Boiler Refractory Dryout (Courtesy of Rentech Boiler Systems). Refractory Dry-Out Procedure. The refractory material was

4 downloads 15 Views 17KB Size

Recommend Stories


refractory
Life is not meant to be easy, my child; but take courage: it can be delightful. George Bernard Shaw

Closed Merged Banks .pdf
If you feel beautiful, then you are. Even if you don't, you still are. Terri Guillemets

Refractory
Don't ruin a good today by thinking about a bad yesterday. Let it go. Anonymous

refractory acute
And you? When will you begin that long journey into yourself? Rumi

on boiler
Every block of stone has a statue inside it and it is the task of the sculptor to discover it. Mich

Chemical composition - CFBC Boiler Manufacturer [PDF]
Jul 3, 2017 - D1062 pdf editor. Cabelas virtuais catolicas zenaida. Section 2.5, the fundamental theorem of algebra. Hry na psp na stiahnutie zdarma. Dell inspiron 17r special edition 9 cell battery. Tr9130 dijual ...... indikasi tonsillectomy scribd

Uber-Boiler
If you feel beautiful, then you are. Even if you don't, you still are. Terri Guillemets

Chemical compound - CFBC Boiler Manufacturer [PDF]
Jul 3, 2017 - Defineiones de shine segun distintos autores. Rumor girl 3×04 series ideas. Revolver cannabis 1 en un millon .... 500 channels simulation dream game. Por isso gente acabou livro pdf sobre. Capacitor circuit delay ...... ulcera infectad

Boiler and boiler water treatment system
There are only two mistakes one can make along the road to truth; not going all the way, and not starting.

Packaged Boiler
Every block of stone has a statue inside it and it is the task of the sculptor to discover it. Mich

Idea Transcript


Boiler Refractory Dryout (Courtesy of Rentech Boiler Systems) Refractory Dry-Out Procedure The refractory material was not normally thermally cured at the factory. It is not uncommon for moisture to be absorbed by the refractory during final stages of in-shop fabrication, transit to the job site, and before the upstream combustion products are first passed through the unit. Therefore, residual moisture and any absorbed moisture must be removed after installation but prior to commencement of start-up operations. Otherwise, trapped moisture will steam, causing cracking, and in many cases, the refractory will separate from the metal in large pieces. As a minimum, follow these steps to protect the refractory from damage. 1. Ideally, the refractory lining should be air-set in dry air, preferably not less than 70°F for at least 24 hours. 2. Using treated water (normal boiler feedwater) fill the unit to approximately the midpoint of the gauge glass, which is normal water level. 3. Verify that the feedwater system is operational. 4. Warm the furnace and gas chamber of the unit to 200°F and maintain that temperature for six hours. 5. Raise the inlet gas temperature at 100°F per hour to 500°F, while venting the generated steam to atmosphere. The valve positions are similar to the boil-out condition given in the "Summary of Valve Positions". 6. Hold the furnace at this temperature for a minimum of two hours. 7. Continue to raise the inlet gas temperature at 100°F per hour to 1,000°F. 8. Hold the furnace at this temperature to the anticipated operating level at a rate not exceeding 50°F per hour. 9. Elevate the furnace at this temperature to the anticipated operating level at a rate not exceeding 50°F per hour. 10. Hold the furnace at this temperature for a minimum of two hours. 11 Remove the heat source and allow the refractory to cool by natural radiation. Do not introduce cold air with a fan. BACK TO BOILER PAGE

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.