May 23, 2017 - Page 2 of 2. Question 1: DWG S-001 makes reference to UFC 3 -301-01 of 15 May 2014. However, there is a n

0 downloads 5 Views 18KB Size

Recommend Stories


modification of contract
Never let your sense of morals prevent you from doing what is right. Isaac Asimov

modification of contract
Be like the sun for grace and mercy. Be like the night to cover others' faults. Be like running water

Contract Modification Actions
Be grateful for whoever comes, because each has been sent as a guide from beyond. Rumi

01 26 00 Contract Modification Procedures
This being human is a guest house. Every morning is a new arrival. A joy, a depression, a meanness,

PDF Behavior Modification
No amount of guilt can solve the past, and no amount of anxiety can change the future. Anonymous

[PDF] Download Behavior Modification
When you talk, you are only repeating what you already know. But if you listen, you may learn something

[PDF] Download Behavior Modification
Come let us be friends for once. Let us make life easy on us. Let us be loved ones and lovers. The earth

Read PDF Behavior Modification
Be like the sun for grace and mercy. Be like the night to cover others' faults. Be like running water

[PDF] Behavior Modification
Almost everything will work again if you unplug it for a few minutes, including you. Anne Lamott

[PDF] Behavior Modification
Stop acting so small. You are the universe in ecstatic motion. Rumi

Idea Transcript


1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2. AMENDMENT/MODIFICATION NO.

AMENDMENT NO. 6. ISSUED BY

3. EFFECTIVE DATE.

0003 CODE

4. REQUISITION/PURCHSE REQ.NO.

PAGE 1

OF PAGES 2

5. PROJECT NO. (If applicable)

23-May-17

P1-396B 7. ADMINISTERED BY (If other than Item 6)

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1005 Michael Road Camp Lejeune, NC 28547-2521

CODE

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

(X)

9A. AMENDMENT OF SOLICITATION NO.

N4008517R3042 X

9B. DATED (SEE ITEM 11)

4/24/2017 10a. MODIFICATION OF CONTRACT/ORDER NO. 10B. DATED (SEE ITEM 11)

FACILITY CODE

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which indludes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MOFIFICATION OF CONTRACTS/ORDERS IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PERSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. THE ABOVE NUMBERED CONTRACT/ORDER ISMODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORTY OF FAR 43.103(b). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor

is not,

is required to sign this document and return ______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (organized by UCF section headings, indluding solicitation/contract subject matter where feasible.)

17-3042, P1396B SOF Intel OPS Expansion Phase II, MARSOC This amendment should be acknowldeged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal. ---- See Continuation Page(s) ----

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign) NSN 7540-01-152-8070 Previous edition unusable

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of Contracting Officer) STANDARD FORM 30 (REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243

Amendment 0003 Solicitation N4008517R3042 Page 2 of 2 Question 1: DWG S-001 makes reference to UFC 3 -301-01 of 15 May 2014. However, there is a newer update: UFC 3 -301-01 with Change 3, 12 September 2016. This UFC changes to IBC to 2015. Please confirm if applicable. Answer 1: The project was designed to UFC 3-301-01 May 2014. The later version is not applicable for this project. Question 2: Spec 07 42 13 - Composite Metal Wall Panels - para 1.3.2 provides a different deflection criteria than to the criteria in spec 13 34 19. Please identify prevailing criteria. - Wall panels? DWG A-301 wall sections B4 & B5 illustrate a metal wall panel with R25 blanket insulation. However, spec calls for an insulated metal panel. Please advise. - Roof insulation? DWG A-301 wall sections B4 & B5 illustrate a metal roof panel with R- 30 blanket insulation. However, DWG A-103 detail D4 shows rigid roof insulation. Please advise. Answer 2: Section 07 42 13 - Composite Metal Wall Panels are for smooth "architectural" metal panels which were not used on this project. Use section 13 34 19 for panel criteria. - It is not a requirement for the metal panels to be insulated. - The roof insulation is modeled after the "Simple Saver System". Which is comprised of a Syseal fabric uninterrupted below the perlins and sealed around the perimeter and two layers of uncompressed, unfaced fiberglass insulation run between the perlins and run perpendicular above the perlins. Rigid roof insulation is not used on this project.