INTRODUCTIONS - Bradley Airport Master Plan Update [PDF]

Aug 24, 2017 - August 23, 2017. 10. BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL MEETING. Projected

8 downloads 21 Views 2MB Size

Recommend Stories


Kahului Airport Master Plan Update
What we think, what we become. Buddha

Bradley Airport
Be like the sun for grace and mercy. Be like the night to cover others' faults. Be like running water

Payson Airport Master Plan
You have to expect things of yourself before you can do them. Michael Jordan

(RFQ) AIRPORT MASTER PLAN
Ask yourself: Do you find it easier to do things for other people than to do things for yourself? N

Airport Master Plan
In the end only three things matter: how much you loved, how gently you lived, and how gracefully you

Sustainable Airport Master Plan
We may have all come on different ships, but we're in the same boat now. M.L.King

Airport Master Plan
Suffering is a gift. In it is hidden mercy. Rumi

Kalaeloa Airport Master Plan
Where there is ruin, there is hope for a treasure. Rumi

Southampton Airport | Master Plan
Do not seek to follow in the footsteps of the wise. Seek what they sought. Matsuo Basho

Airport Master Plan
If your life's work can be accomplished in your lifetime, you're not thinking big enough. Wes Jacks

Idea Transcript


8/24/2017

BRADLEY INTERNATIONAL AIRPORT

AIRPORT MASTER PLAN UPDATE

Technical Advisory Committee Meeting #3 August 23, 2017

INTRODUCTIONS CAA & BDL Nat’l Guard Units

 CAA / Airport Staff

FAA / ATC

 CHA Consulting Team  Technical Advisory Committee Members

Local Communities & COG

Airport Master Plan Stakeholders

Airlines & Cargo Operators

 Others Guests? TSA, DHS, & CBP

August 23, 2017

Rental Car & Parking Companies

General & Corporate Aviation, FBOs

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL ADVISORY COMMITTEE MEETING #3

2

1

8/24/2017

TODAY’S AGENDA  Introductions  Status of the Master Plan Update  Forecast Summary  BDL Design Aircraft  Draft Facility Requirements  Draft Development Concepts  Next Steps

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL ADVISORY COMMITTEE MEETING #3

3

AIRPORT MASTER PLAN STATUS We’re About Here:

Aerial Survey & Mapping

Development  Concepts

Study  Design

Inventory

Forecasts

Facility  Requirements

Land Use  Planning

Implementation  Plan Preferred Development  Strategy

Environmental  Overview

Financial Plan

Final  Documents &  Plan Adoption

ALP Set

Community and Stakeholder Engagement Approximate August 23, 2017

20

month

process

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL ADVISORY COMMITTEE MEETING #3

4

2

8/24/2017

FORECAST SUMMARY

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL MEETING

5

FORECAST SUMMARY Enplanements Forecast  Enplanement forecasts narrowed to highest growth, lowest growth, and the medium growth scenarios

6,000,000 5,500,000 5,000,000 4,500,000

Recommended Forecast

4,000,000 3,500,000 3,000,000 2016

2017

2022

2027

2032

2037

 Medium-High Air Service was the medium growth scenario, and the recommended forecast for enplanements

High Air Service (Hgh Growth) Medium-High Air Service (Medium Growth) 5-Year Trend Estimate (Low Growth)

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL ADVISORY COMMITTEE MEETING #3

6

3

8/24/2017

FORECAST SUMMARY Enplanements Forecast – TAF vs. Recommended 5,000,000 4,750,000

4.7% Difference

4,500,000 4,250,000 4,000,000 3,750,000 3,500,000

4.0% Difference

3,250,000 3,000,000 2017

2022 TAF

August 23, 2017

2027

2032

2037

Recommended

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL ADVISORY COMMITTEE MEETING #3

7

FORECAST SUMMARY General Aviation Operations

Cargo Operations

Military Operations

Total Based Aircraft

Year

Enplanements

Air Carrier Operations

2016

3,025,166

63,278

22,137

6,241

3,186

64

2017

3,187,046

67,482

22,354

6,241

3,186

65

2022

3,640,759

73,366

23,530

6,697

3,186

68

2027

4,003,164

78,788

24,940

7,174

3,186

72

2032

4,341,075

83,625

26,732

7,642

3,186

77

2037

4,653,118

87,734

29,395

8,141

3,186

85

AAGR

2.2%

1.7%

1.3%

1.3%

0%

1.4%

Growth

53.8%

38.7%

31.5%

30.4%

0%

31.5%

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL ADVISORY COMMITTEE MEETING #3

8

4

8/24/2017

DESIGN AIRCRAFT

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL MEETING

9

DESIGN AIRCRAFT TERMINAL DESIGN AIRCRAFT

FUTURE AIRPORT DESIGN AIRCRAFT

Existing  Boeing 757-200

Projected

Boeing 757‐200

 Existing  ARC C-IV  TDG 4

AIRPORT DESIGN AIRCRAFT Boeing 767‐300 Existing/Projected  Boeing 767-300

 Boeing 787-800  Projected Design Aircraft  ARC D-V  TDG 5

Boeing 787‐800

 Existing  ARC D-IV  TDG 5

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL MEETING

10

5

8/24/2017

AIRFIELD CAPACITY & FACILITY REQUIREMENTS

August 23, 2017

BRADLEY INTERNATIONAL AIRPORT // AIRPORT MASTER PLAN // TECHNICAL MEETING

11

AIRFIELD CAPACITY  Airfield Capacity is evaluated based on:  Hourly Capacity: Maximum number of operations safely accommodated in a one-hour period. Used to identify peak-period constraints.  Annual Service Volume (ASV): Maximum number of operations accommodated in a one-year period without excessive delay. Runway End 6 24 15 33 1 19

Runway End  Utilization 34% 41% 1% 24%

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.