Optimasi Kapasitas Produksi Assembly Line LED Downlight PT. DEF [PDF]

PT. DEF is a manufacturing company that produces lighting fixture. Light Emitting Diode (LED) down-light is one of the c

21 downloads 14 Views 40KB Size

Recommend Stories


Optimasi Kapasitas Produksi Assembly Line LED Downlight PT. DEF
We may have all come on different ships, but we're in the same boat now. M.L.King

downlight hydra-240 led
This being human is a guest house. Every morning is a new arrival. A joy, a depression, a meanness,

led downlight
I cannot do all the good that the world needs, but the world needs all the good that I can do. Jana

DRD2 LED Downlight
I tried to make sense of the Four Books, until love arrived, and it all became a single syllable. Yunus

6" LED Downlight
This being human is a guest house. Every morning is a new arrival. A joy, a depression, a meanness,

downlight 750 led
Do not seek to follow in the footsteps of the wise. Seek what they sought. Matsuo Basho

LED Downlight Range
Sorrow prepares you for joy. It violently sweeps everything out of your house, so that new joy can find

ANALISA PERENCANAAN KAPASITAS PRoDUKSI PADA PT. MUNCUL ABADI DENGAN
In the end only three things matter: how much you loved, how gently you lived, and how gracefully you

Assembly LED
What you seek is seeking you. Rumi

Optimasi Produksi Bioetanol Tongkol Jagung
Kindness, like a boomerang, always returns. Unknown

Idea Transcript


JOURNAL OF INDUSTRIAL ENGINEERING HOME

ABOUT

LOGIN

REGISTER

SEARCH

CURRENT

ARCHIVES

Home > Vol 1, No 1 (1) > Desfiasr

OPEN JOURNAL SYSTEMS Journal Help US ER Username

OPTIMASI KAPASITAS PRODUKSI ASSEMBLY LINE LED DOWNLIGHT PT. DEF Ririn Desfiasri Desfiasr, Andira Andira

ABSTRACT PT. DEF is a manufacturing company that produces lighting fixture. Light Emitting Diode (LED) down-light is one of the company flagship products. With the new type (LGB72316 LE1 and LGB72317 LE1) and the company's policy not to add man-power in production units lead automatically in addition of work hours on the production schedule that’s resulting in increased overtime. After a series of data collection and testing, as well as the determination of standard time on the assembly line work related, research shows that low line efficiency (66.55%) and the balance delay is high (33.45%). This is an indication of poor performance related on the assembly line. Line balancing would be an alternative problem solving tools to overcome these problems. This study tried to draft a new balancing method Helgeson-Birnei, Moodie Young and Kilbridge-Wester Heuristics. Of a series of procedures that have been performed, the method Kilbridge-Wester Heuristics showed the best results. The method is able to improve performance by reducing cycle time, product of 35.17 seconds / products became 32.88 seconds / products and generate 6 work stations with 6 operators, line efficiency 94.91%, balance delay 5.09%, smoothness index of 6,224 and labor cost saving of Rp 7,215,011.27 per month.

FULL TEXT: PDF

Password Remember me Login

NOTIF IC ATIONS View Subscribe

LANGUAGE Select Language English

J OUR NAL C ONTENT Search Search Scope All Search

REFERENCES Boysen, N., Fliedner, M., & School, A. (2007). A Classification of Assembly Line Balancing Problems. Europan Journal of Operation Research , 183. Desfiasri, R. (2014). Analisis Peningkatan Kapasitas Produksi Assembly Line PT.DEF, Skripsi, Jurusan Teknik Industri, Universitas Presiden. Elsayed, E. A., and Boucher, T. O. (1994). Analysis and Control of Production Systems (2nd Edition ed.). Englewood Cliffs, New Jersey: Prentice Hall International, Inc.

Browse By Issue By Author By Title Other Journals

F ONT S IZE

Grous, A. (2013). Analysis of Reliability and Quality Control : Fracture Mechanics 1. Hoboken, New Jersey: John Wiley and Sons. Niebel, B., & Freivalds, A. (2009). Niebel's Methods, Standards and Work Design (12th edition ed.). New York: McGraw Hill International Edition.

INF OR M ATION

Purnomo, Hari. (2004). Pengantar Teknik Industri. Edisi Kedua. Yogyakarta: Graha Ilmu, 2004.

For Readers For Authors For Librarians

Sutalaksana, I. Z., Anggawisastra, H. R., & Tjakraatmadja, J. H. (2006). Teknik Perancangan Sistem Kerja. Bandung: Institut Teknologi Bandung. Wignjosoebroto, S. (2008). Ergonomi Studi Gerak dan Waktu : Teknik Analisis untuk Peningkatan Produktivitas Kerja. Surabaya: Guna Widya.

REFBACKS There are currently no refbacks.

Submit

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.