Idea Transcript
MS Excel Spreadsheet (/) / EXCEL (HTTP://MSEXCELSPREADSHEET.COM/EXCEL/EXCEL) EXCEL-VBA (HTTP://MSEXCELSPREADSHEET.COM/EXCEL/EXCEL-VBA) USER-DEFINED-FUNCTIONS (HTTP://MSEXCELSPREADSHEET.COM/EXCEL/USER-DEFINED-FUNCTIONS) VBA (HTTP://MSEXCELSPREADSHEET.COM/EXCEL/VBA)
/ Excel UDF weighted RANDBETWEEN()
EXCEL UDF WEIGHTED RANDBETWEEN()
Search for...
GO!
Interesting Posts
(http://msexcelspreadsheet.com/excel-udf-weighted-randbetween.html) Well not really RANDBETWEEN() . I’m trying to create a UDF to return the index of a number within an array, where the larger the number the more likely it is to be chosen. I know how to assign probabilities to random numbers in a worksheet (i.e. using MATCH() on the sum of the probabilities, there’s plenty of stuff on SO explaining that), but I want a UDF because I’m passing a special input array into the function – not just a selected range. International characters with Java (http://msexcelspreadsheet.com/international-characters-with-java.html)
I don't want my Excel Add-In to return an array (instead I need a UDF to change other cells) (http://msexcelspreadsheet.com/i-dont-want-my-exceladd-in-to-return-an-array-instead-i-need-a-udf-to-changeother-cells.html)
Spray send xls file to client (http://msexcelspreadsheet.com/spray-send-xls-file-to-client.html)
Creating Quintile (Percentile) Array and need to switch corresponding numbers
Range limit conundrum (http://msexcelspreadsheet.com/range-limit-conundrum.html)
(http://msexcelspreadsheet.com/creating-quintile-
Microsoft.Office.Interop.Excel.dll not included in Build Folder (http://msexcelspreadsheet.com/microsoft-office-interop-excel-
percentile-array-and-need-to-switch-corresponding-
Dynamic referencing the UsedRange in VBA (http://msexcelspreadsheet.com/dynamic-referencing-the-usedrange-invba.html)
dll-not-included-in-build-folder.html)
numbers.html)
Get the current Workbook Object in C# (http://msexcelspreadsheet.com/get-the-current-workbook-object-in-c.html) My issue is, the weighting is off, numbers later on in the array are more likely to be returned than those earlier in the array and I can’t see where in my code I’ve gone wrong. Here’s the UDF so far:
Add a column in excel sheet using powershell
Public Function PROBABLE(ParamArray inputArray() As Variant) As Long
(http://msexcelspreadsheet.com/add-a-column-in-excel-
'Takes a set of relative or absolute probabilities and ranks a random number within them
sheet-using-powershell.html)
Application.Volatile (True) Dim outputArray() As Variant
Dim rankNum As Single
XSSF (POI) – Adding “formula” column to pivot table
Dim runningTot As Single
(http://msexcelspreadsheet.com/xssf-poi-adding-
Dim scalar As Single
formula-column-to-pivot-table.html) ''''' 'Here I take inputArray() and convert to outputArray(),
How to put a tooltip on a userdefined function
'which is fed into the probability code below '''''
(http://msexcelspreadsheet.com/how-to-put-a-tooltip-onscalar = 1 / WorksheetFunction.Sum(outputArray)
a-user-defined-function.html)
rankNum = Rnd() runningTot = 0
For i = 0 To UBound(outputArray)
InvalidFormatException in Java POI
runningTot = runningTot + outputArray(i)
(http://msexcelspreadsheet.com/invalidformatexception-
If runningTot * scalar >= rankNum Then
in-java-poi.html)
PROBABLE = i + 1 Exit Function
Importing data from many excel workbooks and sheets into a single workbook/table
End If Next i
End Function
(http://msexcelspreadsheet.com/importing-data-from-
The function should look at the relative sizes of the numbers in outputArray() and pick randomly but weighted towards the larger numbers. E.g. outputArray() of {1,0,0,1} should assign probabilities respectively of {50%,0%,0%,50%} However when I tested
many-excel-workbooks-and-sheets-into-a-singleworkbooktable.html)
that outputArray() , for 1000 samples and 100 iterations, and graphed how frequently item 1 or item 4 in the array was
npoi vertical alignment center
returned, I got this result:
(http://msexcelspreadsheet.com/npoi-verticalalignment-center.html)
Open Word Document and Bring to Front (http://msexcelspreadsheet.com/open-word-documentand-bring-to-front.html)
Insert a Row in Excel Using Java Apache POI (http://msexcelspreadsheet.com/insert-a-row-in-excelusing-java-apache-poi.html)
Approximately 20%:80% distribution. Plotting {1,1,1,1} (all should have equal chance) gave a 10%:20%:30%:40% distribution I know I’m missing something obvious but I can’t tell what, any help?
UPDATE Some people were asking for the complete code, here it is. Public Function PROBABLE(ParamArray inputArray() As Variant) As Long 'Takes a set of relative or absolute probabilities and ranks a random number within them Application.Volatile (True) 'added some dimensions up here Dim outputArray() As Variant Dim inElement As Variant Dim subcell As Variant Dim scalar As Single Dim rankNum As Single Dim runningTot As Single 'convert ranges to values 'creating a new array from the mixture of ranges and values in the input array '''' 'This is where I create outputArray() from inputArray() '''' ReDim outputArray(0) For Each inElement In inputArray 'Normal values get copied from the input UDF to an output array, ranges get split up then appended If TypeName(inElement) = "Range" Or TypeName(inElement) = "Variant()" Then For Each subcell In inElement outputArray(UBound(outputArray)) = subcell ReDim Preserve outputArray(UBound(outputArray) + 1) Next subcell 'Stick the element on the end of an output array Else outputArray(UBound(outputArray)) = inElement ReDim Preserve outputArray(UBound(outputArray) + 1) End If Next inElement ReDim Preserve outputArray(UBound(outputArray) - 1) '''' 'End of new code, the rest is as before '''' scalar = 1 / WorksheetFunction.Sum(outputArray) rankNum = Rnd() runningTot = 0
For i = 0 To UBound(outputArray) runningTot = runningTot + outputArray(i) If runningTot * scalar >= rankNum Then PROBABLE = i + 1 Exit Function End If Next i
End Function
The start inputArray() outputArray() section is used to standardise different input methods. I.e. the user can enter a mixture of values, cell references/ranges and arrays, and the function can cope. e.g. {=PROBABLE(A1,5,B1:C15,IF(ISTEXT(D1:D3),LEN(D1:D3),0))} (you get the picture) should work just as well as =PROBABLE(A1:A3) . I cycle through the sub-elements of the inputArray() and put them in my outputArray(). I’m fairly certain
there’s nothing wrong with this portion of code. Then to get my results, I copied the UDF into A1:A1000 , used a COUNTIF(A1:A1000,1) or instead of count 1, I did count 2, 3, 4 etc for each of the possible UDF outputs and made a short macro to recalculate the sheet 100 times, each time copying the result of the countif into a table to graph. I can’t say precisely how I did that because I left this all at work, but I’ll update on Monday.
Using C# to read/write Excel files (.xls/.xlsx) (http://msexcelspreadsheet.com/using-c-to-readwrite-excel-files-xlsxlsx.html)
How to create excel sheet data directly from the .net application? (http://msexcelspreadsheet.com/how-to-create-excelsheet-data-directly-from-the-net-application.html)
How can I parse this Excel XML export file with this XSLT file? (http://msexcelspreadsheet.com/how-can-i-parse-thisexcel-xml-export-file-with-this-xslt-file.html)
Adding Picture gives linked image cannot be displayed. Excel VBA (http://msexcelspreadsheet.com/adding-picture-giveslinked-image-cannot-be-displayed-excel-vba.html)
Check if the file exists using VBA (http://msexcelspreadsheet.com/check-if-the-file-exists-using-vba.html)
Excel: How do I take the first character of 1 cell and prepend it to another cell and place it in a 3rd cell? (http://msexcelspreadsheet.com/excel-how-do-i-take-the-first-character-of-1-cell-and-prepend-it-to-another-cell-and-place-itin-a-3rd-cell.html)
0 Comments
MS Excel Spreadsheet
Recommend
1
Login
Sort by Best
Share
Start the discussion…
Subscribe
Add Disqus to your siteAdd DisqusAdd
Privacy
3 Solutions collect form web for “Excel UDF weighted RANDBETWEEN()” Try this: Function Probable(v As Variant) As Long Application.Volatile 'remove this if you don't want a volatile function
Dim v2 As Variant ReDim v2(LBound(v) To UBound(v) + 1)
v2(LBound(v2)) = 0 Dim i As Integer For i = LBound(v) To UBound(v) v2(i + 1) = v2(i) + v(i) / Application.Sum(v) Next i
Probable = Application.WorksheetFunction.Match(Rnd(), v2, 1) End Function
The array v is essentially your outputArray . The code takes an array like {1,0,0,1} and converts it to {0,0.5,0.5,1} (note the 0 at the beginning) at which point you can do a MATCH as you suggested to get to get either a 1 or 4 with equal probability. Similarly, if you were to start with {1,1,1,1} it would be converted to {0,0.25,0.5,0.75,1} and return any of 1, 2, 3 or 4 with equal probability.
Also note: you could probably make it a bit quicker if you save the value of Application.Sum(v) in a variable rather than performing the calculation for every value in array v . Update The function now takes v as a parameter — like your code. I also tweaked it a bit so that it can deal with v having any base, which means you can run it from the worksheet too: =Probable({1,0,0,1}) for example
This is something I have built, following your logic. It works quite ok, providing different results. Option Explicit Public Function TryMyRandom() As String
Dim lngTotalChances As Long Dim i As Long Dim previousValue As Long Dim rnd As Long Dim result As Variant
Dim varLngInputArray As Variant Dim varLngInputChances As Variant Dim varLngChancesReedit As Variant
varLngInputChances = Array(1, 2, 3, 4, 5) varLngInputArray = Array("a", "b", "c", "d", "e") lngTotalChances = Application.WorksheetFunction.Sum(varLngInputChances) rnd = Application.WorksheetFunction.RandBetween(1, lngTotalChances)
ReDim varLngChancesReedit(UBound(varLngInputChances))
For i = LBound(varLngInputChances) To UBound(varLngInputChances) varLngChancesReedit(i) = varLngInputChances(i) + previousValue previousValue = varLngChancesReedit(i)
If rnd 329 b ===> 351 e ===> 320
which is quite good random You can change the number of the sample here: For lng = 1 To 1000 , it works quite fast. I have just tried it with 100,000 tests.
It appears I have made a tragic mistake. My code was fine, my counting wasn’t so good. I was using SUMIF() instead of COUNTIF() in my graphing, resulting in later objects in the array (with a higher Index – the output of the UDF which I was
supposed to be counting but was instead summing) getting a weighting proportional to their position. In retrospect, I think someone far more clever than I could probably have deduced that from the information given. I said {1,1,1,1} has a {10%:20%:30%:40%} ,that’s a {1:2:3:4} ratio, which is precisely the same ratio as the indices of the
outputs, deduction: the outputs were summed not counted. Similarly, the graph of {1,0,0,1} with a {20%:0%:0%:80%} output, well divide each percentage by it’s index (20%/1, 80%/4) and Hey Presto {20%:0%:0%:20%} , or the 1:1 ratio I had expected. Something annoying but satisfying in that – knowing the answer was there all along. I suppose there’s probably a moral in all this. At least the post can serve as a warning to budding VBAers to check their arithmetic.
How to bind data to SQLBindCol using ODBC Driver API using C++ (http://msexcelspreadsheet.com/how-to-bind-data-tosqlbindcol-using-odbc-driver-api-using-c.html) Invalid column count in CSV input on line 1 Error (http://msexcelspreadsheet.com/invalid-column-count-in-csv-input-online-1-error.html)
MS Excel Spreadsheet is the best Office Software, Excel VBA and Excel Formulas make Spreadsheet work faster.