M E M O R A N D U M [PDF]

Jul 5, 2017 - requirement SR-671-2, Supplemental Traffic Controller High Resolution Data Logging. Requirements, as publi

0 downloads 4 Views 39KB Size

Recommend Stories


M&A and R&D
You have survived, EVERY SINGLE bad day so far. Anonymous

A R E A P L A N C O M M I S S I O N
Make yourself a priority once in a while. It's not selfish. It's necessary. Anonymous

M. Ghorbani, A. R. Ashrafi, M
Those who bring sunshine to the lives of others cannot keep it from themselves. J. M. Barrie

JAERI-M u * m 3
If you want to go quickly, go alone. If you want to go far, go together. African proverb

R•A•M
Nothing in nature is unbeautiful. Alfred, Lord Tennyson

R•A•M
Silence is the language of God, all else is poor translation. Rumi

M e ASUR e M e NT
If you want to go quickly, go alone. If you want to go far, go together. African proverb

S A M S O N
Courage doesn't always roar. Sometimes courage is the quiet voice at the end of the day saying, "I will

K A M B R İ Y E N
Pretending to not be afraid is as good as actually not being afraid. David Letterman

Idea Transcript


Florida Department of Transportation RICK SCOTT GOVERNOR

605 Suwannee Street Tallahassee, FL 32399-0450

MIKE DEW SECRETARY

July 5, 2017 Khoa Nguyen Director, Office of Technical Services Federal Highway Administration 3500 Financial Plaza, Suite 400 Tallahassee, Florida 32312 Re:

State Specifications Office Section: 671 Proposed Specification: 6710000 Traffic Controllers.

Dear Mr. Nguyen: We are submitting, for your approval, two copies of the above referenced Supplemental Specification. The changes are proposed by Elizabeth Birriel of the State Traffic Operations Office to update the requirements for new installations of traffic controllers. Please review and transmit your comments, if any, within two weeks. Comments should be sent via email to [email protected]. If you have any questions relating to this specification change, please call me at 414-4130. Sincerely, Signature on file Dan Hurtado, P.E. State Specifications Engineer DH/dt Attachment cc: Florida Transportation Builders' Assoc. State Construction Engineer

6710000.D01 All Jobs TRAFFIC CONTROLLERS. (REV 5-2-177-5-17) SECTION 671 is deleted and the following substituted: 671-1 Description. Furnish and install a NEMA, Model 170, Model 2070, or ATC controller unit as shown in the Plans. Meet the requirements of Section 603. 671-2 Materials. Use traffic controllers listed on the Department’s Approved Product List (APL). Ensure equipment is permanently marked with the manufacturer’s name or trademark, part number, and serial number. Controllers must meet the following applicable industry standards: NEMA TS1 Controller ........................... NEMA TS-1-1989 NEMA TS2 Controller ........................... NEMA TS-2-2003 Model 170 Controller .................. CALTRANS TEES, 2009 Model 2070 Controller ................ CALTRANS TEES, 2009 ATC Controller ................ AASHTO/ITE/NEMA ATC 5.2b All NEMA TS2, Model 2070 and ATC controllers must provide functionality that meets or exceeds operational characteristics, including NTCIP support, as described in NEMA TS-22003. Except for replacing controllers in existing systems, all new installations must include controllers that will: 1. DeAactivate the dimming circuit of LED Sstreet Llighting, as shown in the Plans, during pedestrian activations. Use of Pedestrian detector diagnostics shallmust be activated when this feature is being used. 2. cCapture all mandatory event-based data elements listed in supplemental requirement SR-671-2, Supplemental Traffic Controller High Resolution Data Logging Requirements, as published on the Department’s State Traffic Engineering and Operations Office website at the time of Contract lettingfollowing URL: http://www.fdot.gov/traffic/Traf_Sys/Product-Specifications.shtm. . 671-3 Method of Measurement. No separate payment will be made for the controller; payment is included with the Traffic Controller Assembly.

6710000.D01 All Jobs TRAFFIC CONTROLLERS. (REV 7-5-17) SECTION 671 is deleted and the following substituted: 671-1 Description. Furnish and install a NEMA, Model 170, Model 2070, or ATC controller unit as shown in the Plans. Meet the requirements of Section 603. 671-2 Materials. Use traffic controllers listed on the Department’s Approved Product List (APL). Ensure equipment is permanently marked with the manufacturer’s name or trademark, part number, and serial number. Controllers must meet the following applicable industry standards: NEMA TS1 Controller ........................... NEMA TS-1-1989 NEMA TS2 Controller ........................... NEMA TS-2-2003 Model 170 Controller .................. CALTRANS TEES, 2009 Model 2070 Controller ................ CALTRANS TEES, 2009 ATC Controller ................ AASHTO/ITE/NEMA ATC 5.2b All NEMA TS2, Model 2070 and ATC controllers must provide functionality that meets or exceeds operational characteristics, including NTCIP support, as described in NEMA TS-22003. Except for replacing controllers in existing systems, all new installations must include controllers that will: 1. Deactivate the dimming circuit of LED street lighting, as shown in the Plans, during pedestrian activations. Pedestrian detector diagnostics must be activated when this feature is used. 2. Capture all mandatory event-based data elements listed in supplemental requirement SR-671-2, Supplemental Traffic Controller High Resolution Data Logging Requirements, as published on the Department’s State Traffic Engineering and Operations Office website at the following URL: http://www.fdot.gov/traffic/Traf_Sys/Product-Specifications.shtm. 671-3 Method of Measurement. No separate payment will be made for the controller; payment is included with the Traffic Controller Assembly.

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.