FINDING: Transformer Oil Test report is unavailable. RECOMMENDATION: Check the transformer oil condition by performing o

0 downloads 6 Views 1MB Size

Recommend Stories


ONTARIO Electrical Safety Report
The greatest of richness is the richness of the soul. Prophet Muhammad (Peace be upon him)

Electrical Inspection Request Form
Be who you needed when you were younger. Anonymous

electrical safety
Just as there is no loss of basic energy in the universe, so no thought or action is without its effects,

Electrical Inspection Agencies
Kindness, like a boomerang, always returns. Unknown

electrical inspection agencies
Silence is the language of God, all else is poor translation. Rumi

Final Electrical Inspection Checklist
When you do things from your soul, you feel a river moving in you, a joy. Rumi

Electrical Inspection Agencies
Never let your sense of morals prevent you from doing what is right. Isaac Asimov

Electrical Inspection Agencies
Where there is ruin, there is hope for a treasure. Rumi

Approved Electrical Inspection Agencies
Never wish them pain. That's not who you are. If they caused you pain, they must have pain inside. Wish

electrical safety
If you are irritated by every rub, how will your mirror be polished? Rumi

Idea Transcript


ELECTRICAL SAFETY INSPECTION REPORT A & B OUTERWEAR LTD. Plot # 29-30, CEPZ, Chittagong, Bangladesh.

Factory List: 1.

A & B Outerwear Ltd.

Inspected by: Al-Amin Report Generated by: Al-Amin

Inspected on March 7th 2015

SUMMARY The A & B Outerwear Ltd. factory is established in owned three building and four shed. Building-1 is three storied; Building-2 is two storied and building three is one storied. Building-1 was constructed in 2010 and production started in same year. Building-2 was constructed in 2011 and production started in same year. Building-3 was constructed in 2011. The factory had approximately 1114 workers. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which would be further dealt with as part of follow-up inspections. Table below summarizes the major electrical safety issues Recommendations have been provided to address each issue.

identified

during

the

inspection.

The implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design/installation constraints, shall be submitted to the Accord for an approval.

A & B Outerwear Ltd.

Page 2 of 12

FINDINGS AND RECOMMENDATIONS

FINDING NO: E- 1 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Thermographic scanning of the entire electrical system has not been performed. RECOMMENDATION: Thermographic scanning of the entire electrical system must be performed twice in a year. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

FINDING NO: E-2 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Electrical Single Line Diagram (SLD) is unavailable. RECOMMENDATION: Have a qualified engineer to create an as-built electrical SLD, mentioning all the required information, and get it reviewed by Accord. PRIORITY: P2 REMEDIATION TIMEFRAME: 12 WEEKS

FINDING NO: E- 3 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Insulation resistance test of electrical equipment is not performed. RECOMMENDATION: Insulation resistant test of all the cables must be performed once every 2 year cycle and recorded (this must require a complete power shut off). PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

A & B Outerwear Ltd.

Page 3 of 12

FINDING NO: E- 4 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Electric safety program is not initiated. RECOMMENDATION: Electrical safety training and awareness program for the electrical personnel and workers must be initiated and recorded. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

FINDING NO: E- 5 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Factory does not have maintenance record. RECOMMENDATION: Maintenance Manager or Safety Officer must keep accurate records and ensure that they reflect actual factory day to day operations. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

FINDING NO: E- 6 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Transformer Oil Test report is unavailable. RECOMMENDATION: Check the transformer oil condition by performing oil test, this must be done twice a year and recorded. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

FINDING NO: E- 7 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Earth Pit resistance record is unavailable. RECOMMENDATION: Record earth pit resistances for all the earth pits, and do it once a year. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

A & B Outerwear Ltd.

Page 4 of 12

FINDING NO: E-8 CATEGORY: DESIGN, DRAWINGS & RECORDS FINDING: Instruction for CPR (Cardiopulmonary Resuscitation) or Electrical shock restoration is not present. RECOMMENDATION: Hang this first aid and CPR instructions near all electrical equipment (LT panel, MDB, FDB, DB, SDB) on a visible location. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

FINDING NO: E- 9 CATEGORY: CABLE & CABLE SUPPORTS FINDING: Wire is used in place of DO fuse and HT cables dropping from 11kV OH line not supported firmly to the pole. RECOMMENDATION: Replace the wire with standard DO fuse and the HT cable dropping from 11kV pole must be firmly fixed to the pole with supports and clamps. PRIORITY: P2 REMEDIATION TIMEFRAME: 6 WEEKS

HT cable protected by DO fuse, dropping from pole.

FINDING NO: E- 10 CATEGORY: TRANSFORMER ROOM FINDING: No separation between LT panels and HT units (transformer, HT switchgear). Recommendation: Make a brick built separation between LT and HT units; ensure that after making separator you have adequate ventilation (cross ventilation) and working clearance around each electrical equipment. PRIORITY: P3 REMEDIATION TIMEFRAME: 16 WEEKS

A & B Outerwear Ltd.

Page 5 of 12

315 kVA transformer in substation.

FINDING NO: E- 11 CATEGORY: TRANSFORMER ROOM FINDING: HT cable laid over the LT cables. RECOMMENDATION: Cables of different voltage levels must be separated in different trays. PRIORITY: P2 HT and LT cable.

REMEDIATION TIMEFRAME: 6 WEEKS

FINDING NO:

E- 12

CATEGORY: TRANSFORMER ROOM FINDING: No space around transformer for performing maintenance work. Recommendation: Ensure a minimum 1.07m working space around the transformer. PRIORITY: P2 REMEDIATION TIMEFRAME: 16 WEEKS

FINDING NO:

500 kVA transformer in substation.

E- 13

CATEGORY: TRANSFORMER ROOM FINDING: Oil leakage transformer.

has

been

observed

from

RECOMMENDATION: Stop oil leakage from transformer and keep top of transformer clean. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

A & B Outerwear Ltd.

Page 6 of 12

500 KVA transformer

FINDING NO:

E- 14

CATEGORY: TRANSFORMER ROOM FINDING: Silica gel inside the breather is replaced by pebbles. Recommendation: Remove the pebbles from breather and replace it by silica gel after thorough cleaning of breather. The oil cup attached to breather must be filled by clean transformer oil. PRIORITY: P1 REMEDIATION TIMEFRAME: 6 WEEKS

FINDING NO:

Transformer breather

E- 15

CATEGORY: EARTHING SYSTEM FINDING: Impedance of main earthing of factory electrical system is very high (255.7 ohms) Recommendation: Check properly may be loose connection is one of the cause. PRIORITY: P2 REMEDIATION TIMEFRAME: 6 WEEKS

Main earthing busbar.

FINDING NO: E- 16 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: No base plate and compression gland, excessive dust, lint and debris deposit underneath the panel (typical issue). RECOMMENDATION: Dust, lint and debris must be thoroughly cleaned to avoid fire hazard. Provide covers (of noncombustible material) if any additional gap remains after installing cable glands. PRIORITY: P1 REMEDIATION TIMEFRAME: 6 WEEKS

A & B Outerwear Ltd.

Page 7 of 12

LT panel.

FINDING NO:

E- 17

CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Cable connected MCCB without Lug. (Typical issue) Recommendation: Cable must be connected to MCCB by cable lug. PRIORITY: P1 REMEDIATION TIMEFRAME: 6 WEEKS

FINDING NO:

MCCB inside the LT panel.

E- 18

CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Cable connected to busbar without lug (typical). Recommendation: Cables must be connected to busbar with proper size of cable lug. PRIORITY: P1 REMEDIATION TIMEFRAME: 6 WEEKS

FINDING NO:

Bus bar inside the LT panel

E- 19

CATEGORY: EARTHING SYSTEM FINDING: Earthing system of LT panel is not properly done. (Typical) Recommendation: Every panel must be used earthing busbar. PRIORITY: P1 REMEDIATION TIMEFRAME: 6 WEEKS

A & B Outerwear Ltd.

Page 8 of 12

Inappropriate earthing

FINDING NO: E- 20 CATEGORY:CABLE & CABLE SUPPORTS FINDING: Cable passes through wall are not protected and not supported. RECOMMENDATION: Cable must be supported by cable tray and remaining gap is must be sealed. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

Distribution cables

FINDING NO: E- 21 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Phase barrier/separator not installed (typical issue). RECOMMENDATION: Put a purposely made phase separator (rubber type) between two phases; also terminate cables by proper sized cable lugs and cover cable lugs by heat shrink. PRIORITY: P2 REMEDIATION TIMEFRAME: 8 WEEKS

Cables terminating at MCCB in panel on production floor.

FINDING NO: E- 22 CATEGORY: CABLE & CABLE SUPPORTS FINDING: Cables are covered by lint and dust.

RECOMMENDATION: Thoroughly clean the combustible materials. Suggested to include in routine cleanliness/maintenance work. PRIORITY: P1 REMEDIATION TIMEFRAME: 8 WEEKS

A & B Outerwear Ltd.

Page 9 of 12

Distribution cables

FINDING NO: E- 23 CATEGORY: WIRINGS FINDING: Cable duct/channels have excessive lint/dust (typical issue). RECOMMENDATION: Clean all the cable channels/ducts and cover them with checkered/perforated plates. PRIORITY: P1 REMEDIATION TIMEFRAME: 8 WEEKS

Cable raceways in production floor.

FINDING NO: E- 24 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Hot spots detected at termination point of MCCB due to loose connection. (72 degree) RECOMMENDATION: Arrange periodic inspection & thermal scan to identify the overloading, loose connection, unbalanced load which may cause the excessive heat-rise and take action immediately PRIORITY: P1 REMEDIATION TIMEFRAME: 4 WEEKS

Hot spot inside distribution board.

FINDING NO: E- 25 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Multiple cable termination at a terminal of MCCB (typical issue). RECOMMENDATION: Multiple cables connecting at a MCCB terminal must be disconnected. Existing multiple circuits may be distributed through bus bars. PRIORITY: P2 Cable terminating at MCCB in panel. REMEDIATION TIMEFRAME: 2 WEEKS

A & B Outerwear Ltd.

Page 10 of 12

FINDING NO: E- 26 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Cables inside distribution board is disorganized. RECOMMENDATION: Organize all the power cables securely and neatly inside distribution board to prevent from electrical hazards. PRIORITY: P1 REMEDIATION TIMEFRAME: 6 WEEKS

Panel on ground floor.

FINDING NO: E- 27 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Power cables are bent excessively (typical issue). RECOMMENDATION: Avoid power cable bending in electrical system; in unavoidable case bend cables without any stress but not less than 135 degrees. PRIORITY: P2 REMEDIATION TIMEFRAME: 6 WEEKS

Cable terminating at MCCB inside distribution board.

FINDING NO: E- 28 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: Multiple cables connected in the busbar through a single lug (typical issue). RECOMMENDATION: Every cable must be connected to the busbar through its own single lug (one lug per cable). PRIORITY: P1 REMEDIATION TIMEFRAME: 4 WEEKS

A & B Outerwear Ltd.

Page 11 of 12

Wires terminating at busbar inside panel.

FINDING NO: E- 29 CATEGORY:DISTRIBUTION BOARD & PANEL FINDING: MCCB without enclosure and mounted on wooden plank. RECOMMENDATION: Remove the wooden plank. Provide standard MCCB protective enclosures. PRIORITY: P2 REMEDIATION TIMEFRAME: 4 WEEKS

A & B Outerwear Ltd.

Page 12 of 12

Cables terminating at MCCB.