818 S. FLORES ST.
SAN ANTONIO, TEXAS 78204
www.saha.org
Procurement Department
ADDENDUM # 1 To: 1201-912-26-3725 RFP for: Installation of Walking & Biking Trails at Cassiano Homes & Lincoln Heights The opening date and time are changed to February 7, 2012 at 11:00 a.m. The following questions have been asked: Question 1: Answer 1:
Does Lincoln Heights have two Fitness Stations with three (3) pieces of equipment in each one? No - Lincoln will have two "stations" only. One station will have 2 pieces of equipment: The Horizontal Bar and Parallel Bars. The other station will have only the Sit-Up Bench.
Question 2:
Does Cassiano Homes have one Fitness Station with four (4) pieces of equipment?
Answer 2:
Yes - Cassiano will have one larger "station". That station will have 4 pieces of equipment grouped together in one area. The equipment will be the Push-Up Bar, SitUp Bench, Horizontal Bar and Parallel Bars.
Question 3: Answer 3:
The sub-base is crushed limestone- 3/4 to dust is fine? Yes.
Question 4: Answer 4:
Stabilizer is not required with the DG? Correct, stabilizer is not required.
Question 5:
On the site maps you give linear footage and square footage. Is the linear for the trail only and the square footage for the exercise sites or is the linear incl in the total square footage? The linear footage shown on the site maps indicates the approximate trail length. The square footage shown on the site map indicates approximate area for both; trails and the exercise areas. As stated in the scope of work, contractor shall field verify all dimensions.