual Date of Completion Contract Signing

3 Months

Procurement Officer

Finance Assistant

Planned/Actual Date

12

Team Leader

Admin Assistant

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

$0.00

IC

N

31-May-07 N/A

Budget

SL No.

190

ID PKG. No. (New)

S3.1

Duratio Name of Contract (BriefnDescription) (Month Planed s) Architect

3 Months

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

12

191

S3.2

Architect

S3.3

Architect

S3.4

Civil/Design Engineer

S3.5

Civil/Design Engineer

S3.6

Civil/Design Engineer

01-Apr-10

31-Mar-11 31-May-07

$14,196.00 $0.00

01-Jun-06

1

$0.00

$0.00

01-Jun-07

30-Jun-07

18

$0.00

$0.00

01-Jul-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

$14,196.00

$14,196.00

12

$0.00

$0.00

14-Apr-07

13-Apr-08

8 Months & 17 Days

$0.00

$0.00

14-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

$11,892.00

$11,892.00

$0.00

$0.00

14-Oct-06

13-Oct-07

14 Months & 18 Days

$0.00

$0.00

14-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

$21,600.00

$21,600.00

12

$0.00

$0.00

08-Oct-06

07-Oct-07

14 Months & 24 Days

$0.00

$0.00

08-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

16-May-10

31-Mar-11

IC

$13,986.00

$13,986.00

12

$0.00

$0.00

14 Months & 24 Days

$0.00

$0.00

12

$0.00

3 Months

$0.00

N

07-Oct-07

08-Oct-07

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

N IC

$11,892.00

$11,892.00

Remarks

Ziaurahman

Shifted from EQUIP 1

Khalilullah

N/A

Shifted from EQUIP 1

Mohammad Zarif

N/A

Shifted from EQUIP 1

Miss Nakila Afzali

Fatema N/A Miss Huma Sadat

Shifted from EQUIP 1

Mir Mohammad Tamim

Daud N/A Mohammad Mustafa Mansoor Mansori

Shifted from EQUIP 1

Mohammad Rahim 08-Oct-06

12

Name of Consultant

Progr ess of Proc urem ent as of

N

12

10 Months and 15 days

195

31-Mar-10

$0.00

12

194

01-Jan-10

$14,196.00

12

193

Contract Signing/ Date of Actual Date of Completion Contract Signing

12

12

192

Planned/Actual Date

Haroon N/A Mohammad Shah

Mohammad Zarif

Shifted from EQUIP 1

Budget

SL No.

196

ID PKG. No. (New)

S3.7

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Civil/Design Engineer

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

S3.8

W/S Engineer

$0.00

$0.00

01-Jun-06

1

$0.00

$0.00

01-Jun-07

30-Jun-07

18

$0.00

$0.00

01-Jul-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

12

$0.00

$0.00

3 Months

$0.00

$0.00

N IC

$15,984.00

$15,984.00

$0.00

$0.00

14-Apr-07

13-Apr-08

8 Months & 17 Days

$0.00

$0.00

14-Apr-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

S3.9

Estimator

$15,984.00

$15,984.00

12

$0.00

$0.00

12

$0.00

$0.00

3 months

$0.00

$0.00

IC

N

N

12

199

200

S3.10

S3.11

Surveyor

IT Officer/ Admin

Miss Nakil Afzali

Miss Huma Sadat Nooria Haqnegar N/A Mohammad Shah

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Mohammad Shah

6-Jun-07

5-Jun-08

01-Jan-09

31-Dec-09

Noor Agha Mansoor Mansoori Vacant

$0.00

12

$0.00

$0.00

11

$14,652.00

$0.00

01-Jun-10

30-Apr-11

12

$0.00

$0.00

15-May-07

14-May-08

7 Months & 17 Days

$0.00

$0.00

15-May-08

31-Dec-08

3 months

$0.00

01-Jan-10

31-Mar-10

Ahmad Seayer

IC

N

01-Apr-10

31-Mar-11

$11,892.00

$11,892.00

S3.12

Monitoring engineers

9

$9,000.00

$0.00

IC

N

01-Jul-10

31-Mar-11

Newly Proposed

202

S3.13

Monitoring engineers

9

$9,000.00

$0.00

IC

N

01-Jul-10

31-Mar-11

Newly Proposed

203

S3.14

Monitoring engineers

9

$9,000.00 $182,274.00

$0.00

IC

N

01-Jul-10

31-Mar-11

Newly Proposed

$140,622.00

12

$0.00

$0.00

01-Aug-06

31-Jul-07

12

$0.00

$0.00

01-Aug-07

31-Dec-08

11

$0.00

$0.00

01-Feb-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

06-Nov-06

05-Nov-07

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

201

Subtotal:

Shifted from EQUIP 1

Shifted from EQUIP 1 N/A

N/A

N

$0.00

12

N/A

31-Dec-09

$9,000.00

Shifted from EQUIP 1

Abdul Zahour

01-Jan-09

$0.00

IC

Remarks

N/A

Mohammad Mustafa

13-Apr-08

$9,000.00

N

Tamim

14-Apr-07

12

IC

Name of Consultant

Progr ess of Proc urem ent as of

31-May-07

12

12

198

Contract Signing/ Date of Actual Date of Completion Contract Signing

12

12

197

Planned/Actual Date

Shifted from EQUIP 1

Maiwand

PROVIICIAL EQUIP TEAMS/ Kabul Province

204

S4.1

EQUIP Officer

IC

N

12 $12,000.00

$12,000.00

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

12

205

S4.2

Kabul Civil Engineer

IC

N

Sayed Jamil Mir N/A

Mir Abdul Qayum

Shifted from EQUIP 1

Eng. Khalilah Nasih

Mohammad

N/A

SL No.

ID PKG. No. (New)

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant Mohammad Sediq

12

S4.3

206

S4.4

Kabul Civil Engineer

Finance Officer

$11,208.00

$11,208.00

$0.00

$0.00

IC

N

06-Nov-06

05-Nov-07

12

$0.00

$0.00

IC

N

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

15 Months & 11 Days S4.5

Engineer

31-Mar-11

12

12

207

01-Apr-10

$10,740.00

$10,740.00

$0.00

$0.00 IC

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

5-Jun-07

4-Jun-08

4-Aug-07

3-Aug-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

12 $11,208.00

$11,208.00

12

$0.00

$0.00

12

$0.00

$0.00

12

$0.00

$0.00

3 months

$0.00

$0.00

N

208

S4.7

Social Mobilizer

IC

12 $11,208.00

$11,208.00

12

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Eng. Rashid Sharif

N/A

Jawed joya

N/A

N

5-Jun-07

4-Jun-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

Remarks

Shifted from EQUIP 1

Shifted from EQUIP 1

N/A

N

3 Months

Progr ess of Proc urem ent as of

Sayed Mujtaba

Shifted from EQUIP 1 Sayed Habibullah Pacha

N/A

Rahimullah Keshaf

Shifted from EQUIP 1

IC 209

S4.8

Social Mobilizer

12 $11,208.00 $67,572.00

$11,208.00 $67,572.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

Subtotal:

Moh. Ishaq

N/A

Shifted from EQUIP 1

Kabul City

210

S5.1

EQUIP Officer

3 Months

$0.00

IC N

$0.00

12

211

S5.2

S5.3

Finance Officer

Engineer, Kabul City

$12,960.00

$12,960.00

15 Months & 11 Days

$0.00

$0.00

3 Months

$0.00

$0.00

12

$0.00

$0.00

12

$9,600.00

$9,600.00

01-Apr-10

31-Mar-11

6

$0.00

$0.00

10-May-07

9-Nov-07

1 Month & 21 Days

$0.00

$0.00

10-Nov-07

31-Dec-07

IC

IC

IC

N

N

N

Masooma

N/A

Shifted from EQUIP 1 Vacant

N/A

Hezbullah Zahid N/A as assistant

Shifted from EQUIP 1

Mohammad Nabi

N/A

Budget

SL No.

ID PKG. No. (New)

S5.4

S5.5

S5.6

S5.7

S5.8

S5.9

S5.10

S5.11

S5.12

S5.13

S5.14

S5.15

S5.16

S5.17

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Actual

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

N

N

N

N

N

N

N

N

N

N

N

N

N

N

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing 10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

Name of Consultant

Progr ess of Proc urem ent as of

Mohammad Ajmal N/A

Mohammad Haroon N/A

Ajmal Farid

N/A

Gulam Nabi

N/A

Hamidullah-1

N/A

Ahmad Masoud KhaliqN/A

Sayed Abdul Saboor N/A

Mohammad Bashir N/A

Gul Ahmad

N/A

Abdul Hasib/ Shah Maqsood

N/A

Shams ur Rahman N/A

Ghulam Rabani

N/A

Mohammad Naeem N/A

Mohammad Masoom N/A

Remarks

Budget

SL No.

ID PKG. No. (New)

S5.18

S5.19

S5.20

S5.21

S5.22

S5.23

S5.24

S5.25

S5.26

S5.27

212

S5.28

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer, Kabul City

Engineer

Actual

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

1 Month & 21 Days

$0.00

$0.00

6

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

1 Month & 21 Days 14 Months & 25 Days

IDA Proce Prior dure/ Revie Metho w d (Y/N)

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

N

N

N

N

N

N

N

N

N

N

N

12

213

S5.29

Engineer

$11,208.00

$11,208.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

IC

N

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing 10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

10-May-07

9-Nov-07

10-Nov-07

31-Dec-07

7-Oct-07

31-Dec-08

1-Jan-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

1-Jan-09

31-Dec-09

Name of Consultant

Fazel Rahim

$0.00

1-Jan-10

31-Mar-10

Remarks

N/A

Mohammad Fahim N/A

Hamidullah-2

N/A

Alah Nawaz

N/A

Alah Nazar Naqibi N/A

Ghulam Mohayodin N/A

Mohammad Aslam N/A

Mohammad Kabir N/A

Sayed Akbar

N/A

Mansoor

N/A

Noor Ahmad

N/A

Shifted from EQUIP 1

N/A Ms. Nasima

$0.00

Progr ess of Proc urem ent as of

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

214

S5.30

Social Mobilizer

$11,208.00

$11,208.00

12

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

S5.31

Social Mobilizer

Contract Signing/ Date of Actual Date of Completion Contract Signing

1-Apr-10

31-Mar-11

5-Jun-07

4-Jun-08

1-Jan-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr-10

31-Mar-11

5-Jun-07

4-Jun-08

$11,208.00

$11,208.00

12

$0.00

$0.00

12

$0.00

$0.00

1-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

1-Jan-10

31-Mar-10

IC

N

Mir Abdul Qayum

Remarks

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1 Sayed Noorullah

N/A

Hasan Noorzai

12

1-Apr-10

31-Mar-11

01-Jun-06

31-May-07

01-Aug-07

31-Dec-08

$9,600.00 $65,784.00

$9,600.00 $65,784.00

12

$0.00

$0.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Jul-06

30-Jun-07

20-Sep-07

31-Dec-08

Subtotal:

Name of Consultant

Progr ess of Proc urem ent as of

Amina Naeemi

12

215

Planned/Actual Date

Shifted from EQUIP 1

Badakhshan Province

216

S6.1

EQUIP Officer

IC

N

12

217

218

219

S6.2

S6.3

S6.4

Engineer

Engineer

Finance Officer

$14,400.00

$14,400.00

12

$0.00

$0.00

15 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

11

$0.00

$0.00

01-May-10

30-Apr-11

12

$0.00

$0.00

14

$0.00

$0.00

12

$0.00

11

IC

N

01-Nov-06

31-Oct-07

01-Nov-07

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

$0.00

01-May-10

30-Apr-11

12

$0.00

$0.00

01-Aug-06

31-Jul-07

1

$0.00

$0.00

01-Aug-07

31-Aug-07

15 Months & 11 Days

$0.00

$0.00

20-Sep-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

IC

N

$12,000.00

$12,000.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

IC 220

S6.5

Social Mobilizer

$0.00

$0.00

N/A

Mohammad Asif

Shifted from EQUIP 1 Eng. Besmullah

Ezatullah

N/A

Shifted from EQUIP 1

Vacant

Eng. Mehrab

N/A

Shifted from EQUIP 1

Vacant

N/A

N

12

3 Months

Sayed Baqir

Aseel Khan Ahmadzai

Shifted from EQUIP 1

N Mohammad Zafar

N/A

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

221

S6.6

Social Mobilizer

$12,000.00

$12,000.00

17

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12 $12,000.00 $50,400.00

$12,000.00 $50,400.00

12

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Subtotal:

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

01-Apr-10

31-Mar-11

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Name of Consultant

Progr ess of Proc urem ent as of

Remarks

Shifted from EQUIP 1

N/A

Mohammad Wazir

Shifted from EQUIP 1

Khost Province

222

S7.1

EQUIP Officer

IC

N

S7.2

Engineer

S7.3

Engineer

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

11-Nov-06

10-Nov-07

11-Nov-07

31-Dec-08

$14,400.00

$14,400.00

12

$0.00

$0.00

13 Months & 20 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

Haji Amanullah

N/A

Shifted from EQUIP 1

N

12

224

31-Jul-07

01-Jan-09

Sangin Khan 12

223

01-Aug-06

Eng. Bad shah Gul

Shifted from EQUIP 1

$12,000.00

$12,000.00

12

$0.00

$0.00

16-Apr-07

15-Apr-08

8 Months & 15 Days

$0.00

$0.00

16-Apr-08

31-Dec-08

Eng. Ahsanullah

9

$0.00

$0.00

01-Apr-09

31-Dec-09

Hidaytullah

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

N/A

N N/A

Eng. Mojeebul Rahman 12 12

S7.4

Finance Officer

14 Months & 22 Days 8 Months &9 Days

S7.5

Social Mobilizer

$12,000.00

$0.00

$0.00

10-Oct-06

09-Oct-07

$0.00

$0.00

10-Oct-07

31-Dec-08

22-Apr-08

31-Dec-08

IC

$0.00

$0.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

3 Months

$0.00

S7.6

Social Mobilizer

$12,000.00

$12,000.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

3 Months

$0.00

$0.00

N/A

Abdul Salim

N

$0.00

IC

Hussian Shah

Shifted from EQUIP 1

N

12

226

31-Mar-11

$12,000.00

IC 225

01-Apr-10

Qaribullah

N/A

Shifted from EQUIP 1

N Abdullah Stanikzia

N/A

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

01-Apr-10

Name of Consultant

31-Mar-11

$44,000.00 $94,400.00

$44,000.00 $94,400.00

12

$0.00

$0.00

01-Aug-06

31-Jul-07

Azizullah

12

$0.00

$0.00

20-May-07

19-May-08

Moh. Shafiq

12

$0.00

$0.00

25-Jun-07

24-Jun-08

12

$0.00

$0.00

25-Jun-08

31-ma

01-May-10

30-Apr-11

Vacant Kabulai

Subtotal:

Progr ess of Proc urem ent as of

Remarks

Shifted from EQUIP 1

Paktika Province

227

S8.1

EQUIP Officer

IC

N

12

228

S8.2

Engineer

$14,400.00

$14,400.00

12

$0.00

$0.00

18-Nov-06

17-Nov-07

12

$0.00

$0.00

1-May-07

30-Apr-08

01-May-08

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

8

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12 $11,520.00

$11,520.00

12

$0.00

$0.00

07-Jan-07

06-Jan-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC 229

S8.3

Engineer

S8.4

Finance Officer

S8.5

Social Mobilizer

S8.6

Social Mobilizer

31-Mar-11

01-Nov-06

31-Oct-07

25-Jun-07

24-Jun-08

25-Jun-08

24-Jun-09

$12,000.00

$12,000.00

$0.00

$0.00

12

$0.00

$0.00

12

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,520.00

$11,520.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

$0.00

N

$0.00

$12,000.00

$12,000.00

17

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12 $12,000.00 $73,440.00

$12,000.00 $73,440.00

12

$0.00

$0.00

17 Months

$0.00

$0.00

Subtotal:

Shifted from EQUIP 1 Moh. Shafiq

Shifted from EQUIP 1 Sayed Abdullah N/A

Mohammad Jawid Noori

Shifted from EQUIP 1

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-06

31-Jul-07

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

Abdul Rahman

$0.00

$0.00

IC

N

N/A

Shifted from EQUIP 1

Mohd. Shoib

N/A

Shifted from EQUIP 1

Kandahar Province

12

N/A

N

12

232

01-Apr-10

12

3 Months

N/A

Baryalai

IC 231

Eng. Azim

Shifted from EQUIP 1

N

12

230

N/A

Sayed Ahmad

Abdul Rauf

Budget

SL No.

233

ID PKG. No. (New)

S9.1

Duratio Name of Contract (BriefnDescription) (Month Planed s) EQUIP Officer

3 Months

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

12

234

S9.2

Engineer

S9.3

Engineer

Finance Officer

S9.5

Social Mobilizer

Social Mobilizer

22-Nov-06

21-Nov-07

22-Nov-07

31-Dec-08

$0.00

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

28-Nov-06

27-Nov-07

28-Nov-07

31-Dec-08

IC

$11,520.00

$11,520.00

12

$0.00

$0.00

13 Months &3 Days

$0.00

$0.00

IC

N

N

9

$0.00

$0.00

01-Apr-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$0.00

$0.00

10

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

$11,520.00

$11,520.00

17

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

IC

N

01-Mar-07

28-Feb-08

01-Mar-08

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$12,000.00

$12,000.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

3 Months

$0.00

Noor Mohammad

Remarks

N/A

Shifted from EQUIP 1

Sayed Mohammad Dost

N/A

Shifted from EQUIP 1

Abdul Bari

N/A

Shifted from EQUIP 1

Toor Gul

N/A Khalid Zaher

Shifted from EQUIP 1

Masood

N/A

Shifted from EQUIP 1

N

$0.00

12 $12,000.00 $73,440.00

$12,000.00 $73,440.00

12

$0.00

$0.00

08-Nov-06

07-Nov-07

17 Months

$0.00

$0.00

01-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

03-Dec-06

02-Dec-07

Subtotal:

Name of Consultant

Progr ess of Proc urem ent as of

$12,000.00

12

IC S9.6

31-Mar-11

13 Months &9 Days

12

238

01-Apr-10 $14,400.00

12

237

31-Mar-10

$0.00

$12,000.00

S9.4

01-Jan-10

$14,400.00

12

236

Contract Signing/ Date of Actual Date of Completion Contract Signing

12

12

235

Planned/Actual Date

Najeebullah

N/A

Shifted from EQUIP 1

Helmand Province

239

S10.1

EQUIP Officer

IC

12 12

$14,400.00

$14,400.00

$0.00

$0.00

Ab. Qahir Qahir N/A

N

Zai-e- Haq

Shifted from EQUIP 1

Budget

SL No.

240

ID PKG. No. (New)

S10.2

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Snr. Civil Engineer

12 Months & 29 Days

$0.00

12

$0.00

3 Months

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

03-Dec-07

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

03-Dec-06

02-Dec-07

03-Dec-07

31-Dec-08

IC

Name of Consultant

Sayed Akbar

Progr ess of Proc urem ent as of N/A

N

Asadullah 12

241

242

S10.3

S10.4

Architect

Finance Officer

$12,000.00

$12,000.00

12

$0.00

$0.00

12 Months & 29 Days

$0.00

$0.00

9

$0.00

$0.00

01-Apr-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

Sheikh Ahmad

11

$0.00

$0.00

01-May-10

30-Apr-11

vacant

12

$0.00

$0.00

01-Mar-07

28-Feb-08

10

$0.00

$0.00

01-Mar-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

04-Aug-07

03-Aug-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

04-Aug-07

03-Aug-08

20-Oct-07

31-Dec-08

IC

IC

N

N

12

243

S10.5

Social Mobilizer

$12,000.00

$12,000.00

12

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12

244

S10.6

Social Mobilizer

$12,000.00

$12,000.00

12

$0.00

$0.00

14 Months & 12 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Feb-07

31-Jan-08

IC

Abdul Hadi

Shifted from EQUIP 1

N/A

N/A

Ezatullah Noorulhaq

Shifted from EQUIP 1

Nematullah

N/A

Shifted from EQUIP 1 Abdul Wakil

N Hamidullah

12 $12,000.00 $62,400.00

$12,000.00 $62,400.00

12

$0.00

$0.00

10

$0.00

$0.00

01-Mar-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

02-Jan-09

01-Jan-10

01-Jan-10

31-Mar-10

Subtotal:

Remarks

N/A

Shifted from EQUIP 1

Zabul Province

245

S11.1

EQUIP Officer

IC

N

12 12

246

S11.2

Engineer

3 Months

$12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

IC

N

Ghulam Mohammad

N/A Ulfat

Shifted from EQUIP 1

Mohammad Nasim N/A

12

01-Apr-10 $12,000.00

$12,000.00

31-Mar-11

Shifted from EQUIP 1

Budget

SL No.

247

ID PKG. No. (New)

S11.3

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Engineer

Actual

12

$0.00

$0.00

3 Months

$0.00

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N) IC

N

S11.4

Finance Officer

S11.5

Social Mobilizer

Social Mobilizer

01-Jan-10

31-Mar-10

$12,000.00

$0.00

$0.00

01-Mar-07

28-Feb-08

10

$0.00

$0.00

01-Mar-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

26-May-07

25-May-08

26-May-08

31-Dec-08

IC

N

$11,400.00

$11,400.00

12

$0.00

$0.00

7 Months &6 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

N

$12,000.00

$12,000.00

17

$0.00

$0.00

1-Aug-07

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

3 Months

Remarks

N/A

$0.00

$0.00

$12,000.00 $71,400.00

$12,000.00 $71,400.00

12

$0.00

$0.00

12

$0.00

$0.00

Shifted from EQUIP 1 N/A Moh. Hamayoon

Jamaludin

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1

31-Dec-08

N/A

N

12 Subtotal:

Name of Consultant

31-Mar-11

$12,000.00

IC S11.6

02-Jan-10

12

12

250

03-Jan-09

01-Apr-10

12

249

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

Zabihullah

12

248

Planned/Actual Date

Abdul Rahman

Shifted from EQUIP 1

Nooristan Province

251

252

S12.1

S12.2

EQUIP Officer

Engineer

10 Months &7 days

$14,400.00

$14,400.00

12

$0.00

$0.00

8

$0.00

$0.00

12

$0.00

3 Months

$0.00

IC

N

S12.3

Engineer

S12.4

Finance Officer

23-May-10

31-Mar-11

1-May-07

30-Apr-08 31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

N

Roshan Rasikh

N/A

Mohammad Muslim Khan Ibrahimi

Shifted from EQUIP 1

Ataullah

N/A Ahmad Farid

$12,000.00

$12,000.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

01-Apr-10

31-Mar-11

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

Shifted from EQUIP 1

Abdul Wahid

12

254

23-Apr-08 22-May-10

01-May-08

IC

12

253

24-Apr-07 23-May-09

01-Apr-10

31-Mar-11

14-Apr-07

13-Apr-08

14-Apr-08

31-Dec-08

$12,000.00

$12,000.00

12

$0.00

$0.00

8 Months & 17 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

N

N/A

Shifted from EQUIP 1

N/A Ahmad Farhad

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12 12

255

S12.5

Social Mobilizer

3 Months

$12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

IC

N

12

256

S12.6

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

01-Apr-10

31-Mat-11

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

1_Apr-10

31-Mar-11

1-Aug-07

31-Dec-08

23-May-09

22-May-10

23-May-10

22-May-11

$12,000.00

$0.00

$0.00

12

$0.00

$0.00

12

$12,000.00

$12,000.00

$74,400.00

$74,400.00

12

$0.00

$0.00

1-May-07

30-Apr-08

8

$0.00

$0.00

01-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 EQUIP Officer/ProviICial Education Advisor $0.00 Months

$0.00

01-Jan-10

31-Mar-10

IC

N

Social Mobilizer

Remarks

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1

Shafiullah

$12,000.00 17

Subtotal:

Name of Consultant

Progr ess of Proc urem ent as of

vacant

N/A

Shifted from EQUIP 1

Mohammad Akbar

Urzgan Province

257

S13.1

IC

N

Amanullah

N/A

M. Haroon Durani 12

258

S13.2

Finance Officer

$15,984.00

$15,984.00

12

$0.00

$0.00

7

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

IC

N

12

259

S13.3

Social Mobilizer

261

262

263

S13.4

S13.5

S13.6

S13.7

Social Mobilizer

Engineer

Engineer

Engineer

31-Mar-11

1-Jun-07

31-May-08

01-Jun-08

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$17,280.00

$17,280.00

12

$0.00

$0.00

1-May-07

30-Apr-08

8

$0.00

$0.00

01-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

1-Jul-07

30-Jun-08

1-Jul-08

30-Jun-09

IC

N

12

260

1_Apr-10

$12,612.00

$12,612.00

12

$0.00

$0.00

12

$0.00

$0.00

12

$0.00

$0.00

7-Jan_09

6-Jan-10

12

$12,612.00

$12,612.00

7-Jan-10

6-Jan-11

12

$0.00

$0.00

1-Jul-07

30-Jun-08

12

$0.00

$0.00

3

$0.00

12

IC

IC

N

N

1-Jul-08

30-Jun-09

$0.00

1-Jan-10

31-Mar-10

$12,612.00

$12,612.00

1-Apr-10

31-Mar-11

15 Months & 11 Days

$0.00

$0.00

20-Sep-07

31-Dec-08

12

$0.00

$0.00

23-Apr-07

22-Apr-08

8 Months &8 Days

$0.00

$0.00

23-Apr-08

31-Dec-08

12

$0.00

01-Jan-09

31-Dec-09

IC

IC $0.00

N

Shifted from EQUIP 1 N/A

Ahmed farid

Shifted from EQUIP 1

Ahmad Jan

N/A

Shifted from EQUIP 1

Karimullah

N/A

Engr. Amdullah

N/A

vacant

N/A

Eng. Naseer

N/A

N

Shifted from EQUIP 1

Shifted from EQUIP 1

Budget

SL No. 263

ID PKG. No. (New) S13.7

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Engineer

Name of Consultant Eng. Naseer

3 Months

$0.00

$0.00

12 $12,612.00 $83,712.00

$12,612.00 $83,712.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Subtotal:

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

vacant

vacant

Progr ess of Proc urem ent as of N/A

Remarks

Shifted from EQUIP 1

Daikundi Province

264

S14.1

EQUIP Officer

IC

N

12

265

S14.2

Finance Officer

$14,196.00

$14,196.00

$0.00

$0.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

9

$0.00

$0.00

01-Apr-09

31-Dec-09

15 Months & 11 Days

IC

IC 266

267

S14.3

S14.4

Social Mobilizer

Social Mobilizer

N

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,892.00

$11,892.00

01-Apr-10

31-Mar-11

6

$0.00

$0.00

12-May-07

11-Nov-07

7 Months & 20 Days

$0.00

$0.00

12-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

268

S14.5

Engineer

Shifted from EQUIP 1 N/A

N/A

01-Apr-10

31-Mar-11

Abdul Khalil Mansoori

Shifted from EQUIP 1

N

12 $11,892.00

$11,892.00

12

$0.00

$0.00

12-May-07

11-May-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

N/A

N

3 Months

IC

Mohd. Mohsen

Akbar Hussain

N/A

Shifted from EQUIP 1 Khalilullah Nasih

N/A

Sediqullah Safi

N

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

Shifted from EQUIP 1

Ajmal 12

269

S14.6

Engineer

$11,892.00

$11,892.00

15 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

Rafiullah

Shifted from EQUIP 1

N/A

Abdul Baseer

12

01-Apr-10 $11,892.00

$11,892.00

31-Mar-11

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) Subtotal:

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

$72,972.00

$72,972.00

12

$0.00

$0.00

20-May-07

19-May-08

7

$0.00

$0.00

1-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Name of Consultant

Progr ess of Proc urem ent as of

Remarks

Baghlan Province

270

S15.1

EQUIP Officer

IC

N

12

271

S15.2

Finance Officer

$13,380.00

$13,380.00

12

$0.00

$0.00

20-May-07

19-May-08

7 Months & 12 Days

$0.00

$0.00

20-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

272

S15.3

Social Mobilizer

$12,000.00

$12,000.00

12

$0.00

$0.00

20-May-07

19-May-08

7 Months & 12 Days

$0.00

$0.00

20-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

273

374

S15.4

S15.5

Social Mobilizer

01-Apr-10

31-Mar-11

$11,208.00

$11,208.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

21-May-07

20-May-08

21-May-08

31-Dec-08

Engineer

3 Months

$0.00

$11,208.00

$11,208.00

12

$0.00

$0.00

7 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

275

S15.6

Engineer

01-Apr-10

31-Mar-11

21-May-07

20-May-08

21-May-08

31-Dec-08

$11,208.00

$11,208.00

12

$0.00

$0.00

7 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

12 $11,208.00

$11,208.00

N/A

Sayed Abdullah

Shifted from EQUIP 1

masood

N/A

Mohammad Hussain

Shifted from EQUIP 1

Mohammad Afzal

N/A

Shifted from EQUIP 1

N

12

IC

Shifted from EQUIP 1

N

$0.00

IC

Abudl Rauf

N

12

IC

N/A

N

12

IC

Azizullah

Rashid Sharif

N/A

Shifted from EQUIP 1

N Ennayatullah

N/A

Shifted from EQUIP 1

Budget

SL No.

276

ID PKG. No. (New)

S15.7

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Engineer

Actual

12

$0.00

$0.00

7 Months & 11 Days

$0.00

$0.00

12

$0.00

3 Months

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Contract Signing/ Date of Actual Date of Completion Contract Signing 21-May-07

20-May-08

21-May-08

31-Dec-08

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

IC

$11,208.00 $81,420.00

$11,208.00 $81,420.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Name of Consultant

Progr ess of Proc urem ent as of

Remarks

N

12 Subtotal:

Planned/Actual Date

Abdullah

N/A

Shifted from EQUIP 1

Herat Province

277

S16.1

EQUIP Officer

IC

N

12

278

S16.2

Finance Officer

$13,380.00

$13,380.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12

S16.3

Social Mobilizer

$10,260.00

$10,260.00

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

3 Months

$0.00

$0.00

$11,208.00

$11,208.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

IC S16.4

Social Mobilizer

3 Months

$0.00

12

281

282

S16.5

S16.6

Engineer

Engineer

$11,208.00

$11,208.00

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

$11,208.00

$11,208.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

IC

Shifted from EQUIP 1

Mohammad Aref

N/A

Shifted from EQUIP 1

Muhammad Ehsan N/A

Shifted from EQUIP 1

N

$0.00

14 Months & 25 Days

N/A

N

12

280

31-Mar-11

17

IC 279

01-Apr-10

Abdul Qadeer

N

N

Abdul Jabar

N/A

Shifted from EQUIP 1 Khalilullah

N/A

Mohammad Haroon

Obaidullah

Ehsanullah

Shifted from EQUIP 1

N/A

SL No.

ID PKG. No. (New)

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant Ehsanullah

12

01-Apr-10

31-Mar-11

$11,208.00 $68,472.00

$11,208.00 $68,472.00

17 Months

$0.00

$0.00

01-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$13,380.00

$13,380.00

01-Apr-10

31-Mar-11

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

Subtotal:

Progr ess of Proc urem ent as of

Remarks

Shifted from EQUIP 1

Farah Province

283

S17.1

EQUIP Officer

IC

Ahmad Khalid

N N/A

Mohammad Homayon 12 12

284

S17.2

Finance Officer

3 Months

$15,984.00

$15,984.00

$0.00

$0.00

$0.00

$0.00

IC

N

Social Mobilizer

Social Mobilizer

S17.5

31-Mar-10

$11,520.00 $0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$12,000.00

$12,000.00

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$0.00

Shifted from EQUIP 1

N

17

3 Months

Mohammad Zaher N/A

Shifted from EQUIP 1

N

$0.00

Mohd. Barat

$12,000.00

$12,000.00

$0.00

$0.00

7-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

Zabiullah Saidy

31-Dec-09

Sayed Mohammad Taqi

IC

N

N/A

Sardar Mohammad

Shifted from EQUIP 1

Engineer

Hameed 12

12 288

S17.6

N/A

Shifted from EQUIP 1

14 Months & 25 Days

14 Months & 25 Days

Engineer

Shifted from EQUIP 1

N/A

31-Mar-11

$0.00

12

287

01-Jan-10

$11,520.00

IC S17.4

31-Dec-09

17

12

286

01-Jan-09

01-Apr-10

IC S17.3

31-Mar-11

Persarlai Kakar

12

285

01-Apr-10

Shifted from EQUIP 1

$12,000.00

$12,000.00

$0.00

$0.00

N/A

N/A $0.00

$0.00

IC

N

01-Jan-09

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

Engineer

3 Months

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

12 $12,000.00 $100,092.00

$12,000.00 $100,092.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Subtotal:

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

vacant

Haroun Aseem

Progr ess of Proc urem ent as of

Arash

N/A

Abdul Karim

N/A

Remarks

Shifted from EQUIP 1

Nimroz Province

289

S18.1

EQUIP Officer

IC

N

12

S18.2

FinaICe Officer

$14,400.00

$14,400.00

15 Months & 11 Days

$0.00

$0.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

IC 290

S18.3

Social Mobilizer

N

Mohibullah

S18.4

Social Mobilizer

$12,000.00

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Apr-09

31-Dec-09

01-Jan-10

31-Mar-10

3 Months

9

S18.5

Engineer

$0.00

$0.00

3 Months

$12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

IC

S18.6

Engineer

Shifted from EQUIP 1

N

Sultan Rohani

N/A

Shifted from EQUIP 1 N/A

Sayed Ismail

$12,000.00

$12,000.00

9

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12

01-Apr-10

31-Mar-11

01-Apr-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

21-Feb-08

31-Dec-08

01-Jan-09

31-Dec-09

01-Apr-10

31-Mar-11

$12,000.00 $62,400.00

$12,000.00 $62,400.00

10 Months &8 Days

$0.00

$0.00

12

$0.00

$0.00

12

$14,196.00

$14,196.00

12

$0.00

$0.00

27-Oct-07

26-Oct-08

12

$0.00

$0.00

27-Oct-08

26-Oct-09

Subtotal:

N/A

N

12

293

31-Mar-11

$12,000.00

12

292

01-Apr-10

17

IC

N/A

N

12

291

Shifted from EQUIP 1

Shifted from EQUIP 1 Abdul Hadi

N/A

Shir Mohammad

N/A

Mohamma Musa

N/A

Shifted from EQUIP 1

Badghis Province

294

S19.1

EQUIP Officer

IC

IC

N

N

Shifted from EQUIP 1

Abdul Momin N/A

Budget

SL No.

295

ID PKG. No. (New)

S19.2

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Finance Officer

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

S19.3

Social Mobilizer

S19.4

Social Mobilizer

$0.00

27-Oct-09

31-Mar-10

12

$11,520.00

$11,520.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Aug-07

31-Dec-08 Mohammad Din Fahim N/A

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

IC

3 Months

$0.00

$11,892.00

$11,892.00

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

IC

S19.5

Engineer

N

N

S19.6

Shifted from EQUIP 1

Shireen

N/A

Shifted from EQUIP 1

Sayad Fawad

$11,892.00

$11,892.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

Shifted from EQUIP 1 Mohammad Sadiq

N/A

Rahmatgull

12

299

Ahmad Shakir Ahmadzai

N

$0.00

16 Month & 10 Days

01-Apr-10

31-Mar-11

$11,892.00

$11,892.00

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

21-Feb-08

31-Dec-08

Shifted from EQUIP 1

N/A

Nasrullah IC

N

Shifted from EQUIP 1

Engineer

Habiul Rahman 12 $11,892.00 $84,492.00

$11,892.00 $84,492.00

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

11

$13,200.00

$0.00

01-May-10

31-Mar-11

15 Months & 11 Days

$0.00

$0.00

1-Dec-07

30-Nov-08

12

$0.00

1-Dec-08

30-Nov-09

Subtotal:

Shifted from EQUIP 1

Ghor Province

300

S20.1

EQUIP Officer

10 Months &8 Days

Remarks

N

12

298

Name of Consultant

$0.00

12

297

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

5 Months &3 days

IC 296

Planned/Actual Date

$0.00

IC

IC

N

N

N/A Faiz Mohammad Mayar

vacant

N/A

Budget

SL No.

301

ID PKG. No. (New)

S20.2

Duratio Name of Contract (BriefnDescription) (Month Planed s) FinaICe Officer

3 Months

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$11,520.00

$0.00

Social Mobilizer

303

S20.4

S20.5

Social Mobilizer

Engineer

31-Mar-10

01-Apr-10

31-Mar-11

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

10-Aug-07

31-Dec-08

3 Months

Name of Consultant

$0.00

N

$0.00

$11,892.00

$11,892.00

16 Months & 20 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

11

$0.00

$0.00

01-May-10

30-Apr-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

IC

N

N

Najeeb-e- Rahman N/A

Shifted from EQUIP 1

N/A Haji Najibullah

Shifted from EQUIP 1

vacant

Hamayon

N/A

Hakim Khan 12 12

304

S20.6

Engineer

3 Months

$11,892.00

$11,892.00

$0.00

$0.00

$0.00

$0.00

N IC

12

01-Apr-10

31-Mar-11

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$11,892.00 $60,396.00

$11,892.00 $47,196.00

17

$0.00

$0.00

01-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

5-Apr-09

4-Apr-10

Subtotal:

Remarks

Shifted from EQUIP 1

$11,520.00

$0.00

12

302

01-Jan-10

17

IC S20.3

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

Ezatullah Nabil $0.00

12

302

Planned/Actual Date

Shifted from EQUIP 1

Gul Ahmad

N/A

Sayed Ghaws

N/A

Shifted from EQUIP 1

Ghazni Province

IC 305

S21.1

EQUIP Officer

3 Months

$0.00

N

$0.00

12 $14,196.00

$14,196.00

$0.00

$0.00

$0.00

$0.00

12

$12,000.00

$12,000.00

01-Apr-10

31-Mar-11

14 Months & 10 Days

$0.00

$0.00

20-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

12 306

307

S21.2

S21.3

IC

N

Shifted from EQUIP 1 N/A Mohammad Rahim

Finance Officer

Social Mobilizer

Raaz Mohd. Fadai N/A

IC

N

Shifted from EQUIP 1

N/A Rafiullah

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

01-Apr-10 $11,892.00

$11,892.00

12

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

N

Name of Consultant

Progr ess of Proc urem ent as of

31-Mar-11

23-Oct-07

22-Oct-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Remarks

Shifted from EQUIP 1

IC 308

S21.4

Social Mobilizer

12

309

S21.5

Engineer

$11,892.00

$11,892.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12

310

S21.6

Engineer

$11,892.00

$11,892.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Shifted from EQUIP 1

Abdul Ghani

IC

N

7-Oct-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

Mubarak Shah

$11,892.00 $73,764.00

$11,892.00 $73,764.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

N/A

N/A

Shifted from EQUIP 1

Ghulam Rabani

12 Subtotal:

Aziz Ahmad

N/A

Shifted from EQUIP 1

Bamyan Province

311

S22.1

EQUIP Officer

IC

N

12

S22.2

312

S22.3

FinaICe Officer

Social Mobilizer

$14,196.00

$14,196.00

15 Months & 11 Days

$0.00

$0.00

17

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

IC

N

12

S22.4

Social Mobilizer

31-Dec-08 31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$11,892.00

$11,892.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Jan-09

31-Dec-09

IC 313

1-Aug-07 01-Jan-09

3 Months

$0.00

$0.00

12 12

$11,892.00

$11,892.00

$0.00

$0.00

Noor Mohammad N/A

Shifted from EQUIP 1 vacant

N/A

Abdul Qudous

N/A

Shifted from EQUIP 1

N Dr. Attiullah Alokozai N/A

Shifted from EQUIP 1 Ahmad Jawed

N/A

Budget

SL No.

314

ID PKG. No. (New)

S22.5

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Engineer

3 Months

$0.00

Actual

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N) IC

N

S22.6

Engineer

Contract Signing/ Date of Actual Date of Completion Contract Signing 01-Jan-10

Name of Consultant

Progr ess of Proc urem ent as of

$11,892.00

$11,892.00

15 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

12 $11,892.00 $61,764.00

$11,892.00 $61,764.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Subtotal:

Remarks

31-Mar-10 Mohammad Osman

12

315

Planned/Actual Date

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Mohammad Osman

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1

Ahmad Jawed

Logar Province

316

S23.1

EQUIP Officer

IC

N

FinaICe Officer

S23.3

Social Mobilizer

Social Mobilizer

S23.5

31-Mar-11

20-Sep-07

31-Dec-08

$0.00

$0.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

3 Months

$0.00

N

vacant

$0.00

$11,892.00

$11,892.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

3 Months

$0.00

$0.00

$11,892.00

$11,892.00

15 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

vacant

N/A

Habibullah Rasuly N/A

Shifted from EQUIP 1

Sayed Mustafa

N/A

Shifted from EQUIP 1 Abdul Matin

N

N/A Sayed Ahmad Reza

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

Nasrat Agha

Mohammad Haroon

Engineer IC

N

Esmatullah

15 Months & 11 Days

S23.6

Shifted from EQUIP 1

N

12

320

N/A

N

12

319

01-Apr-10 $14,196.00

IC S23.4

31-Mar-10

$14,196.00

12

318

01-Jan-10

15 Months & 11 Days

IC 317

20-Mar-10

Amanullah 12

S23.2

21-Mar-09

$11,892.00

$11,892.00

$0.00

$0.00 IC

N

N/A

N/A

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

Engineer

Akbar Stanikzai

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12 $11,892.00 $61,764.00

$11,892.00 $61,764.00

17 Months

$0.00

$0.00

9 Months & 22 Days

$0.00

$0.00

12

$0.00

$0.00

Subtotal:

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

10-Mar-08

31-Dec-08

01-Jan-09

31-Dec-09

Progr ess of Proc Name of Remarks Consultant urem ent as of Akbar Stanikzai Shifted from EQUIP 1

Maidan Wardak Province

321

S24.1

EQUIP Officer

3 Months

IC

N

Finance Officer

$0.00

$0.00

S24.3

Social Mobilizer

Social Mobilizer

S24.6

Engineer

S24.5

Engineer

31-Dec-08

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

IC

$0.00

N

$0.00

$11,892.00

$11,892.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

3 Months

$0.00

$11,892.00

$11,892.00

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N/A

Haji Assadullah

N/A

Shifted from EQUIP 1

N

Mohammad Wali AziziN/A

Shifted from EQUIP 1

N/A Hashmatullah

$11,892.00

$11,892.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

IC

N

Shifted from EQUIP 1

Samiullah

12 $11,892.00 $61,764.00

$11,892.00 $61,764.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

3 Months

$0.00

$0.00

Subtotal:

vacant

N

$0.00

14 Months & 25 Days

Shifted from EQUIP 1

N

12

325

20-Sep-07

$0.00

12

324

31-Mar-11

$0.00

IC S24.4

01-Apr-10 $14,196.00

12

323

31-Mar-10

$14,196.00

IC 322

01-Jan-10

15 Months & 11 Days

3 Months

N/A Zemarak Sardari

12

S24.2

Ezatullah Mudaqiq

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

N/A

Shifted from EQUIP 1

Nangarhar Province

326

S25.1

EQUIP Officer

IC

N

Ali Ahmad Barakzai N/A

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12 12

327

S25.2

FinaICe Officer

3 Months

$13,380.00

$13,380.00

$0.00

$0.00

$0.00

$0.00

IC

N

Social Mobilizer

Social Mobilizer

331

S25.5

S25.6

Engineer

Engineer

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

$10,260.00 $0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

3 Months

$0.00

$0.00

$11,208.00

$11,208.00

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

$11,208.00

$11,208.00

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

01-May-10

30-Apr-11

7-Oct-07

31-Dec-08

IC

N

11

$9,680.00

$0.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3 Months

$0.00

$0.00

01-Jan-10

31-Mar-10

$9,680.00 $65,416.00

$0.00

01-May-10

30-Apr-11

$46,056.00

$0.00

$0.00

01-Aug-07

31-Dec-08

11

IC

Remarks

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1

Mohammad Hassan N/A

Shifted from EQUIP 1

N

14 Months & 25 Days

Subtotal:

Name of Consultant

Progr ess of Proc urem ent as of

N

12

330

01-Jan-09

$0.00

IC S25.4

31-Mar-11

$10,260.00

12

329

01-Apr-10

17

IC S25.3

Contract Signing/ Date of Actual Date of Completion Contract Signing

Enayatullah

12

328

Planned/Actual Date

N

Zundai Hafizi

N/A

Shifted from EQUIP 1

N/A Abdul Haseeb

vacant

N/A Fazil Hadi

vacant

Laghman Province 17 Months 332

S26.1

EQUIP Officer

IC

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

12

S26.2

333

S26.3

FinaICe Officer

Social Mobilizer

$13,380.00

$13,380.00

15 Months & 11 Days

$0.00

$0.00

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

334

S26.4

Social Mobilizer

$11,208.00

$11,208.00

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

Shifted from EQUIP 1

IC

N

20-Sep-07

31-Dec-08

1-Aug-07

31-Dec-08

IC

N

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10 Mohammad Nasir Alukozai N/A

01-Apr-10

31-Mar-11

12 17

Salih Mohammad N/A

IC

N

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

vacant

N/A

Rahimullah Alimi N/A

Shifted from EQUIP 1

Budget

SL No. 334

ID PKG. No. (New) S26.4

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$11,208.00

S26.5

$0.00

$0.00

3

$0.00

$0.00

31-Mar-11

IC

N

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

Engineer

14 Months & 25 Days S26.6

01-Apr-10

Engineer

$11,208.00

$11,208.00

$0.00

$0.00 IC

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

12 $11,208.00 $58,212.00

$11,208.00 $58,212.00

17 Months

$0.00

$0.00

12

$0.00

$0.00

Mohammad Ashraf

N/A

Ghazi

N/A

Remarks

Shifted from EQUIP 1

Shifted from EQUIP 1

N

12

Subtotal:

Progr ess of Proc Name of Consultant urem ent as of Rahimullah Alimi N/A

$11,208.00

12

12

336

Contract Signing/ Date of Actual Date of Completion Contract Signing

Social Mobilizer 12

335

Planned/Actual Date

Shifted from EQUIP 1

Kunar Province

337

S27.1

S27.2

338

339

340

341

S27.3

S27.4

S27.5

S27.6

EQUIP Officer

FinaICe Officer

Social Mobilizer

Social Mobilizer

Engineer

Engineer

12

$14,400.00

$14,400.00

15 Months & 11 Days

$0.00

$0.00

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

IC

N

01-Apr-10

31-Mar-11

IC

N

20-Sep-07

31-Dec-08

1-Aug-07

31-Dec-08

IC

N

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$12,000.00

$12,000.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12 14 Months & 25 Days

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$12,000.00

$12,000.00

01-Apr-10

31-Mar-11

$0.00

$0.00

7-Oct-07

31-Dec-08

IC

IC

N

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$12,000.00

$12,000.00

01-Apr-10

31-Mar-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

Shifted from EQUIP 1

vacant

N/A

Haji Yaar Mullah khanN/A

Zewar shah

N/A

Mohammad Nabi

N/A

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$12,000.00

$12,000.00

01-Apr-10

31-Mar-11

342

S28.1

EQUIP Officer

Shifted from EQUIP 1

Shifted from EQUIP 1 Gul Agha

$62,400.00

$62,400.00

16

$0.00

$0.00

01-Sep-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

N/A Mohammad Hashim

Parwan Province IC

Shifted from EQUIP 1

N

12

Subtotal:

N/A Amanullah

N

12

IC

Ghulmullah

N

Sayed Habibullah Pacha N/A

Shifted from EQUIP 1

Budget

SL No. 342

ID PKG. No. (New) S28.1

S28.2

343

344

345

346

S28.3

S28.4

S28.5

S28.6

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

EQUIP Officer

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

Engineer

12

$13,380.00

$13,380.00

15 Months & 11 Days

$0.00

$0.00

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

Progr ess of Proc Name of Contract Signing/ Date of Consultant urem Actual Date of Completion ent as Contract Signing of Sayed Habibullah Pacha N/A Planned/Actual Date

01-Apr-10

31-Mar-11

IC

N

20-Sep-07

31-Dec-08

1-Aug-07

31-Dec-08

IC

N

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12 14 Months & 25 Days

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$0.00

$0.00

7-Oct-07

31-Dec-08

IC

IC

N

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

N/A

Mohammad Zareef N/A

Abdul Hadi

N/A

Mohammad Younis

N/A

Shifted from EQUIP 1

Shifted from EQUIP 1

Shifted from EQUIP 1

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$58,212.00

$58,212.00

$0.00

$0.00

13-Aug-07

31-Dec-08

Subtotal:

Shifted from EQUIP 1

N

12

IC

vacant

Remarks

Mohammad Osman

N/A

Shifted from EQUIP 1

Kapisa Province 16 Months & 17 Days 347

S29.1

EQUIP Officer

IC

Zabiullah Saidy

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$13,380.00

$13,380.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

N/A

Shifted from EQUIP 1

Abdul Qahir

348

S29.2

Finance Officer

IC

N

349

350

S29.3

S29.4

Social Mobilizer

Social Mobilizer

$11,520.00

$11,520.00

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

23-Nov-08

24-Nov-08

31-Dec-09

01-Jan-10

12 17

24-Nov-07

31-Mar-10

01-Apr-10

31-Mar-11

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

IC

IC

N

N

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

N/A Najib ur Rahman

Ahmad Ali

Amina Naeemi

Shifted from EQUIP 1

N/A

N/A

Shifted from EQUIP 1

Budget

SL No. 350

351

352

ID PKG. No. (New) S29.4

S29.5

S29.6

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Social Mobilizer

Engineer

Engineer

Name of Consultant

Progr ess of Proc urem ent as of

Abdul Qayoum 12

$11,208.00

$11,208.00

14 Months & 25 Days

$0.00

$0.00 IC

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

Abdul Rahman

N/A

Shifted from EQUIP 1

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$69,732.00

$69,732.00

$0.00

$0.00

01-Aug-07

31-Dec-08

Subtotal:

Shifted from EQUIP 1

N

12

IC

Remarks

Abudl Zaher

N/A

Shifted from EQUIP 1

Panjshir Province 17 Months 353

354

S30.1

S30.2

EQUIP Officer

FinaICe Officer

IC

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$13,380.00

$13,380.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

IC

N

355

356

357

358

S30.3

S30.4

S30.5

S30.6

Social Mobilizer

Social Mobilizer

Engineer

Engineer

$11,520.00

$11,520.00

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

28-Nov-08

01-Jan-09

31-Dec-09

01-Jan-10

12 17

29-Nov-07

01-Apr-10

31-Mar-11

1-Aug-07

31-Dec-08 31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12 14 Months & 25 Days

N

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$0.00

$0.00

7-Oct-07

31-Dec-08

IC

IC

N

Shifted from EQUIP 1 Mohammad Nasir

N/A

Shifted from EQUIP 1

salim

Sayed Qasim

N/A

Mohd. Esa

N/A

Shirpoor

N/A

Shifted from EQUIP 1

Shifted from EQUIP 1

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

N/A

31-Mar-10

01-Jan-09

IC

Zekaria

N

Shifted from EQUIP 1

N/A Sebghatullah

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) 12 Subtotal:

Actual

$11,208.00

$11,208.00

$69,732.00

$69,732.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

01-Apr-10

Name of Consultant

Progr ess of Proc urem ent as of

31-Mar-11

Remarks

Shifted from EQUIP 1

Samangan Province 359

S31.1

S31.2

360

361

362

363

S31.3

S31.4

S31.5

S31.6

EQUIP Officer

12

$14,400.00

$0.00

IC

N

FinaICe Officer

15 Months & 11 Days

$0.00

$0.00

IC

N

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

Social Mobilizer

Social Mobilizer

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

$11,208.00

IC

N

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

3

$0.00

$0.00

12

$11,208.00

$11,208.00

14 Months & 25 Days

$0.00

$0.00

IC

IC

N

N

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

7-Oct-07

31-Dec-08

Engineer

Engineer

IC

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

11

$9,680.00

$9,680.00

01-May-10

30-Apr-11

$57,704.00

$43,304.00

$0.00

$0.00

01-Aug-07

31-Dec-08

Subtotal:

vacant

N/A

vacant

N/A

Abdullah

N/A

Haji Shahbaz

N/A

Mohammad Hussain

N/A

Farid Ahmad

N/A

Shifted from EQUIP 1

Shifted from EQUIP 1

Shifted from EQUIP 1

vacant

Kunduz Province 17 Months 364

365

366

367

368

S32.1

S32.2

S32.3

S32.4

S32.5

EQUIP Officer

IC

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$13,380.00

$13,380.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$9,600.00

$9,600.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

IC

N

Abdul Azim

N/A

Shifted from EQUIP 1 Hekmatullah

N/A

Shifted from EQUIP 1

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

IC

N

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

12

$0.00

01-Jan-09

31-Dec-09

IC

IC $0.00

N

Farhad Haidari

Lal Gul

N/A

Horia

N/A

Mirwais

N/A

N

Shifted from EQUIP 1

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

Engineer

369

S32.6

Engineer

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

Progr ess of Proc urem ent as of

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$0.00

$0.00

7-Oct-07

31-Dec-08

$0.00

$0.00

27-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

Sardar Mohammad

10

$0.00

$0.00

01-Jun-10

30-Apr-11

vacant

$56,604.00

$56,604.00

12

$0.00

$0.00

20-Sep-07

19-Sep-08

Mohammad Ayoub

7 Months & 15 Days

$0.00

$0.00

17-May-08

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$13,380.00

$13,380.00

01-Apr-10

31-Mar-11

15 Months & 11 Days

$0.00

$0.00

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

14 Months & 25 Days 7 Months &5 Days

Subtotal:

IC

Remarks

Shifted from EQUIP 1 Basir Mohammad

N

N/A Bahawoodin

shifted from equip1

Balkh Province

370

S33.1

S33.2

371

372

373

S33.3

S33.4

S33.5

EQUIP Officer

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

IC

IC

N

20-Sep-07

31-Dec-08

1-Aug-07

31-Dec-08

IC

N

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

9

$0.00

$0.00

01-Apr-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

IC

IC

12

S33.6

Engineer

$11,208.00

$11,208.00

12

$0.00

3

$0.00

12

$11,208.00

N

31-Mar-11

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$11,208.00

01-Apr-10

31-Mar-11

20-Sep-07

31-Dec-08

16-July-o7

15-Jul-08

$0.00

$0.00 $58,212.00

15 Months & 11 Days

$0.00

$0.00

12

$0.00

$0.00

Faryab Province

375

S34.1

EQUIP Officer

N/A

Shifted from EQUIP 1 vacant

N/A

Abdul Hadi Atefi

N/A

Shifted from EQUIP 1

N/A Hamidullah

Vacant

Shifted from EQUIP 1 N/A

Shifted from EQUIP 1

N 01-Apr-10

$58,212.00

Subtotal:

N

Mohammad Rasoul

Nasrullah IC

374

N

IC

N

IC

N

Abdul Latif

Abdul Bashir

N/A

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

S34.2

376

377

378

379

S34.3

S34.4

S34.5

S34.6

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

Engineer

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N) IC

N

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

12

$0.00

$0.00

01-Jan-09

31-Dec-09

11

$13,200.00

$0.00

1-May-10

31-Mar-11

vacant

12

$0.00

$0.00

16-July-o7

15-Jul-08

vacant

12

$0.00

$0.00

01-Jan-09

31-Dec-09

Hedaytullah

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$0.00

$0.00

12

$11,892.00

$11,892.00

IC

IC

N

N

16-July-o7

15-Jul-08

01-Apr-10

31-Mar-11 31-Dec-09

12

$0.00

$0.00

01-Jan-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$12,000.00

$12,000.00

01-Apr-10

31-Mar-11

3

$0.00

$0.00

01-Jan-10

31-Mar-10

9

$0.00

$0.00

01-Apr-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,892.00

$11,892.00

01-Apr-10

31-Mar-11

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,892.00

$11,892.00

01-Apr-10

31-Mar-11

$60,876.00

$47,676.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

15 Months & 11 Days

$0.00

$0.00

20-Sep-07

31-Dec-08

12

$13,380.00

$13,380.00

01-Apr-10

31-Mar-11

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

Subtotal:

IC

IC

N

N

IC

Progr ess of Proc urem ent as of

Remarks

N/A N/A

abdul hafiz

Sayed Habib Saeed N/A

Shifted from EQUIP 1 Esmatullah/ Mir Asdullah

N/A

Abdul Karim

Bashir Ahmad

N/A

Shifted from EQUIP 1

Shifted from EQUIP 1

Syed Ahamad raza

Juzjan Province

380

381

S35.1

S35.2

EQUIP Officer

Haji Omar

N/A

Shifted from EQUIP 1 N/A

Shifted from EQUIP 1

Ghulam Ishan

Finance Officer 9600

9600

01-Apr-10

31-Mar-11

12

$0.00

$0.00

12

$0.00

$0.00

4-Aug-07

03-Aug-08

4-Aug-08

17

$0.00

$0.00

03-Aug-09

1-Aug-07

31-Dec-08

12

$0.00

3

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

12

$0.00

3

$0.00

$0.00

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

14 Months & 25 Days

31-Mar-10

$0.00

$0.00

7-Oct-07

31-Dec-08

01-Apr-10

31-Mar-11

12

382

S35.3

Social Mobilizer

IC

IC

383

S35.4

Social Mobilizer

IC 12

N

N/A Abdul Malik

Shifted from EQUIP 1

N

Muhammad Barat N/A

N

$11,208.00

$11,208.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

Shifted from EQUIP 1 Esmatullah

N/A

Budget

SL No.

384

385

ID PKG. No. (New)

S35.5

S35.6

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Engineer

Engineer

Actual

14 Months & 25 Days

$0.00

$0.00

9 months

$0.00

3

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

7-Oct-07

31-Dec-08

$0.00

1-Apr-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$67,812.00

$67,812.00

12

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

$0.00

12

$0.00

$0.00

11

$10,000.00

$0.00

3

$0.00

$0.00

12

$0.00

$0.00

12

$0.00

12

Subtotal:

IC

Name of Consultant

Progr ess of Proc urem ent as of

Remarks

N

IC

Khwaja Asadullah

Shifted from EQUIP 1 Sayedullah

N/A

Shifted from EQUIP 1

Bashir Ahmad

Saripul Province

386

387

388

389

390

391

S36.1

S36.2

S36.3

S36.4

S36.5

S36.6

EQUIP Officer

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

Engineer

31-Aug-07

30-Aug-08

31-Aug-08

30-Aug-09

$0.00

01-Jan-10

31-Mar-10

$0.00

5-Dec-07

4-Dec-08

01-Jan-09

31-Dec-09

01-Jun-10

31-Mar-11

01-Jan-10

31-Mar-10

4-Aug-07

03-Aug-08

$0.00

4-Aug-08

03-Aug-09

$11,208.00

$11,208.00

01-Apr-10

01-Apr-10

12

$0.00

$0.00

4-Aug-07

03-Aug-08

12

$0.00

$0.00

4-Aug-08

03-Aug-09

12

$0.00

$0.00

4-Aug-09

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

12

$0.00

$0.00

4-Aug-09

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

01-Jan-10

31-Mar-10

7-Oct-07

31-Dec-08

IC

IC

IC

IC

IC

N

N

N

N

3

$0.00

$0.00

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$66,040.00

$56,040.00

Subtotal:

N/A

vacant N/A Aziz

Shifted from EQUIP 1

Mohd. Saber

N/A

Samar Gul

N/A

Shifted from EQUIP 1

N

14 Months & 25 Days

IC

Mohammad Raqib

N

Shifted from EQUIP 1

Abdul Baheer

N/A

Shifted from EQUIP 1 Sayed Nasir

N/A

Shifted from EQUIP 1

Takhar Province

392

S37.1

EQUIP Officer

3

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

IC

N

01-Jan-10

31-Mar-10

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Dr. Shekib

Zabiullah 12 $13,380.00

$13,380.00

N/A

N/A

Shifted from EQUIP 1

Budget

SL No.

393

394

395

396

397

ID PKG. No. (New)

S37.2

S37.3

S37.4

S37.5

S37.6

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

Actual

17

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

12

$10,260.00

3 17

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing 1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$10,260.00

01-Apr-10

31-Mar-11

$0.00

$0.00

01-Jan-10

31-Mar-10

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

01-Jan-10

31-Mar-10

7-Oct-07

31-Dec-08

IC

IC

N

N

3

$0.00

$0.00

14 Months & 25 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3

$0.00

$0.00

01-Jan-10

31-Mar-10

14 Months & 25 Days

$0.00

$0.00

7-Oct-07

31-Dec-08

IC

IC

N

Ahmad Salim

N/A

Amir Mohd

N/A

Remarks

Shifted from EQUIP 1

Shifted from EQUIP 1 Rahila

Haroon Asim

N/A

Shifted from EQUIP 1

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

3

$0.00

$0.00

01-Jan-10

31-Mar-10

13

$0.00

$0.00

01-Jan-09

31-Dec-09

12

$11,208.00

$11,208.00

01-Apr-10

31-Mar-11

$68,472.00

$68,472.00

$0.00

$0.00

07-Nov-08

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

Engineer

Subtotal:

Name of Consultant

Progr ess of Proc urem ent as of

Sayed Abid

N/A

Shifted from EQUIP 1 Khyberullah

Zabiullah

N/A

vacant

N/A

Shifted from EQUIP 1

ICT MANAGEMENT UNIT TEAM S38.1

ICT Officer for Kart-e-Char 12 office 3

398

399

400

S38.2

S38.3

S38.4

S38.5

N

12 $7,200.00 $7,200.00 Technician for Simultaneous & Video conferencing equipment 12

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

IC

N

12 $7,200.00 $7,200.00 Technician for Simultaneous & Video conferencing equipment

Web Developing Officer

12

$0.00

$0.00

12

$0.00

$0.00

3

$0.00

$0.00

Programming Officer

IC

N

12 15

401

IC

$23,556.00

$23,556.00 IC

06-Nov-08

07-Nov-08

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Feb-07

31-Jan-08

01-Jan-09

31-Dec-09

01-Jan-10

31-Mar-10

01-Apr-10

31-Mar-11

01-Oct-07

31-Dec-08

26-Apr-07

27-Apr-08

28-Apr-08

31-Dec-08

$0.00

$0.00

$0.00

$0.00

12

$0.00

$0.00

8 Months &3 Days

$0.00

$0.00

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

N

07-Nov-07

N

Shifted from Ahmad Jaweed N/A EQUIP 1

N/A Ahmad Zia

Shifted from EQUIP 1

s

Shamshad Ayoubi

Vacant

Ahmad Shah

Shifted from N/A EQUIP 1

SL No.

ID PKG. No. (New)

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant Ahmad Shah Wardak

12 402

403

S38.6

S38.7

405

406

S38.9

01-Mar-07

28-Feb-08

15-Apr-08

31-Dec-08

$21,216.00

$21,216.00

$0.00

$0.00

8 Months & 16 Days

$0.00

$0.00

12

$0.00

$0.00

30-May-09

29-May-10

10

$8,055.00

$8,055.00

30-May-10

31-Mar-11

IC

N

$0.00

$0.00

01-Apr-07 IC

07-Nov-07

N

$0.00

$0.00

24-Nov-07

23-Nov-08

12

$0.00

$0.00

24-Nov-08

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

01-Apr-10

31-Apr-11

Shifted from EQUIP 1

Musadiq

$0.00

01-Apr-07

31-Mar-08

$0.00

23-Apr-08

31-Dec-08

Hedayatullah Hamdard

Abdul Wali

Mansoor Ahmad

N/A

$9,600.00

8 Months &8 Days

$0.00

12

$0.00

$0.00

30-May-09

29-May-10

3

$0.00

$0.00

01-Jan-10

31-Mar-10

IC

12 Help Desk Officer/Assistant (@$9600 $9,600.00 per year)

Shifted from EQUIP 1

N/A

12

Help Desk Officer/Assistant (@$9600 $9,600.00 per year) 12 $0.00

N/A

Remarks

Shakir habibyar

Help Desk Officer/Assistant7(@$9600 per year)

12 S38.8

31-Mar-11

12

Network Officer

Months &7 Days

404

01-Apr-10

Progr ess of Proc urem ent as of

Imranulhaq

N

01-Apr-10

31-Mar-11

17-Mar-07

16-Mar-08

Mohammad Akbar Hedayat ullah Hamdard

N/A

$9,600.00

12

$0.00

$0.00

9 Months & 15 Days

$0.00

$0.00

12

$0.00

$0.00

Shifted from EQUIP 1

IC

N

17-Mar-08

31-Dec-08

01-Jan-09

31-Dec-09

$0.00

IC

N

01-Feb-07

31-Jan-08

$0.00

IC

N

01-Feb-07

31-Jan-08

Mohammad Akbar

Mohammad Shafi N/A

S38.10

12 $0.00 Help Desk Officer/Assistant (@$9600 per year) 12 $0.00 11

$9,119.00

$0.00

01-Jun-10

30-Apr-11

vacant

S38.11

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.12

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.13

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.14

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.15

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.16

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.17

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.18

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.19

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.20

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.21

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.22

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.23

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.24

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.25

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.26

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.27

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.28

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.29

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.30

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.31

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.32

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.33

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.34

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

Progr ess of Proc urem ent as of

S38.35

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.36

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.37

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.38

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.39

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.40

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.41

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.42

Provincial IT Officers

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S38.43

Provincial IT Officers

4

$0.00

$0.00

IC

N

01-Feb-08

30-Jun-08

Vacant

N/A

S38.44

Provincial IT Officers

17 Months

$0.00

$0.00

Vacant

N/A

S38.45

- - International$0.00 IT Project Design Advisor Subtotal $95,546.00

$0.00

-

-

-

-

Remarks

N/A

$86,427.00

Paktia Province

407

408

409

410

411

412

S40.1

S40.2

S40.3

S40.4

S40.5

S40.6

EQUIP Officer

Finance Officer

Social Mobilizer

Social Mobilizer

Engineer

12

$0.00

$0.00

01-Jan-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

15

$0.00

$0.00

1-Oct-07

31-Dec-08

17

$0.00

$0.00

1-Aug-07

31-Dec-08

12

$14,400.00

$14,400.00

1-Apr-10

31-Mar-11

IC

IC

N

N

31-Dec-09

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

17

$0.00

$0.00

12

$0.00

$0.00

12

$12,000.00

$12,000.00

IC

N

1-Aug-07

31-Dec-08

01-Jan-09

31-Dec-09

1-Apr-10

31-Mar-11

3

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$0.00

$0.00

01-Jan-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$12,000.00

$12,000.00

1-Apr-10

31-Mar-11

9

$0.00

$0.00

01-Apr-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$12,000.00

$12,000.00

1-Apr-10

31-Mar-11

5

$0.00

$0.00

3

$0.00

$0.00

IC

N

01-Aug-09

31-Dec-09

01-Jan-10

31-Mar-10

Mohammad Din

N/A

Vacant

N/A

Asem Jan

N/A

Shifted from EQUIP 1

Mohammad Sardar

Mohammad Akbar Stanekzai

N/A

Shifted from EQUIP 1

Shamsulhaq

N/A 1-Apr-10 $12,000.00 $62,400.00

Subtotal:

31-Mar-11

$12,000.00 $62,400.00

Shafaq Ikhlas

Teacher Education Program S39.1

Program coordinator

S39.2

Procurement Officer

S39.2

Procurement Officer

2

$0.00

$0.00

12

$0.00

$0.00

14

$0.00

$0.00

11 Months & 30 Days

IC

IC $0.00

N

01-Sep-06

30-Oct-06

01-Oct-06

30-Sep-07

Abdul Haq Rahmaty

N/A

01-Nov-07

31-Dec-08

Hamidullah

N/A

02-Jan-08

31-Dec-08

N

$0.00

12

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

2

$0.00

$0.00

IC

N

01-Sep-06

30-Oct-06

IC

N

S39.3

Finance Officer

12

$0.00

$0.00

S39.4

Admin Officer

8

$0.00

$0.00

12

$0.00

$0.00

IC

12

01-May-07

30-Apr-08

01-May-08

31-Dec-08

Y

01-Mar-07

28-Feb-08

S39.5

IT IICharge Officer

$0.00

$0.00

IC

N

01-Sep-06

31-Aug-07

S39.6

Technical Advisor @ US$58,500/yr 7 each$0.00

$0.00

IC

N

01-Sep-06

31-Mar-07

Shifted from EQUIP 1

Faizanullah Patan N/A

Egineer 12

Shifted from EQUIP 1

Ziaullah Hashmi

N/A

Mansoor Habibullah Habib Redwan

N/A

Ahmad Samim

N/A

Vacant

N/A

N/A

Shifted from EQUIP 1

SL No.

ID PKG. No. (New)

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Name of Consultant

S39.7

Core Trainers @US$4200/yr 7 each forTraining $0.00 section & Supervision/evaluation $0.00 section

01-Sep-06

31-Mar-07

S39.9

Computer Operator

12

$0.00

$0.00

25-Apr-07

24-Apr-08

15 filled & 26 Vacant Rohullah

$0.00

$0.00

25-Apr-08

31-Dec-08

Hameed

Computer Operator

8 Months &6 Days 12

$0.00

$0.00

01-Jan-09

31-Dec-09

S39.10

S39.11

S39.12

Computer Operator

IC

Remarks

N/A N/A

N

N/A

5

$0.00

$0.00

01-Nov-06

31-Mar-07

12

$0.00

$0.00

25-Apr-07

24-Apr-08

8 Months &6 Days

$0.00

$0.00

25-Apr-08

31-Dec-08

7

$0.00

$0.00

01-Sep-06

31-Mar-07

23

$0.00

$0.00

01-Feb-07

31-Dec-08

Office Assistant - TED

Progr ess of Proc urem ent as of

IC

Abdullah

N Asifullah N/A

IC

N

IC

N

12

$0.00

$0.00

01-Jan-09

31-Dec-09

15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Nasratullah Mohabat

N/A

Hamidi

N/A

S39.13

Evaluation officer for TED

S39.14

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.15

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.16

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.17

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.18

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.19

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.20

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.21

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.22

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.23

English Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.24

Computer Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.25

Computer Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.26

Computer Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.27

Computer Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.28

Computer Instructors for ILE&C 15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.29

Supervisor for ILE&C

15

$0.00

$0.00

IC

N

01-Feb-07

31-Jan-08

Vacant

N/A

S39.30

Supervisor for ILE&C

3

$0.00

$0.00

IC

N

01-Feb-07

30-Apr-07

Vacant

N/A

S39.31

Supervisor for ILE&C

3

$0.00

$0.00

IC

Y

01-Feb-07

30-Apr-07

Vacant

N/A

S39.32

Core Trainers ( 22 Staff Members) 3 @US$250/month $0.00 for AITE $0.00 - 1 semesterIC

N

01-Feb-07

30-Apr-07

Vacant

N/A

S39.33

Trainers (200 Staff Members) @US$120/month $0.00 for AITE - 1$0.00 semester

Vacant

N/A

S39.34

Admin. Staff (44 Staff Members) for AITE $0.00 @US$120/month$0.00 - 1 semester Subtotal: $0.00 $0.00

Vacant

N/A

Abdul Nabi Wahidi

N/A

Hussain Ali Ramozi

N/A

General Education

413

CS41.1

12 Snr. Subject Specialist-Mathematics

CS41.2

12 Snr. Subject Specialist-Mathematics 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

CS41.3

Advisor Curriculum Development-Mathematics 12 $0.00

$0.00

12 $0.00 Snr. Subject Specialist-Environmental Science 5 $0.00

$0.00

CS41.4

CS41.5

IC

N

IC

N

SSS

Y

IC

N

9-Dec-08

10-Dec-08

28-Feb-09

10-Dec-07

9-Dec-08

10-Dec-08

28-Feb-09

15-Dec-07

14-Dec-08

17-Jan-08

30-Dec-08

$0.00

1-Mar-09

31-Jul-09

12

$0.00

$0.00

10-Dec-07

9-Dec-08

10

$0.00

$0.00

1-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Mar-10

31-Mar-11

3 Snr. Subject Specialist-Physics

IC

N

12 $18,000.00 CS41.6

10-Dec-07

12 $0.00 Advisor Curriculum Development-Physics 2 $0.00 10

N/A

N/A

N/A Gul Ahmad Saghari

Shifted from EQUIP 1

$18,000.00 $0.00 $0.00

IC

N

1-Feb-08

30-Dec-08

10-Dec-08

28-Feb-09

$0.00

$0.00

1-Mar-09

31-Dec-09

$0.00

$0.00

5-Mar-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

CS41.7

12 Snr. Subject Specialist-Chemistry

$0.00

$0.00

CS41.8

2 $0.00 Advisor Curriculum Development-Chemistry

$0.00

12

Mr. Nangyalai Arsala Ghulam Faruq Khapulwak Extension dropped

IC

N

IC

N

10-Dec-07

9-Dec-08

01-Jan-09

28-Feb-09

Mohd Qasim Jamdar Nazar Mohammad Halim Mohd Hassan

N/A

N/A N/A

Budget

SL No.

ID PKG. No. (New) CS41.8

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Advisor Curriculum Development-Chemistry $0.00 10 3

CS41.9

414

CS41.10

Snr. Subject Specialist-Biology 12

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

1-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

$0.00

$0.00

15-Dec-07

14-Dec-08

15-Dec-07

14-Dec-08

01-Jan-09

28-Feb-09

IC

N

IC

N

12

$0.00

$0.00

2

$0.00

$0.00

$0.00

$0.00

1-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

10 Snr. Subject Specialist-History 3

12

CS41.11

10 Snr. Subject Specialist-Geography 3

$15,600.00

$15,600.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

1-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Dec-07

14-Dec-08

15-Dec-08

28-Feb-09

1-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

15-Dec-07

14-Dec-08

15-Dec-08

28-Feb-09

1-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Dec-07

14-Dec-08

39515

39812

IC

N

12 12 CS41.12

12

CS41.13

$21,600.00

$21,600.00

$0.00

$0.00

$0.00

$0.00

Snr. Subject Specialist-Civil Information 10 $0.00 3

416

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

10 $0.00 Snr. Subject Specialist-Dari3Literature $0.00

$0.00

IC IC

N N

IC

N

IC

N

$0.00

12 $12,000.00 CS41.14

CS41.15

$0.00

12 $0.00 Snr. Subject Specialist-Dari Literature $0.00

$0.00 $0.00

$0.00

$0.00

3 $0.00 Snr. Subject Specialist-Dari Literature

$0.00

IC

N

IC

N

IC

N

12 $24,000.00 12 $0.00 Snr. Subject Specialist-Pashtu Literature $0.00 10 418

CS41.16

$0.00 $0.00

$0.00

$0.00 $0.00

IC

N

IC

N

12 $21,600.00

10 419

CS41.17

CS41.18

$0.00 $0.00

$0.00

$0.00

3 $0.00 Snr. Subject Specialist-Pashtu Literature

$0.00

$12,000.00

$12,000.00

12

$0.00

$0.00

2 months 15 days

$0.00

$0.00

Snr. Subject Specialist-Uzbaki 10 Literature$0.00

$0.00

3

$0.00

IC

N

IC

N

IC

N

IC

N

$0.00

12 $15,000.00

Hayatullah Naser

01-Jan-09

28-Feb-09

1-Mar-09

31-Dec-09

N/A Ghulam Farooq Ansari

Shifted from EQUIP 1 N/A

Ghulam Jilani Aarez

Shifted from EQUIP 1 N/A

Aziz Bakhtiari

Hamidullah Weda

N/A

N/A N/A

Abdul Sabor Fakhri

Shifted from EQUIP 1

Vacant

N/A N/A

1-Jan-10

N/A 31-Mar-10 Asaadullah Muhaqqique

1-Apr-10

31-Mar-11

20-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

1-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr-10

31-Mar-11

31-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

1-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Dec-07

14-Dec-08

15-Dec-08

28-Feb-09

1-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr-10

31-Mar-11

Shifted from EQUIP 1 N/A Mohd Qasim Heelaman

N/A

Shifted from EQUIP 1 N/A

Baryalay Bajauray

N/A

Shifted from EQUIP 1

N/A

Shafiqa Yarqin

N/A

Shifted from EQUIP 1

$15,000.00

CS41.19

12 $0.00 Snr. Subject Specialist-Turkmani Literature 2 $0.00

$0.00

CS41.20

Snr. Subject Specialist-Baloochi 12 Literature $0.00

$0.00

$0.00

IC

N

IC

N

Remarks

N/A

$21,600.00

12

420

Salimi

$24,000.00

3 $0.00 Snr. Subject Specialist-Pashtu Literature

12 $0.00 Snr. Subject Specialist-Pashtu Literature 2 $0.00

Name of Consultant

Progr ess of Proc urem ent as of

$12,000.00

Snr. Subject Specialist-Dari12 Literature $0.00

10 417

Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00

12

415

Planned/Actual Date

1-Feb-08

30-Dec-08

01-Jan-09

28-Feb-09

Abdul Karim Nazar

N/A

15-Dec-07

14-Dec-08

Vacant

N/A

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

$0.00 12 Snr. Subject Specialist-Pashayee Literature 2 $0.00 10 421

CS41.21

Actual $0.00 $0.00

$0.00

$0.00

3 $0.00 Snr. Subject Specialist-Pashayee Literature

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N) IC

N

IC

N

12 $12,000.00 Snr. Subject Specialist-Nooristani 12 Literature $0.00

$0.00

CS41.23

12 $0.00 Snr. Subject Specialist-Pmiri Literature $0.00 2

$0.00

12 $0.00 Snr. Subject Specialist-Arabi Literature $0.00

$0.00

30-Dec-08 28-Feb-09

01-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

$0.00 $0.00

IC

N

IC

N

15-Dec-07

14-Dec-08

Vacant

N/A

17-Jan-08

30-Dec-08

Khair Mohammad

N/A

IC

N

01-Jan-09

28-Feb-09

20-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

N/A Hafiza Rahimi

Shifted from EQUIP 1

Abdul Wahab

N/A

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

IC

N

15-Dec-07

14-Dec-08

Vacant

N/A

CS41.26

$0.00 Snr. Subject Specialist-English 12 Literature

$0.00

IC

N

15-Dec-07

14-Dec-08

Vacant

N/A

12 $0.00 Snr. Subject Specialist-Islamic Education $0.00

$0.00

IC

N

16-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

10 $0.00 Snr. Subject Specialist-Islamic Education 3 $0.00

$0.00

01-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

$0.00 12 Snr. Subject Specialist-Islamic Education $0.00

$0.00

17-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

Snr. Subject Specialist-Islamic 10 Education $0.00

$0.00

01-Mar-09

31-Dec-09

Snr. Subject Specialist-Arts & Culture

$0.00

$0.00

IC

N

15-Dec-08

$0.00

$0.00

IC

N

01-Mar-09

$0.00

$0.00

CS41.29

3 Snr. Subject Specialist-Arts & Culture

$0.00

IC

N

$0.00 $0.00

IC

N

12 $13,500.00 CS41.30

$0.00

CS41.30

Snr. Subject Specialist-Computer 10

$0.00

Snr. Subject Specialist-Computer 12

$0.00

10 CS41.31

3 Snr. Subject Specialist-Computer

CS42.1

12 Snr. Subject Specialis-Quran Majid

Snr. Subject Specialis-Hadis 12Sharif CS42.2

10 Snr. Subject Specialis-Hadis Sharif 3

31-Mar-10

1-Apr_10‘

31-Mar-11

28-Feb-09

Saduddin Shpoon

N

01-Mar-09

31-Dec-09

Rasuol Zahir

N

15-Dec-08

28-Feb-09

N

01-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

30-Dec-08

$0.00

IC

$0.00

IC

$0.00

$0.00

IC

$0.00

$0.00

$21,600.00 $186,900.00

$21,600.00 $186,900.00

$0.00

$0.00

IC

N

3-Mar-08 01-Jan-09

28-Feb-09

IC

N

16-Dec-07

15-Dec-08

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

15-Dec-08

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

Snr. Subject Specialis-Arabic 12 Language$0.00

$0.00

$0.00

IC

N

39467

39812

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

3 $0.00 Snr. Subject Specialis-Arabic Language

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

12 $0.00 Snr. Subject Specialis-Arabic Language

N/A

Shifted from EQUIP 1

Abdul Hameed Aatif

31-Dec-09

12

CS42.5

1-Jan-10

01-Mar-09

N

$19,200.00

Abdul Hai Moqim

N/A

Dropped Sayeed 28-Feb-09 Abdullah N/A Framarz 31-Dec-09 Vacant,Amount reduced

$0.00

10 CS42.4

N/A Ehsanullah

10-Dec-08

IC

$0.00

12 Subtotal: Center for Excellence

N/A

$13,500.00

10 $0.00 Advisor Curriculum Development-Art & Culture $0.00

N/A

N/A Taj Mohammd Wahidyar

Mohammad Muzamel

Shifted from EQUIP 1

N/A

N/A Mohammad Amin Waqaad N/A N/A Enayatullah Khalil

Shifted from EQUIP 1

$19,200.00 $0.00

IC

N

17-Jan-08

Ezatullah

N/A

Sher Ali Zarifi

N/A

39812 2 CS42.6

12 Snr. Subject Specialis-Sirat Nabi

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

Remarks

N/A

Snr. Subject Specialist-English 12 Literature $0.00

10

424

3-Mar-08 01-Jan-09

Snr. Subject Specialist-Arabi 10Literature $0.00

CS41.28

423

Name of Consultant

CS41.25

CS41.27

422

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

$12,000.00

CS41.22

CS41.24

Planned/Actual Date

01-Jan-09

28-Feb-09

39469

39812

01-Jan-09

28-Feb-09

N

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

CS42.7

IC

N

$0.00

16-Dec-07

15-Dec-08

$0.00

16-Dec-08

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

3 Snr. Subject Specialis-Feqa

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Dec-07

14-Dec-08

12

CS42.8

Snr. Subject Specialis-Usool 10Feqa 3

$12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

15-Dec-08

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

30-Dec-08

IC

N

12

CS42.9

12 Snr. Subject Specialis-Usool Feqa

$18,000.00

$18,000.00

$0.00

$0.00

$0.00 $0.00 Snr. Subject Specialis-Pedagogy 12 & Psychology $0.00 10 427

CS42.10

$0.00

3 $0.00 Snr. Subject Specialis-Pedagogy & Psychology

IC

N

29-Mar-08 01-Jan-09

28-Feb-09

IC

N

16-Dec-07

15-Dec-08

$0.00

16-Dec-08

28-Feb-09

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

$0.00 $0.00

12 $12,000.00

428

CS42.11

429

CS42.16

N/A

Mohammad Baqir Jafari

N/A

Shifted from EQUIP 1 Mohammad Zaki Ehsani

N/A

N/A

Shah Wali Allah Adeb

N/A

Shifted from EQUIP 1

$0.00

39511

39812

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

25-Feb-08

30-Dec-08 28-Feb-09

Mohammad Jawad Salihi

N/A

01-Jan-09 15-Dec-07

14-Dec-08

Shafiq Samim

N/A

15-Dec-08

28-Feb-09

01-Mar-09

31-Dec-09

21-Feb-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

17-Jan-08

30-Dec-08

10 Snr. Subject Specialis-Hadis3 Sharif

$21,600.00

$21,600.00

$0.00

$0.00

$0.00

$0.00

Snr. Subject Specialis-Aqayed 12 & Adyan $0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Snr. Subject Specialis-Aqayed 12 & Adyan $0.00

$0.00

12 Snr. Subject Specialis-Hadis Sharif 2

2

N

IC IC

IC

N N

N

$0.00

$0.00

Snr. Subject Specialis-Aqayed 10 & Adyan $0.00

$0.00

Snr. Subject Specialis-Feqa12

$0.00

$0.00

$0.00

$0.00

01-Jan-09

28-Feb-09

IC

N

10 Snr. Subject Specialis-Feqa 3

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$0.00

$0.00

20-Jan-08

30-Dec-08

Snr. Subject Specialis-Feqa10 3

IC

N

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

$12,000.00

$12,000.00

$0.00

$0.00

15-Dec-07

14-Dec-08

$0.00

$0.00

15-Dec-08

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

9 days

$0.00

$0.00

1-Jan-10

09-Jan-10

$0.00

$0.00

10-Jan-00

31-Mar-10

1-Apr_10‘

31-Mar-11

Snr. Subject Specialis-Usool 12Feqa

CS42.17

Shifted from EQUIP 1

$0.00

12

430

N/A

2

Snr. Subject Specialis-Usool 10Faq

CS42.15

Sayed Abdul Wahab Rahmani

$12,000.00 IC

3 Snr. Subject Specialis-Usool Feqa 12

$42,000.00

$42,000.00

IC

N

Remarks

N/A

$0.00

CS42.13

CS42.14

Name of Consultant

Progr ess of Proc urem ent as of

12

12

CS42.12

Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00

12

426

Planned/Actual Date

$0.00

Snr. Subject Specialis-Feqa12

425

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

N/A

Nematullah Mahmoodi

vacant Abdul Hamid Mohammadi

N/A

Shifted from EQUIP 1

N/A N/A N/A N/A

Ghulamudin Kalantari

N/A

N/A

Assadullah Hanif

N/A

Shifted from EQUIP 1 N/A Mohammad Yousuf Niazi

Shair Ali Zarifi

N/A

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) Snr. Subject Specialis-Usool 12Feqa

$0.00

IC

N

20-Jan-08

30-Dec-08

Name of Consultant

Khalilurahman Henani

$0.00

01-Jan-09

28-Feb-09

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

Abdul Zahir Modaqiq

CS42.19

Snr. Subject Specialis-Arabic 10 Language$0.00

$0.00

01-Mar-09

31-Dec-09

Deleted.

CS42.20

Snr. Subject Specialis-Arabic 10 Language$0.00

$0.00

01-Mar-09

31-Dec-09

Vacant

$0.00

$0.00

01-Mar-09

31-Dec-09

Vacant

Snr. Subject Specialis-English Language 7 $0.00

$0.00

01-Jul-09

29-Jan-10

Wali

CS42.21

CS42.22

3

$0.00

$0.00

01-Feb-10

31-Mar-10

12

$18,000.00

$18,000.00

1-Apr_10‘

31-Mar-11

10

$0.00

$0.00

01-Mar-09

31-Dec-09

3 Language$0.00 Snr. Subject Specialis-English

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

IC

N

12 $13,200.00 CS42.23

10 Snr. Subject Specialis- Physics 3

N/A

Shifted from EQUIP 1

Roya Rahimi

$13,200.00

$0.00

$0.00

01-Mar-09

31-Dec-09

Vacant

$0.00

$0.00

1-Jan-10

31-Mar-10

Khan Shireen

Snr. Subject Specialis-Pedagogy 10 & Psychology $0.00

$0.00

01-Mar-09

31-Dec-09

Deleted.

$0.00

$0.00

01-Mar-09

31-Dec-09

Deleted.

$168,000.00

$168,000.00 Mohammad Azim Karbalai

12

N/A

Vacant

Specialis - TVT

$0.00

$0.00

Snr. Subject Specialist Human Rights $0.00

$0.00

1-Feb-08

30-Dec-08

01-Jan-09

28-Feb-09

CS43.1

7 $0.00 Snr. Subject Specialist Human Rights

N

01-Mar-09

30-Sep-09

IC

N

17-Dec-07

16-Dec-08

Extension dropped Vacant

CS43.2

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

CS43.5

Snr. Subject Specialist Counter 12 Narcotics $0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

CS43.6

Snr. Subject Specialist Mine 12Awarness $0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

CS43.7

Subject Editor (Gender)

12

$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

CS43.8

Subject Editor (Gender)

12

$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

12

$0.00

$0.00

24-Mar-08

30-Dec-08

Subject Editor (Human Rights)

$0.00

$0.00

01-Jan-09

28-Feb-09

Abdul Wasi

N/A

CS43.9

7 Subject Editor (Human Rights)

$0.00

CS43.10

12 Subject Editor (Envoirnement)

CS43.11

Subject Editor (Health)

CS43.1

IC

N

$0.00

IC

Snr. Subject Specialist Human 12 Rights $0.00

$0.00

CS43.3

12 Snr. Subject Specialist Gender

$0.00

CS43.4

12 Snr. Subject Specialist Health

CS43.9

12 12

CS43.12

IC

N

$0.00

IC

N

01-Mar-09

30-Sep-09

$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Extension dropped Vacant

$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

IC

N

IC

N

$0.00

$0.00

$0.00

$0.00

10

$0.00

$0.00

3

$0.00

$0.00

Subject Editor (Islamic Principles)

12 Subject Editor (Islamic Principles) 12

CS43.13

$18,000.00

$18,000.00

$0.00

$0.00

Subject Editor (Afghan Culture Values) $0.00 $18,000.00 Subtotal: Senior Editor CS44.1

Sub Editor-Dari Sub Editor-Dari

12 12

CS44.2 CS44.3

$0.00

IC

N

IC

Y

N/A N/A N/A

N/A N/A N/A

3-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

24-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

Abdul Ghafoor Qarar

N/A

39539

39812

Said Faruq Farani

N/A

01-Jan-09

28-Feb-09

N/A Qiaumdin Kashaf

N/A

Shifted from EQUIP 1

$18,000.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Sub Editor-Dari

10

$0.00

$0.00

Sub Editor-English

12

$0.00

$0.00

$0.00

$0.00

IC

IC

Y

Y

39539

Remarks

from

CS42.25

10

Progr ess of Proc urem ent as of

Salma

CS42.24

Subtotal: Cross Cutting

433

Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00

10

432

$0.00

Planned/Actual Date

$0.00 10 Snr. Subject Specialis-Flasafa Islamic $0.00 3

CS42.18

431

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

01-Jan-09

39812 N/A 28-Feb-09 Ahmad Yaseen Farkhari

01-Mar-09

31-Dec-09

39539

39812

N/A Ehsan Azari

N/A

SL No.

ID PKG. No. (New)

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s) Sub Editor-Histori

12

CS44.4

CS44.5

CS44.6

CS44.7

CS44.8

$0.00

$0.00

$0.00

$0.00

Sub Editor-Histori

10

$0.00

$0.00

Sub Editor-Histori

12

$0.00

$0.00

$0.00

$0.00

Sub Editor (Mathematics) 12

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

12 434

Actual

Sub Editor (Mathematics)

N/A

IC

Y

39539

39812

Mohammad Nasir Chafie

N/A

01-Jan-09

28-Feb-09

39539

39812

Y

9

$26,550.00

$0.00

01-Jul-10

30-Apr-11

10

CS44.10

12 Sub Editor (Dari Literature)

CS44.11

Sub Editor (Pedagogy)

Sub Editor (Pashtu Literature)

12 12

CS44.12

28-Dec-08

IC

Y

29-Dec-07

28-Dec-08

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09 N/A Mohammad Zarin Anzoor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

Y

IC

Y

IC

Y

39539

39812

01-Jan-09

28-Feb-09

13-Apr-08

30-Dec-08

01-Jan-09

28-Feb-09

39539

39812

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

29-Dec-07

28-Dec-08

10

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Sub Editor (Georgraphy) 12

$0.00

$0.00

1-Apr-08

39812

2

$0.00

$0.00

01-Jan-09

28-Feb-09

Sub Editor (Georgraphy) 10

$0.00

$0.00

01-Mar-09

31-Dec-09

Sub Editor (Chemistry)

12

Sub Editor (English Literature) 12

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Sub Editor (Environment &12 Pedagogy) $0.00

$0.00

$0.00

$0.00

Sub Editor (Pashtu Literature) 12 CS44.19

2

$0.00

$0.00

$0.00

$0.00

Sub Editor (Pashtu Literature) 10

$0.00

$0.00

Language Editor-Pamiri

12

$0.00

$0.00

Language Editor-Pamiri

10

CS44.20

Subject Editor-Mathematics12

Subtotal: Graphic Designer

N/A Vacant Vacant

29-Dec-07

12

12

N/A Telabaz Habibzai

Y

Sub Editor (Physics)

Sub Editor (Computer)

N/A

IC

Sub Editor (Physics)

CS44.14

CS44.21

Ghulam Ahmad Waak

28-Feb-09

$0.00

CS44.18

39812

31-Dec-09

$0.00

CS44.17

31-Dec-09

39539

01-Jan-09

$0.00

N/A

01-Mar-09

IC

IC

Y

IC

Y

Makhan Shinwari

N/A N/A

Vacant

Rahmatullah Zwakman

N/A N/A N/A

Y

1-Apr-08

39812

Shawkat Ali Shefa

N/A

01-Jan-09

28-Feb-09

29-Dec-07

28-Dec-08

Vacant

N/A

Sharifa Sharif

N/A

Y

IC

Y

IC

IC

Y

Y

1-Apr-08

39812

01-Jan-09

28-Feb-09

15-Jul-08

31-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

30-Dec-09

1-Apr-08

39812

01-Jan-09

28-Feb-09 30-Apr-09

$0.00

N/A

IC

01-Mar-09

$26,550.00

Farida Akram

39812

$0.00

$0.00

N/A

1-Apr-08

$0.00 $0.00

Eshaq Negaargar

Y

$0.00 $0.00

N/A

IC

$0.00

$0.00

N/A

Abdul Qadir Wadan

IC

IC

Y

39539

39812

01-Jan-09

28-Feb-09

N/A

N/A N/A Gharib Mr. Mohammad Ashooq Mohammad N/A Saber Mohammad Saber Azizullah Aral

N/A

N/A

CS45.1

Snr. Technical Specialist/ Graphic 12 Designer$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

CS45.2

Snr. Technical Specialist/ Graphic 12 Designer$0.00

$0.00

IC

N

17-Dec-07

16-Dec-08

Vacant

N/A

$0.00

$0.00

Subtotal: Subject Specialist 12 10

$0.00

$0.00

IC

N

22-Dec-07

21-Dec-08

$0.00

$0.00

IC

N

22-Dec-08

28-Feb-09

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

Remarks

Rasul Bawari

Y

01-Mar-09

12

Name of Consultant

Progr ess of Proc urem ent as of

IC

$0.00

$0.00

CS44.16

39812 28-Feb-09

$0.00

$0.00

CS44.15

39539 01-Jan-09

$0.00 $0.00

CS44.13

Y

Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00

Sub Editor (Pashtu Literature) 12

Sub Editor (Physics)

IC

Planned/Actual Date

10

$0.00

CS44.9

IDA Proce Prior dure/ Revie Metho w d (Y/N)

N/A N/A

Budget

SL No.

435

ID PKG. No. (New)

CS46.1

Duratio Name of Contract (BriefnDescription) (Month Planed s) Subject Specialist-Mathematics 3

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

12

436

CS46.2

CS46.7

CS46.8

CS46.10

CS46.11

IC

N

23-Dec-07

$0.00

IC

N

23-Dec-08

28-Feb-09

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

10 Subject Specialist-Mathematics 3

10 Subject Specialist-Mathematics 3

$12,000.00

$12,000.00

$0.00

$0.00

IC

N

39560

39812

$0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

Subject Specialist-Mathematics 12 Subject Specialist-Mathematics 12

$14,400.00

$14,400.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Subject Specialist-Environmental 12 Science $0.00

$0.00

$0.00

$0.00

$0.00 Subject Specialist-Environmental 12 Science

$0.00

$0.00

440

Vacant

N/A

IC

N

Sayed Bahadur

N/A

Hedayatullah Hedayat

N/A

IC

N

IC

N

29-Apr-08

30-Dec-08 28-Feb-09

11-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

5-Mar-08

30-Dec-08 28-Feb-09

10 $0.00 Subject Specialist-Environmental Science 3 $0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

$14,400.00

$14,400.00

12

$0.00

$0.00

2

$0.00

$0.00

01-Jan-09

28-Feb-09

10 $0.00 Subject Specialist-Environmental Science 3 $0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

N/A Abdul Mohammad Aziz

Sayed Mawjod Shah

N/A

Shifted from EQUIP 1

N/A

Shifted from EQUIP 1

$12,000.00

Subject Specialist-Environmental 12 Science $0.00

$0.00

$0.00

$0.00 $0.00

2

$0.00

$0.00

CS46.15

Subject Specialist-Physics 12

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

N

22-Dec-07

21-Dec-08

Vacant

N/A

IC

N

26-Mar-08

30-Dec-08

Shir Mohammad

N/A

01-Jan-09

28-Feb-09

IC

N

22-Dec-07

21-Dec-08

Vacant

N/A

IC

N

23-Dec-07

22-Dec-08

Besmillah Wali AhmadZai

N/A

01-Jan-09

28-Feb-09

IC

N

16-Jan-08

30-Dec-08

$0.00

$0.00

12

$0.00

$0.00

2 Subject Specialist-Chemistry 10

$0.00

$0.00

22-Dec-08

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

$0.00

$0.00

23-Dec-08

3

Shifted from EQUIP 1

21-Dec-08

01-Jan-09

Subject Specialist-Biology

N/A

22-Dec-07

$0.00

$0.00

CS46.19

Obaidullah Safi

N

$0.00

10

N/A

IC

$0.00

12

Shifted from EQUIP 1

N/A

$0.00

Subject Specialist-Physics 12

CS46.17

N/A

Vacant

2

Subject Specialist-Chemistry 12

Hamdullah Sherzai

21-Dec-08

$0.00

CS46.14

CS46.16

Shifted from EQUIP 1

22-Dec-07

01-Jan-09

IC

N

N/A Mohammad Anwar Sarbuland

N/A

22-Dec-08

Abdul Qudos

N/A

Abdul Ghafor G

N/A

$0.00

$0.00

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

1-Jan-10

31-Mar-10

Remarks

Mehria

N

12

$12,000.00

Name of Consultant

Progr ess of Proc urem ent as of

IC

12 CS46.13

22-Dec-08

$0.00

$0.00

12

439

31-Mar-11

2

2

438

1-Apr_10‘ $12,000.00

2 CS46.9

31-Mar-10

$0.00

12 CS46.6

1-Jan-10

$12,000.00

Subject Specialist-Mathematics 12

437

Contract Signing/ Date of Actual Date of Completion Contract Signing

12

12

CS46.4

Planned/Actual Date

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

12

CS46.24

CS46.25

CS46.27

CS46.28

$12,000.00 $0.00

5-Mar-08

30-Dec-08

Subject Specialist-History 2

$0.00

$0.00

01-Jan-09

28-Feb-09

CS46.29

CS46.31

$0.00

01-Mar-09

31-Mar-09

N/A

$0.00

7-Apr-08

31-Dec-08

N/A

2

$0.00

$0.00

01-Jan-09

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

Subject Specialist-History 3

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$24,000.00

$24,000.00

1-Apr_10‘

31-Mar-11

12

$0.00

$0.00

13-Jan-08

30-Dec-08

CS46.33

N

Subject Specialist-Geography 2

$0.00

$0.00

01-Jan-09

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

12

$0.00

$0.00

23-Dec-07

22-Dec-08

$0.00

$0.00

$0.00

$0.00

01-Mar-09

31-Dec-09

23-Dec-07

22-Dec-08

01-Jan-09

28-Feb-09

23-Dec-07

22-Dec-08

01-Jan-09

28-Feb-09

5-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

Subject Specialist-Biology

12 Subject Specialist-Geography

12 Subject Specialist-Geography

12 Subject Specialist-Civil Information

10 Subject Specialist-Civil Information 3

Subject Specialist-Civil Information 12

10 Subject Specialist-Dari Literature 3

12 Subject Specialist-Dari Literature

12

444

IC

10 Subject Specialist-Dari Literature 3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

IC

IC

IC

IC

N

N

N

N

$0.00

$0.00

18-Mar-08

30-Dec-08

$0.00

$0.00

N

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

$12,000.00

$12,000.00

1-Apr_10‘

31-Mar-11

$0.00

$0.00

$0.00

$0.00

IC

N

23-Dec-07

22-Dec-08

IC

N

$0.00

$0.00

15-Jan-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

$16,800.00

$16,800.00

1-Apr_10‘

31-Mar-11

$0.00

$0.00

20-Jan-08

30-Dec-08

$0.00

$0.00

10-Dec-08

28-Feb-09

$0.00

$0.00

10-Dec-07

9-Dec-08

IC

IC

N

N

CS46.34

12 Subject Specialist-Dari Literature 2

N/A

Shifted from EQUIP 1 N/A Mohammad Raziq Bahir N/A Vacant Hayatullah Nasar Kazimia Sadat Mohaqiq

N/A

Safura Mazari

N/A

Mohd Faroq

Vacant

N/A Abdul Raziq Asmar

Shifted from EQUIP 1 Mohammad Nasem Faqeri

28-Feb-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Mar-08

30-Dec-08

Mohd Afzal Banuwal

01-Jan-09

28-Feb-09

Mohd Afzal Banuwal

$0.00

$0.00

N/A

N/A

31-Dec-09

N

N/A N/A

01-Jan-09

IC

N/A

Shifted from EQUIP 1

01-Mar-09

$0.00

N/A

Kazimia Sadat Mohaqiq

$0.00

$0.00

N/A

N/A

$0.00

$14,400.00

N/A

Safura Mazari

$0.00

$14,400.00

Shifted from EQUIP 1

Zalmai Hottak

$0.00

12

Remarks

N/A

$0.00

12

CS46.32

Shah Sanam Omari Jabarkhil

$0.00

12

443

N

Hayatullah Nasar

10

12 CS46.30

IC

Name of Consultant

Progr ess of Proc urem ent as of

8.75

12

442

31-Mar-11

$0.00

10

CS46.26

1-Apr_10‘ $12,000.00

CS46.21

CS46.22

Contract Signing/ Date of Actual Date of Completion Contract Signing

12

CS46.21

441

Planned/Actual Date

Sayed Mahmood Khaliq

N/A

Shifted from EQUIP 1 N/A

Budget

SL No.

ID PKG. No. (New)

CS46.35

Duratio Name of Contract (BriefnDescription) (Month Planed s) Subject Specialist-Dari Literature 12 2

CS46.36

CS46.37

CS46.38

445

CS46.39

Subject Specialist-Dari Literature 12

Subject Specialist-Dari Literature 12

Subject Specialist-Dari Literature 12

Actual

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

12

$0.00

$0.00

2

$0.00

$0.00

$0.00 $0.00

10 Subject Specialist-Dari Literature 3

IDA Proce Prior dure/ Revie Metho w d (Y/N) IC

IC

N

N

IC

N

IC

N

CS46.40

Subject Specialist-Pashtu Literature 2 10

12 CS46.41

CS46.42

Subject Specialist-Pashtu Literature

30-Dec-08 28-Feb-09

25-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

24-Dec-07

23-Dec-08

N

$12,000.00

$0.00

$0.00

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

$0.00

$0.00

15-Jan-08

30-Dec-08

IC

N

3

$0.00

$0.00

1-Jan-10

31-Mar-10

$0.00

$0.00

21-Feb-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

1-Feb-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

30-Jan-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

12-Feb-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

20-Apr-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

24-Apr-08

30-Dec-08

12 Subject Specialist-Pashtu Literature

12 Subject Specialist-Pashtu Literature

12 Subject Specialist-Pashtu Literature

12 Subject Specialist-Pashtu Literature

Subject Specialist-Pashtu Literature 12

Subject Specialist-Pashtu Literature 12

2

12 Subject Specialist-Uzbaki Literature

$0.00

$0.00

$0.00

$0.00

$0.00 $0.00

IC

IC

IC

N

N

N

N

IC

N

IC

N

28-Feb-09 30-Dec-08

$0.00

01-Jan-09

28-Feb-09

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

12 $0.00 Subject Specialist-Turkmani Literature

$0.00

12 Subject Specialist-Uzbaki Literature

IC

N

20-Apr-08

$0.00

12 Subject Specialist-Uzbaki Literature

IC

01-Jan-09

$0.00

2

CS46.52

$12,000.00

28-Feb-09

2

CS46.51

N/A

24-Dec-07

31-Dec-09

Subject Specialist-Pashtu Literature 10

CS46.50

Zohour Zohouri

28-Feb-09

01-Jan-09

2

CS46.49

N/A

01-Jan-09

01-Mar-09

Subject Specialist-Pashtu Literature 12 CS46.48

Vacant

30-Dec-08

$0.00

2 CS46.47

23-Dec-08

22-Apr-08

$0.00

2 CS46.46

N/A

28-Feb-09

$0.00

2 CS46.45

Shujauddin Khorasani

01-Jan-09

$0.00

2 CS46.44

N/A

30-Dec-08

5-Mar-08

IC

IC

IC

IC

IC

N

N

N

N

Name of Consultant

Progr ess of Proc urem ent as of

Ikramuddin Hessaryan

15-Mar-08

10

2 CS46.43

Contract Signing/ Date of Actual Date of Completion Contract Signing

24-Dec-08

12

12

Planned/Actual Date

20-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

1-Feb-08

30-Dec-08

01-Jan-09

28-Feb-09

17-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

1-Feb-08

30-Dec-08

Remarks

N/A N/A Farzana

Shifted from EQUIP 1 Said Ahmad Momand Said Ahmad Momand Abdul Rahim

N/A

N/A Hazrat Gul Archiwal N/A

Mohd Hakim Taniwal

N/A

Nematullah Ander

N/A

Mohd Aajan Haqpal

N/A

Sayed Mohaiuddin

N/A

Abdul Qayum Mushwani

N/A

Mohammad Asif N/A Samim

Nasim Gul Totakhail

N/A N/A

Burhanuddin Namiq

N/A

Mohd Halim Yarqin

N/A

Hafizullah Rahiq N/A

Hafizullah Oufon

N/A

Budget

SL No.

446

ID PKG. No. (New)

CS46.53

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

2

$0.00

$0.00

12

$0.00

$0.00

2

$0.00

10 $0.00 Subject Specialist-Turkmani3Literature $0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$12,000.00

28-Feb-09

20-Jan-08

30-Dec-08

$0.00

01-Jan-09

28-Feb-09

$0.00

01-Mar-09

31-Dec-09

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

15-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

20-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

N

CS46.55

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

447

CS46.56

Subject Specialist-Baloochi12 Literature

IC

IC

IC

N

N

12

$0.00

$0.00

1-Apr-08

30-Dec-08

2

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

25-Dec-07

24-Dec-08

01-Jan-09

28-Feb-09

20-Jan-08

30-Dec-08

25-Dec-08

28-Feb-09

1-Feb-08

30-Dec-08

10 Subject Specialist-Baloochi 3Literature

N

12 $12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

Subject Specialist-Pashayee 12Literature $0.00

$0.00

$0.00

$0.00

CS46.59

Subject Specialist-Pashayee 12Literature $0.00

$0.00

$0.00

$0.00

CS46.60

Subject Specialist-Pashayee 12Literature $0.00

$0.00

$0.00

$0.00

CS46.61

Subject Specialist-Nooristani 12Literature $0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Subject Specialist-Nooristani 2 Literature $0.00

CS46.57

CS46.58

Subject Specialist-Baloochi12 Literature

CS46.64

CS46.65

CS46.66

CS46.67

N

N/A Khair Mohammad Gumshadzi

Ghulam Sediq Shenganak

N/A

Mohammad Hasan Hesam

N/A

Mohammad Nadir

N/A

Khosh Nazar

N/A

N/A

25-Dec-08

28-Feb-09

IC

N

25-Dec-07

24-Dec-08

01-Jan-09

28-Feb-09

25-Dec-07

24-Dec-08

Munawar Khan

$0.00

01-Jan-09

28-Feb-09

Munawar Khan

$0.00

$0.00

01-Mar-09

31-Dec-09

Khosh Nazar Pamirzad

Subject Specialist-Nooristani 12Literature $0.00

$0.00

25-Dec-07

24-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

17-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

$0.00

$0.00

Subject Specialist-Nooristani 10Literature $0.00

$0.00

Subject Specialist-Pamiri Literature 12

$0.00

$0.00

$0.00

$0.00

IC

IC

N

N

N/A N/A

Khosh Nazar

N/A

$0.00

$0.00

17-Jan-08

30-Dec-08

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

1-Jan-10

31-Mar-10

$18,000.00

$18,000.00

1-Apr_10‘

31-Mar-11

Subject Specialist-Pamiri Literature 10

$0.00

$0.00

01-Mar-09

31-Dec-09

Dropped

N/A

Subject Specialist-Pamiri Literature 12

$0.00

$0.00

1-Feb-08

30-Dec-08

Mir Ali

N/A

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

16-Jan-08

30-Dec-08

10 Subject Specialist-Arabi Literature 3

IC

IC

N

Azizullah Shalmach

N/A

$0.00 3 Subject Specialist-Pamiri Literature

IC

N

Shifted from EQUIP 1 N/A

28-Feb-09

IC

N/A

Mohammad Nadir

30-Dec-08

N

N

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

24-Jan-08

30-Dec-08

12

CS46.68

N/A

1-Feb-08

12

449

IC

N

Ghulam Sakhi Wakilzada

01-Jan-09

12 CS46.65

Shifted from EQUIP 1 N/A

N

2

N/A

Abdul Aziz Omar

IC

12

448

Abdul Majid Turan

N

10

CS46.63

IC

12 Subject Specialist-Arabi Literature

$12,000.00

$12,000.00

$0.00

$0.00

IC

N

Remarks

N/A

IC

12 CS46.62

Name of Consultant

Progr ess of Proc urem ent as of

$12,000.00

Subject Specialist-Turkmani 12Literature $0.00 2

Contract Signing/ Date of Actual Date of Completion Contract Signing 01-Jan-09

IC

12

CS46.54

Planned/Actual Date

N/A Khosh Nazar Pamirzad

Shifted from EQUIP 1

N/A

Mohammad Asif N/A

Shifted from EQUIP 1 Abdul Habib Samim

N/A

SL No.

ID PKG. No. (New)

CS46.69

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

12 Subject Specialist-English Literature

CS46.70

12 Subject Specialist-English Literature

CS46.71

Subject Specialist-English Literature 12

CS46.72

CS46.73

CS46.74

CS46.75

CS46.76

Subject Specialist-English Literature 12

Subject Specialist-Islamic Studies 12

Subject Specialist-Islamic Studies 12

Subject Specialist-Islamic Studies 12

Subject Specialist-Islamic Studies 12

12

450

CS46.77

10 Subject Specialist-Islamic Studies 3

Actual

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IDA Proce Prior dure/ Revie Metho w d (Y/N)

451

CS46.78

CS46.79

453

28-Feb-09

N

25-Dec-07

24-Dec-08

Vacant

N/A

IC

N

25-Dec-07

24-Dec-08

Vacant

N/A

IC

N

25-Dec-07

24-Dec-08

Vacant

N/A

IC

N

25-Dec-07

24-Dec-08

Vacant

N/A

IC

N

20-Jan-08

30-Dec-08

Ihsanullah Madani

N/A

01-Jan-09

28-Feb-09

16-Jan-08

30-Dec-08

Seddiqullah Reshtia

N/A

01-Jan-09

28-Feb-09

16-Jan-08

30-Dec-08

Zaheeruddin

N/A

01-Jan-09

28-Feb-09 Enayatullah Adil

N/A

IC

IC

IC

IC

N

N

N

N

16-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

16-Jan-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

24-Jan-08

30-Dec-08

$12,000.00

$12,000.00

$0.00

$0.00

IC

N

Noor u llah

N/A

$0.00

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

$12,000.00

$12,000.00

1-Apr_10‘

31-Mar-11

12

$0.00

$0.00

24-Jan-08

25-Dec-08

Aenu Naeem

2

$0.00

$0.00

01-Jan-09

28-Feb-09

Aenu Naeem

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

24-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

10 Subject Specialist-Islamic Studies 3

N

Subject Specialist-Islamic Studies 12

$14,400.00

$14,400.00

$0.00

$0.00

$0.00

$0.00

IC

N

N/A

Shifted from EQUIP 1

$0.00

IC

Khalilullah

N/A

Shifted from EQUIP 1

Aenu Naeem

N/A N/A

Shifted from EQUIP 1 Abdul Jabar Ahmad Naser Sarmast Abdul Hameed Aatif

N/A

N/A

CS46.81

Subject Specialist-Culture & 12Arts

$0.00

$0.00

IC

N

16-Apr-08

31-Dec-08

CS46.82

Subject Specialist-Culture & 12Arts

$0.00

$0.00

IC

N

22-Apr-08

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

CS46.83

Subject Specialist-Computer 12

$0.00

$0.00

IC

N

26-Dec-07

25-Dec-08

Vacant

N/A

CS46.84

Subject Specialist-Computer 12

$0.00

$0.00

IC

N

26-Dec-07

25-Dec-08

Vacant

N/A

12

$0.00

$0.00

IC

N

18-Apr-08

30-Dec-08

CS46.85

Subject Specialist-Sport

$0.00

$0.00

01-Jan-09

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

12 $12,000.00

$12,000.00

Remarks

N/A

$0.00

12 CS46.80

01-Jan-09

Name of Consultant

$0.00 10 Subject Specialist-Islamic Studies 3 12

452

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

IC

12

12

Planned/Actual Date

N/A

N/A

Abdul Aziz Behbod

N/A

Shifted from EQUIP 1

Budget

SL No.

ID PKG. No. (New)

CS46.86

CS46.87

CS46.88 Subtotal:

Duratio Name of Contract (BriefnDescription) (Month Planed s) Subject Specialist-Sport

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

12

$0.00

$0.00

IC

N

26-Dec-07

25-Dec-08

12

$0.00

$0.00

IC

N

26-Feb-08

30-Dec-08

Subject Specialist-Technical Education $0.00

$0.00

01-Jan-09

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

31-Mar-10

26-Dec-07

25-Dec-08

Subject Specialist-Technical 12Education $0.00 $260,400.00

$0.00

IC

N

Name of Consultant

Vacant

Progr ess of Proc urem ent as of

Remarks

N/A

N/A Sayed Rahmat Shah N/A Vacant

N/A

$260,400.00

Cross Cutting CS47.1

Subject Specialist Human Rights 12

$0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

Abdul Haq

N/A

CS47.2

Snr. Subject Specialist Human 12 Rights $0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

Jafar Mahdawi

N/A

CS47.3

Snr. Subject Specialist Gender 12

$0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

Esmat Ayoubi

N/A

CS47.4

Snr. Subject Specialist Gender 12

$0.00

$0.00

IC

N

27-Dec-07

26-Dec-08

Vacant

N/A

CS47.5

Subject Specialist-Distance 12Education $0.00

$0.00

IC

N

27-Dec-07

26-Dec-08

Vacant

N/A

CS47.6

Snr. Subject Specialist Health 12 Education$0.00

CS47.7 CS47.8 Subtotal:

$0.00

IC

N

27-Dec-07

26-Dec-08

Vacant

N/A

$0.00

$0.00

IC

N

27-Dec-07

26-Dec-08

Vacant

N/A

Snr. Subject Specialist Mine 12Awarness $0.00

$0.00

IC

N

27-Dec-07

26-Dec-08

Vacant

N/A

$0.00

$0.00

Sub-Specialist-Distance Education 12

Graphic Desigen CS48.1

Technical Specialist/ Graphic 12 Designe $0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

Vacant

N/A

CS48.2

Technical Specialist/ Graphic 12 Designe $0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

Vacant

N/A

CS48.3

Technical Specialist/ Graphic 12 Designe $0.00

$0.00

IC

N

29-Dec-07

28-Dec-08

Vacant

N/A

CS48.4 Subtotal:

Technical Specialist/ Graphic 12 Designe $0.00

$0.00

IC

N

29-Dec-07

28-Dec-08

Vacant

N/A

$0.00

$0.00

IC

N

22-Jan-08

31-Dec-08

Ahmad Fawad

N/A

IC

N

Data Clerks

454

CS49.1

12

$0.00

$0.00

2

$0.00

$0.00

$0.00

$0.00

$0.00

10 Graphic Designer/ Data Clerk 3

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$3,600.00

$3,600.00

1-Apr_10‘

31-Mar-11

22-Jan-08

31-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

Wazir Gul Seddiqi

01-Mar-09

31-Dec-09

vacant

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

Shifted from EQUIP 1

Safatullah 12

CS49.2

CS49.3

CS49.4

12

$0.00

$0.00

2 Graphic Designer/ Data Clerk

$0.00

$0.00

10

$0.00

$0.00

12

$0.00

$0.00

2 Graphic Designer/ Data Clerk

$0.00

$0.00

10

$0.00

$0.00

12

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Graphic Designer/ Data Clerk 10 12

455

CS49.5

10 Graphic Designer/ Data Clerk 3 12 12

456

CS49.6

10 Graphic Designer/ Data Clerk 3

$0.00

$0.00

$0.00

$0.00

IC

N

IC

N

IC

N

IC

N

IC

N

IC

N

IC

N

IC

N

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

$4,800.00

$4,800.00

1-Apr_10‘

31-Mar-11

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

$0.00

$0.00

$0.00

$0.00

IC

N

IC

N

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

$4,800.00

$4,800.00

1-Apr_10‘

31-Mar-11

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

N/A Omaid Mansoor N/A N/A

N/A Lieaqat Ali N/A Samen

N/A N/A

Sayed Mohd Agha Hashimi

Abdul Haadi

Shifted from EQUIP 1 N/A N/A

Shifted from EQUIP 1

Mohd Ashraf 12 12 CS49.7

Graphic Designer/ Data Clerk 10

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

IC

N

N

Wazhma

N/A

Mudaser Aslami

N/A

Budget

SL No.

ID PKG. No. (New)

Duratio Name of Contract (BriefnDescription) (Month Planed s) 12

CS49.8

CS49.9

Graphic Designer/ Data Clerk 10

$0.00 $0.00

10

$0.00

$0.00

$0.00

$0.00

Graphic Designer/ Data Clerk 10

458

CS49.12

CS49.14

460

CS49.16

$0.00

$0.00

$0.00

$0.00 $0.00 $0.00

12

$0.00

$0.00

$0.00

$0.00

IC IC

IC IC

IC IC

IC

N

N N

N N

N

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09 01-Jan-10 01-Mar-09

31-Dec-09

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

01-Jan-10

31-Mar-10

22-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

01-Jan-10

31-Mar-10

N/A

31-Dec-09

Vacant

N/A

31-Mar-10

Zabeeh

5-Apr-08

30-Dec-08

01-Jan-09

28-Feb-09

$0.00

01-Mar-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

9

$90,000.00

$0.00

01-Jul-10

30-Apr-11

12

$0.00

$0.00

$0.00

$0.00

30-Dec-08 28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

01-Jan-10

31-Mar-10

$4,800.00

$4,800.00

1-Apr_10‘

31-Mar-11

12

$0.00

$0.00

2 Graphic Designer/ Data Clerk 10

$0.00

$0.00

$0.00

$0.00 $0.00

12

$0.00

$0.00

2

$0.00

$0.00

10 Graphic Designer/ Data Clerk 3

IC IC

IC IC

N

5-Apr-08 01-Jan-09

$0.00

$0.00

IC

N

N N

N

5-Apr-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

01-Jan-10

31-Mar-10

5-Apr-08

30-Dec-08

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

$9,600.00

$9,600.00

1-Apr_10‘

31-Mar-11

12

$0.00

$0.00

2 Graphic Designer/ Data Clerk 10

$0.00

$0.00

IC IC

N

N N

Name of Consultant

Progr ess of Proc urem ent as of

Fatima

$0.00

IC

N

Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00

10 Graphic Designer/ Data Clerk 3

IC

N

Planned/Actual Date

3

12

CS49.15

$0.00

$0.00

3

459

$0.00

$0.00

12

CS49.13

$0.00 $0.00

3

Graphic Designer/ Data Clerk 10

Snr.Graphic designer

$0.00

$0.00

Graphic Designer/ Data Clerk 10

CS49.11

$0.00

$0.00

12

457

$0.00 $0.00

3

3

CS49.10

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

22-Apr-08

30-Dec-08

01-Jan-09

28-Feb-09

01-Mar-09

31-Dec-09

01-Jan-10

31-Mar-10

$0.00

$0.00

3

$0.00

$0.00

12

$0.00

$0.00

IC

N

30-Dec-07

29-Dec-08

10 Graphic Designer/ Data Clerk 3

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

Nargis Omer Abdullah Khatera Nader Ali

N/A N/A

N/A N/A

N/A Hafizullah N/A

Shifted from EQUIP 1

Vacant Sultran Mahmood Hamatullah

N/A N/A

Shifted from EQUIP 1 N/A Suhail N/A

N/A N/A Hameedullah

Shifted from EQUIP 1 Parwaiz Qarizada Najibullah

Lal Muhammad

N/A N/A

N/A

Mohd Ali 12

461

$4,800.00

$4,800.00

12

$0.00

$0.00

IC

N

30-Dec-07

29-Dec-08

10 CS49.17Graphic Designer/ Data Clerk 3

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$4,800.00

$4,800.00

1-Apr_10‘

31-Mar-11

12

$0.00

$0.00

IC

N

30-Dec-07

29-Dec-08

Ataullah Hatami

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

mohd Ahsan

CS49.18

Shifted from EQUIP 1 N/A N/A

Mir Azam

Shifted from EQUIP 1

Graphic Designer/ Data Clerk 10

Remarks

N/A

SL No.

ID PKG. No. (New)

CS49.19

462

CS49.20

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

Graphic Designer/ Data Clerk 12

$0.00

$0.00

IC

N

30-Dec-07

29-Dec-08

10 Graphic Designer/ Data Clerk

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$0.00

$0.00

IC

N

30-Dec-07

29-Dec-08

10 Graphic Designer/ Data Clerk 3

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

$3,600.00

$3,600.00

1-Apr_10‘

31-Mar-11

Name of Consultant

Progr ess of Proc urem ent as of N/A

Ahmad Zamir

N/A

Vacant

N/A

Rahmatullah 12

463

464

465

CS49.21

10 Graphic Designer/ Data Clerk 3

CS49.22 CS49.23

CS49.24

CS49.25

CS49.26

$0.00

$0.00 $0.00

Graphic Designer/ Data Clerk 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

Nargis

N/A

Graphic Designer/ Data Clerk 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

vacant

N/A

10

$0.00

$0.00

IC

N

01-Mar-09

31-Dec-09

3 Graphic Designer/ Data Clerk

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$4,800.00

$4,800.00

1-Apr_10‘

31-Mar-11

10

$0.00

$0.00

01-Apr-09

03-Jan-10

Vacant

12

$4,800.00

$4,800.00

1-Apr_10‘

31-Mar-11

omar

10

$0.00

$0.00

01-Apr-09

31-Jan-10

vacant

$4,800.00

$0.00

1-Apr_10‘

31-Mar-11

Vacant

$145,200.00

$50,400.00

10 Subject Specialis-Quran Majid 3

12 2 Subject Specialis-Quran Majid 10 3

CS50.4

Subject Specialis-Quran Majid 12 Subject Specialis-Hadis Sharif 12 2

CS50.5

Subject Specialis-Hadis Sharif 12 2

CS50.6

Subject Specialis-Aqayed, 12 Adyan 2

CS50.7

Subject Specialis-Aqayed, 12 Adyan

IC

N

IC

N

$0.00

$0.00

3-Mar-08

30-Dec-08

$0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

CS50.8

N/A

N/A

Shifted from EQUIP 1 N/A

Shifted from EQUIP 1 N/A

N/A N/A Sayed Fazil Shah

Shifted from EQUIP 1

$12,000.00

$0.00

$0.00

31-Dec-07

30-Dec-08

$0.00

$0.00

01-Jan-09

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

16-Jan-08

30-Dec-08 Said Mohammad Aqa Hashimi N/A

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

IC IC IC

N

N N N

N/A Abdul Naser Shafiq

N/A

01-Jan-09

Said Mohammad Aqa Hashimi 28-Feb-09

20-Jan-08

30-Dec-08

Abdul Rafea Alimi N/A

01-Jan-09

28-Feb-09

Abdul Rafea Alimi

13-Jan-08

30-Dec-08

Abdul Manan

N/A

Abdul Manan IC IC

N

30-Dec-08

Farazulldin

01-Jan-09

28-Feb-09

Farazulldin

31-Dec-07

30-Dec-08

Mohammad Ibrahim N/A

01-Jan-09

28-Feb-09

Mohammad Ibrahim

24-Jan-08

30-Dec-08

$0.00

$0.00 $0.00

12

$0.00

$0.00

$0.00

$0.00

31-Dec-08

28-Feb-09

$0.00

$0.00

01-Mar-09

31-Dec-09

$0.00

$0.00

01-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

IC

N

16-Jan-08

$0.00

Subject Specialis-Arabic Language 3

Shifted from EQUIP 1

$12,000.00

2

10 467

waheedullah

sohail

12

CS50.3

31-Jan-10 31-Mar-10

Graphic Designer/ Data Clerk

12

CS50.2

01-Apr-09 01-Jan-10

Graphic Designer/ Data Clerk

Subtotal: Center for Excellence

CS50.1

N

Shifted from EQUIP 1

$0.00

12

466

IC

Remarks

N

12 $12,000.00

$12,000.00

12

$0.00

$0.00

13-Jan-08

30-Dec-08

2

$0.00

$0.00

01-Jan-09

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

IC

N

N/A

N/A N/A Asadullah

Shifted from EQUIP 1 N/A N/A

Budget

SL No.

468

ID PKG. No. (New)

CS50.9

Duratio Name of Contract (BriefnDescription) (Month Planed s) Subject Specialis-Sirat Nabi3

$0.00

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

$0.00

12 $12,000.00

469

CS50.10

Subject Specialis-Feqa

470

CS50.11

Contract Signing/ Date of Actual Date of Completion Contract Signing 01-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

Name of Consultant

Abdul Sabour

Progr ess of Proc urem ent as of

$0.00

$0.00

31-Dec-07

30-Dec-08

2

$0.00

$0.00

IC

N

01-Jan-09

28-Feb-09

10

$0.00

$0.00

01-Mar-09

31-Dec-09

3

$0.00

$0.00

01-Jan-10

31-Mar-10

1-Apr_10‘

31-Mar-11

N/A N/A Fazulullah Niazi

Shifted from EQUIP 1

$12,000.00

$12,000.00

12

$0.00

$0.00

20-Jan-08

30-Dec-08

2

$0.00

$0.00

31-Dec-08

28-Feb-09

10

$0.00

$0.00

1-Mar-09

31-Dec-09

3

$0.00

$0.00

1-Jan-10

N/A 31-Mar-10 Abdul Hakim Mujahid

1-Apr_10‘

31-Mar-11

IC

N

N/A

Shifted from EQUIP 1

Subject Specialis-Feqa 12

471

472

CS50.12

CS50.13

$18,000.00

$18,000.00

12

$0.00

$0.00

20-Jan-08

30-Dec-08

2

$0.00

$0.00

01-Jan-09

28-Feb-09

CS50.15

$0.00

$0.00

1-Mar-09

31-Dec-09

$0.00

$0.00

1-Jan-10

31-Mar-10

12

$18,000.00

$18,000.00

1-Apr_10‘

31-Mar-11

12

$0.00

$0.00

25-Dec-07

24-Dec-08

2

$0.00

$0.00

01-Jan-09

28-Feb-09

10

$0.00

$0.00

1-Mar-09

31-Dec-09

Subject Specialis-Usool Feqa 3

$0.00

$0.00

1-Jan-10

31-Mar-10 Mohd Nasim Qazizada

$9,600.00

$9,600.00

1-Apr_10‘

31-Mar-11

Subject Specialis-Usool Feqa 12

$0.00 $0.00

12

$0.00

$0.00

2

$0.00

$0.00

10

$0.00

$0.00

1-Mar-09

31-Dec-09

Subject Specialis-Usool Feqa 3

$0.00

$0.00

1-Jan-10

31-Mar-10

$12,000.00

$12,000.00

1-Apr_10‘

31-Mar-11

Subject Specialis-Usool Feqa 12

$0.00

$0.00

$0.00

$0.00

Subject Specialis-Pedagogy 12& Psychology $0.00

$0.00

2 CS50.18

$0.00

$0.00

Subject Specialis-Pedagogy 12& Psychology $0.00

$0.00

2 CS50.19

Subject Specialis-Hadis Sharif 12 2

CS50.20

Subject Specialis-Hadis Sharif 12 2

CS50.21

Subject Specialis-Hadis Sharif 12 2

CS50.22

Subject Specialis-Hadis Sharif 12 2

CS50.23

Subject Specialis-Aqayed &12Adyan 2

CS50.24

Subject Specialis-Aqayed &12Adyan

CS50.25

Subject Specialis-Aqayed &12Adyan

CS50.26

Subject Specialis-Aqayed &12Adyan

2 2 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

N

$0.00

2 CS50.17

IC

$0.00

12 CS50.16

N/A

3

2

473

N

10 Subject Specialis-Feqa

12 CS50.14

IC

IC

IC IC IC IC IC IC IC IC

N N

N N N N N N N N

Remarks

Shifted from EQUIP 1

$12,000.00

12

12

Subject Specialis-Feqa

Planned/Actual Date

N/A Habibullah Fouzi

Shifted from EQUIP 1 N/A N/A

Shifted from EQUIP 1

25-Feb-08

30-Dec-08

Hafizullah

25-Dec-08

28-Feb-09

Hafizullah

3-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

N/A N/A N/A

Pir Mohd Rohani

Shifted from EQUIP 1

3-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

Raqibullah

N/A

15-Jan-08

30-Dec-08

01-Jan-09

28-Feb-09

24-Jan-08

30-Dec-08Mohammad Shoaib Saiqal N/A

Fazlullah Momand N/A

01-Jan-09

28-Feb-09

5-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

25-Dec-07

31-Dec-08

01-Jan-09

28-Feb-09

13-May-08

30-Dec-08

01-Jan-09

28-Feb-09

31-Dec-07

30-Dec-08

01-Jan-09

28-Feb-09

18-Mar-08

30-Dec-08 Zakir Hussain ErshadN/A

Abdul Latif Nazari N/A Mohammd Ali Fetri N/A Hussain Ali Amini N/A Vacant

N/A

01-Jan-09

28-Feb-09

18-Mar-08

30-Dec-08 Mohammd Ali Qadam Ali Zada N/A

IC

N

01-Jan-09

28-Feb-09

IC

N

4-Apr-08

30-Dec-08 Mohammd Akram Aarefy N/A

01-Jan-09

28-Feb-09

IC

N

31-Dec-07

30-Dec-08

01-Jan-09

28-Feb-09

Vacant

N/A

SL No.

ID PKG. No. (New)

CS50.27 CS50.28

Budget Duratio Name of Contract (BriefnDescription) (Month Planed s) Subject Specialis-Feqa Subject Specialis-Feqa Subject Specialis-Feqa

CS50.29 Subject Specialis-Feqa CS50.31

Actual

12

$0.00

$0.00

2

$0.00

$0.00

12

IDA Proce Prior dure/ Revie Metho w d (Y/N) IC

4-Mar-08

30-Dec-08

01-Jan-09

28-Feb-09

12-Feb-08

30-Dec-08

01-Jan-09

28-Feb-09

Name of Consultant

$0.00 $0.00

12

$0.00

$0.00

12-Feb-08

30-Dec-08

2

$0.00

$0.00

01-Jan-09

10

$0.00

$0.00

1-Mar-09

28-Feb-09 Mohammd Hussain Farhang 31-Dec-09 N/A

3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

2 Subject Specialis-Usool Feqa 12 CS50.32

2 Subject Specialis-Usool Feqa 10

Subtotal:

$0.00

$0.00

$105,600.00

$105,600.00

IC IC

N

N N

Remarks

Abdul Shakor Waqif N/A

$0.00

IC

N

Contract Signing/ Date of Actual Date of Completion Contract Signing

Progr ess of Proc urem ent as of

$0.00

Subject Specialis-Usool Feqa 12

IC

N

Planned/Actual Date

Hasan Rezaee

N/A N/A

1-Jan-10

31-Mar-10

1-May-08

30-Dec-08

Khadija Muradi

01-Jan-09

28-Feb-09

Khadija Muradi

18-Mar-08 01-Jan-09

30-Dec-08 N/A 28-Feb-09Mohammd Ibrahim Shahab

1-Mar-09

31-Dec-09

N/A

N/A

General Education CS51.1 Subtotal:

Subject Editor-History

5

$0.00

$0.00

$0.00

$0.00

IC

N

1-Aug-08

30-Dec-08

Vacant

N/A

Senior Editor CS52.1

Subject Editor-Uzbaki Language 5

$0.00

$0.00

IC

N

1-Aug-08

30-Dec-08

Vacant

N/A

CS52.2

Subject Editor-Turkmani Language 5

$0.00

$0.00

IC

N

1-Aug-08

30-Dec-08

Vacant

N/A

CS52.3

Subject Editor-Dari Language 5

$0.00

$0.00

IC

N

1-Aug-08

30-Dec-08

Vacant

N/A

$0.00

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

Dropped

Subtotal: ResearchCenter CS 53.1

Research specialist Curriculum 10

$0.00

CS 53.2

Research specialist Curriculum 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

Dropped

CS 53.3

Research specialist Curriculum 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

Dropped

CS 53.4

Research specialist Curriculum 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

Dropped

CS 53.5

Research specialist Curriculum 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

Dropped

CS 53.6

Research specialist Curriculum 10

$0.00

$0.00

IC

N

01-Apr-09

31-Jan-10

$0.00

$0.00

01-Apr-09

31-Jan-10

Dropped vicant,amount reduced

$0.00

$0.00

01-Jan-10

31-Mar-11

1-Apr_10‘

31-Mar-11

01-Apr-09

31-Jan-10

01-Jan-10

31-Mar-11

1-Apr_10‘

31-Mar-11

01-Apr-09

31-Jan-10

01-Jan-10

31-Mar-10

01-Apr-09

31-Jul-09

01-Jan-10

31-Mar-11

1-Apr_10‘

31-Mar-11

01-Apr-09

31-Jan-10

01-Jan-10

31-Mar-10

01-Apr-09

31-Jan-10

10 474

CS 53.7

3 Research specialist Curriculum

IC

N

12

10 CS 53.8

3 Research specialist Curriculum

$9,000.00

$9,000.00

$0.00

$0.00

$0.00

$0.00

IC

N

12

CS 53.9

10 Research specialist Curriculum 3 10

475

CS 53.10

3 Research specialist Curriculum

$12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

N

IC

N

12

CS 53.11

476

CS 53.12

10 Research specialist Curriculum

10 Research specialist Curriculum

$12,000.00

$12,000.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

IC

IC

N

N

3

$0.00

$0.00

01-Jan-10

31-Mar-10

12

$12,000.00 $45,000.00

$12,000.00 $45,000.00

1-Apr_10‘

31-Mar-11

Subtotal: New Curriculum Lump Sum Contracts

Faiz Mohammad

Shifted from EQUIP 1

vicant,amount reduced

Rasol Zahir

Shifted from EQUIP 1

vicant,amount reduced Qalamuddin vicant,amount reduced

Haroon

Shifted from EQUIP 1

vicant,amount reduced Omar Gul Madani vicant,amount reduced

Haroon

Shifted from EQUIP 1

Name of Consultant

Progr ess of Proc urem ent as of

31-Dec-09

To be selected from Professionals following the Bank Guidelines.

done

31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

Development and Compilation Lumpsum of approx$0.00 27 Science , Mathematics $0.00 and Social IC Studies N 20-Jul-09 Text books and teachers 31-Dec-09 Guides

To be selected from Professionals following the Bank Guidelines

done

Translation of approx.44Lumpsum Teacher guide $0.00 books

31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

31-Dec-09

To be selected from Professionals following the Bank Guidelines

done

Budget

SL No.

ID PKG. No. (New)

CS 54.1

CS 54.2

CS 54.3

CS 54.4

CS 54.5

CS 54.6

CS 54.7

Subtotal:

Duratio Name of Contract (BriefnDescription) (Month Planed s)

Actual

IDA Proce Prior dure/ Revie Metho w d (Y/N)

Planned/Actual Date Contract Signing/ Date of Actual Date of Completion Contract Signing

$0.00 IClanguage N books 20-Jul-09 Development and Compilation Lumpsum of approx.32 $0.00Primary and High School third

Development and Compilation Lumpsum of approx.21 $0.00Secondary School $0.00 third language IC books N 20-Jul-09

Development and Compilation Lumpsum of approx$0.00 28 Dari ,Pashto and $0.00 Jafari Text books IC and N teachers 20-Jul-09 Guides

$0.00 N 20-Jul-09 Development and Compilation Lumpsum of approx$0.00 31 Islamic Education Text booksIC and teachers Guides

Translation of approx.63Lumpsum Text Books of all $0.00 classes

$0.00

Grand Total: (TED+ EQUIP+Curriculum) $6,913,210.00

$0.00

$0.00

IC

IC

N

N

20-Jul-09

20-Jul-09

$0.00

$5,727,569.00

Legends : rose color

light yellow Lime (green)

already existing in equip II

Newly proposed and approved by WB

already existing in equip II

Remarks

SL No.

Contract Package Number*

No of Rooms to be Built

Name of School District

2

1

TTC24.1

Urozgan

TTC-CompassUrozgan

Trinkot

2

TTC20.1

Kapisa

TTC-Learning Space

3

TTC3.1

Bamyan

4

TTC5.1 TTC7.1

3

4

Estimation Cost

Revised Estimation Cost in USD

Actual Cost in Afghani

Type of Construction

IDA Prior Review (Y/N)

Type of Contract

Responsible Agency

Remarks Date of Delivery/ Completion

Bid opening date

Village 5

1

5

Planned/Actual Date

Location Province

6

7

8

9

10

11

12

14

13

15

Complete Campus

$

1,100,000.00 $

1,100,000.00 Af

- RCC

NCB

Yes

MoE

Aug-08

Feb-09

Mahmoud Raqi Center

10

$

140,000.00 $

140,000.00 Af

8,091,074 RCC

NCB

N

MoE

08-Jul-08

Mar-09

M/s Bahar Kapisa

TTC-Learning Space

Bamyan City

Center

10

$

140,000.00 $

140,000.00 Af

9,304,585 RCC

NCB

N

MoE

08-Jul-08

Mar-09

M/s Abdul Nazeef MASOOD

Dai-Kundi

TTC-Learning Space

Nilli

Center

10

$

140,000.00 $

140,000.00 Af

7,510,021 RCC

NCB

N

MoE

25-Jun-08

Mar-09

M/s Pesh Kadam CC

Ghor

TTC-Learning Space

Chekhcharan

Center

10

$

140,000.00 $

160,000.00 Af

- RCC

NCB

N

MoE

25-Dec-09

Oct-09

Total

Center

$

1,660,000.00

$

1,680,000.00

5 Grand Total

$ 1,680,000.00

Af

24,905,680

Ref. No.

Contract (Description)

Quantity

Estimated Cost (Total lot cost) in US$

1

2

3

4

Desk top Computer + UPS(IncludesTED)

70

$80,500.00

Printers

50

$25,000.00

Flash Desk 1 GB

130

$4,550.00

Photocopier Machine (Includes TED)

35

$122,500.00

Estimated package cost in US$

Procurement Method

5

6

$110,050.00

ICB

Domestic Review by Prequalificat Preference Bank (Prior / Expected Bid-Opening Date ion (yes/no) (yes/no) Post) 7

8

No

No

No

No

No

No

No

No

9

10-Jan-00

Comments

Remarks

11

12

School Kabul Province G 1.2

G 1.3

Sub Total

$122,500.00

NCB

YES

Procurement to be Bids are due for opening on 29 Procurement done through clubbed with G-2.1,GMarch 2009 ICB G-38 3.1,G-4.1 and G-4.3

No

15th September 2008

Procurement to be clubbed with 3.2&4.2

Procurement done through ICB G-052

$232,550.00

EMIS Requirements

G 2.1

Laptop

6

$7,000.00

No

No

Server Dual processor

1

$20,000.00

No

No

4 KVA UPS with 7 KVA

1

$8,000.00

No

No

1

$10,000.00

No

No

Laser Printer A4 (Black and White, Double side, sorting and stapler) Laser Printer A3 (Color)

$100,000.00

ICB

1

$15,000.00

No

No

HP Plotter A 1

1

$20,000.00

No

No

HP Plotter A 0

1

$20,000.00

No

No

No

No

No

No

No

No

No

No

No

No

Sub Total

YES

Procurement to be Bids are due for opening on 29 Procurement done through clubbed with G-1.2,GMarch 2009 ICB G-38 3.1,G-4.1 and G-4.3

YES

Procurement to be Bids are due for opening on 29 clubbed withG- 1.2GMarch 2009 2.1,G-4.1 and G-4.3

Procurement done through ICB G-38

Bids not yet called for want of funds

Procurement done through ICB G-052

$100,000.00

EQUIP + GMU Requirments

G 3.1

G 3.2

Laptop(Includes TED)

15

$17,500.00

Laser Printer Color A3

1

$15,000.00

IT Equipment

Lot

$10,000.00

Laser Printer 2015n

15

$8,250.00

Photocopy machine

2

$14,000.00

Sub Total

$64,750.00

$50,750.00

$14,000.00

ICB

NCB

No

Procurement to be clubbed with 1.3&4.2

Contract (Description)

Ref. No.

Quantity

Estimated Cost (Total lot cost) in US$

Estimated package cost in US$

Procurement Method

Domestic Review by Prequalificat Preference Bank (Prior / Expected Bid-Opening Date ion (yes/no) (yes/no) Post)

Comments

Remarks

NEW REQUIREMENTS-MOE-PROCUREMENT DEPARTMENT Procurement to be Bids are due for opening on 29 Procurement done through clubbed with G-1.2,GMarch 2009 ICB G-38 2.1,G-3.1 and G-4.3

G 4.1

Laser Printer Color A3

1

$15,000.00

$15,000.00

ICB

No

No

YES

G 4.2

Heavy Duty Photocopy machine

1

$10,000.00

$10,000.00

NCB

No

No

No

G 4.3

Laser Printer A4 (Black and White, Double side, sorting and stapler)

1

$10,000.00

$10,000.00

ICB

No

No

YES

hp 9250c digital sender

2

$14,000.00

$14,000.00

Westren Digital - Hard Drive

4

$1,500.00

$1,500.00

NCB

No

No

No

Server Computer

1

$8,000.00

$8,000.00

$0.00

NCB

No

No

No

09-Jun-10

$1,000.00

NS

No

No

No

01-Jul-09

$0.00

NS

No

No

No

01-Jul-09

NS

No

N

N

M

G 4.4

Sub Total

G 5.1

55

$0.00

Desktop Computer+UPS

30

$0.00

Server Computer (Power Edge 840)

1

$0.00

Stablizer

20

$0.00

Printer

20

$0.00

Scanner

10

$0.00

Flash memory 1 GB

50

$0.00

Canon EOS 50D SLR Digital Camera

1

$1,000.00

Digital Camera (one per province)

35

$0.00

Laptop bag.case

50

$0.00 $0.00

Office Desk+Weeling Chair

60

$15,000.00

Meeting table+Chairs Big size

3

$3,000.00

Filling cabinet

90

$7,860.00

Sub Total

New Item Added

$1,000.00

Sub Total

G 5.4

Procurement to be Bids are due for opening on 29 Procurement done through clubbed withG- 1.2,GMarch 2009 ICB G-38 2.1,G-3.1 and G-4.1

$0.00

Sub Total G 5.3

Procurement to be Procurement done through clubbed with G-3.2&GICB G-052 1.3

$35,000.00

Laptop Computer

Sub Total

G 5.2

Bids not yet called for want of funds

$25,860.00

Procurement Done

Contract (Description)

Ref. No.

G5.5

Quantity

Estimated Cost (Total lot cost) in US$

Air Conditionar

5

$0.00

Gas Heater

15

$0.00

Thermoses 3 lit

50

$1,500.00

Sub Total G 5.6

Certificate Printing

G 5.7

TextBooks Printing in two Languages for Teacher Training Program

Estimated package cost in US$

Procurement Method

$1,500.00

NS

Domestic Review by Prequalificat Preference Bank (Prior / Expected Bid-Opening Date ion (yes/no) (yes/no) Post) No

No

No

Comments

Remarks

01-Jun-09 N

$1,500.00 400000

$0.00

$0.00

NS

No

No

No

01-Aug-09

35 Dozen

$0.00

$0.00

ICB

No

Yes

YES

01-Jun-09

Package

$0.00

$0.00

ICB

No

Yes

Yes

01-Jul-09

$0.00

$0.00

NCB

No

No

No

10-Jul-10

New Items Added

NCB

No

No

No

10-Jul-10

New Items Added

NCB

No

No

No

10-Jul-10

New Items Added

ICB

No

No

Yes

10-Oct-10

New Items Added

01-Jul-09

Sub Total

NEW EMIS REQUIREMENTS G 6.1

Network Infrastructure Sub Total

G 6.2

Laptop computers

10

$15,000.00

$0.00

Printing Materials

1

$3,600.00

$0.00

Furniture

1

$15,000.00

$0.00

Projector

1

$0.00

$0.00

Scanner Heavey duty

1

$0.00

$0.00

Server

3

$0.00

$0.00

$33,600.00

$0.00

Sub Total

TED Requirements G 6.3

G 6.4 G 6.5

Furniture for TTC

1

$679,028.93

$679,028.93

Linbraries for TTC

1

$1,093,690.85

$1,093,690.85

Science laboratories for TTC

10

$800,084.00

$800,084.00

Computer labs for TTC Sub Total

10

$1,277,850.00

$1,277,850.00

$3,850,653.78

$3,850,653.78

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$2,900,000.00

$0.00

$2,900,000.00

$0.00

Anti Virus Websence Softwares Printing of Curriculum Sub Total

NEW EQUIP REQUIREMENTS G 7.1

G 7.2

Digital Cameras

2

$1,000.00

$7,000.00

NS

N

Yes

Yes

Videp Cameras

1

$1,000.00

$1,000.00

NS

N

Yes

Yes

Projector

1

$5,000.00

$5,000.00

NS

N

Yes

Yes

Projector

2

$10,000.00

$0.00

N

Yes

Yes

15-Aug-10

Laptop Computers

9

$13,500.00

$0.00

N

Yes

Yes

15-Aug-10

HP Lserjet Printer

2

$11,000.00

$0.00

N

Yes

Yes

15-Aug-10

Photocopier Machiene

1

$5,000.00

$0.00

N

Yes

Yes

15-Aug-10

Scanner

1

$200.00

$0.00

N

Yes

Yes

15-Aug-10

UPS

4

$800.00

$0.00

N

Yes

Yes

15-Aug-10

Digital Cameras

5

$2,000.00

$0.00

N

Yes

Yes

15-Aug-10

Super Custom Mini Van

4

$80,000.00

$0.00

NCB

N

Yes

Yes

15-Aug-10

Air Conditioning

3

$1,500.00

$0.00

NS

N

Yes

Yes

15-Aug-10

$103,000.00

$103,000.00

ICB

N

Yes

Yes

01-Jun-09

$103,000.00

$103,000.00

Sub Total

NCB

Procurement Done

New Items Added

$131,000.00

CURRICULUM G8.1

Laptop Computer

103 Sub Total

To be clubbed with G 5.1 and Procured

Ref. No.

22

Contract (Description)

TOTAL GOODS

Quantity

Estimated Cost (Total lot cost) in US$

$7,478,913.78

Estimated package cost in US$

Procurement Method

Domestic Review by Prequalificat Preference Bank (Prior / Expected Bid-Opening Date ion (yes/no) (yes/no) Post)

Comments

Remarks

Planned/Actual Date

SL No.

ID/ PKG No.

Name of Contract (Brief Description)

1

2

3

1

CA 1.1 Scholarship for girls

2

CA 1.2

3

Duration ( Months)

Estimated Cost

4

5

Actual Contract Price

5

48

$

10,000,000.00

District Teacher Tranining Teams-Pacakage 1

30

$

9,500,000.00

CA 1.3

District Teacher Tranining Teams-Pacakage 2

30

$

10,987,000.00

4

CA 1.4

District Teacher Tranining Teams-Pacakage 3

30

$

2,631,000.00

5

CA 1.5 Principals Training

30

$

1,500,000.00

$

6

CA1.6

Third Party Evaluator for District 30 Teacher Training

$

500,000.00

$

$

35,118,000.00

$

$

1,000,000.00 $

$

500,000.00 $

Total:

External Evaluation of IMPACT

9

CA1.7

10

CA1.8 EMIS Development

11

CA1.9 TTC Teachers tranings

12

CA1.10

8

Monitoring and Management team consultancy

GRAND TOTAL:

Procedure/ IDA Prior Method Review (Y/N)

$

$

6

7

Expected proposals submission date

Date of Completion

8

9

Name of Consultant

Progress of Procurement as of

Remarks

10

11

12

SSS

Y

Proposal due for opening on 13th May 08

Dec-12

GTZ

FBS

Y

Proposals Opened on 17 th march2008

Jun-11

Just for Afghan Capacity and Contract Knowledge (JACK), in joint Signed venture with Save the Children

FBS

Y

Proposals Opened on 17 th march2008

Jun-11

ADA & Partners

Contract Signed

FBS

Y

Proposals Opened on 28th April 08

Jun-11

Save the Children & others

Contract Signed

FBS

Y

Merged with DT3 Packages

QCBS

Y

15th Nov 10

procurement process to begin

$

500,000.00

-

QCBS

Y

15th Nov 10

procurement process to begin

$

200,000.00 Dropped

-

QCBS

Y

15th Nov 10

procurement process to begin

$

300,000.00 Dropped

2,000,000.00

20,569,000.00

22,569,000.00

Contract Signed

Dropped

22,569,000.00

12

$

4,870,000.00

$

1,020,000.00

QCBS

Y

20-Mar-11

New Trainning Purposed

12

$

740,000.00

$

740,000.00

QCBS

Y

20-Mar-11

New Trainning Purposed

$

36,618,000.00

$

22,569,000.00

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.