Piping Progress Measurement (In Dia and In Meter) Project Baseline ... [PDF]

Piping Progress Measurement. (In Dia and In Meter). Project Baseline Consultants. C-11, C-Wing, Ground Floor,. Satyam Sh

88 downloads 39 Views 102KB Size

Recommend Stories


cdio project in progress contributions
Don’t grieve. Anything you lose comes round in another form. Rumi

project progress
The happiest people don't have the best of everything, they just make the best of everything. Anony

[PDF] A Work in Progress
When you talk, you are only repeating what you already know. But if you listen, you may learn something

[PDF] A Work in Progress
You miss 100% of the shots you don’t take. Wayne Gretzky

EuroAsia Interconnector Project and Progress
Don't be satisfied with stories, how things have gone with others. Unfold your own myth. Rumi

in progress
Never let your sense of morals prevent you from doing what is right. Isaac Asimov

baseline (in chromatography)
No amount of guilt can solve the past, and no amount of anxiety can change the future. Anonymous

Motion Tracking in an Acoustic Point-Measurement Current Meter
And you? When will you begin that long journey into yourself? Rumi

(PEX) Piping in a Building
Where there is ruin, there is hope for a treasure. Rumi

[PDF] Download A Work in Progress
You can never cross the ocean unless you have the courage to lose sight of the shore. Andrè Gide

Idea Transcript


Piping Progress Measurement (In Dia and In Meter)

Project Baseline Consultants C-11, C-Wing, Ground Floor, Satyam Shopping Complex, M.G.Road, Ghatkopar-East Mumbai-400089, India www.projectbaseline.in Revision 0

Piping Progress Measurement

Index A.

Piping Fabrication - Progress Measurement (Inch Dia) ................................. 3

B.

Erection and Hydrotesting – Progress Measurement (Inch Meter) ................. 3

C.

Unit Piping ........................................................................................................... 4

D.

I.

Guide Lines For Estimation of manpower (Above Ground Piping)................................ 5

II.

Weightage Factor for Piping Above Ground ................................................................. 5

Pipe Rack or Cross Country Piping ................................................................... 6

Page 2 of 6

Piping Progress Measurement

A. Piping Fabrication - Progress Measurement (Inch Dia) In construction projects Inch Dia unit of Measure is used to measure the progress of Piping Spool fabrication. The weld joint of the pipe size is converted to the equivalent inch dia of welding Examples: 1. One welding joint of 8 inch diameter pipe

=

8 Inch Dia

2. Two welding joints of 12 inch diameter pipe

=

24 Inch Dia

B. Erection and Hydrotesting – Progress Measurement (Inch Meter) In construction projects Inch Meter unit of Measure is used to measure the progress of Piping Erection and Hydrotesting. The length of pipe erected or hydrotested of the pipe size is converted to the equivalent inch Meter of erection or hydrotesting. Examples: 1. 10 Meter of 8 inch diameter pipe Erected or Hydrotested Inch Meter

=

80

2. 12 Meter of 6 inch diameter pipe Erected or Hydrotested Inch Meter

=

72

Page 3 of 6

Piping Progress Measurement

C. Unit Piping Unit piping are piping work carried out to connect two equipments in the process and utility areas. The piping in these areas is more complex in terms of erection and welding of site joints.

Page 4 of 6

Piping Progress Measurement

I.

Guide Lines For Estimation of manpower (Above Ground Piping) Sr. No.

Fabrication Material

a)

II.

Carbon Steel Piping

Productivity per welder day on single shift basis

Normal Welder Gang

20 Inch Dia

b)

Stainless Steel Piping

16 Inch Dia

c)

Alloy Steel Piping

14 Inch

1 Fitter 1 Welder 1 Gas Cutter 2 Riggers 2 Helpers

Weightage Factor for Piping Above Ground a. b. c. d. e.

Pre-Fabrication Erection / Welding Fixing valves Supporting Testing

-

Page 5 of 6

30% 70% 80% 90% 100%

Piping Progress Measurement

D. Pipe Rack or Cross Country Piping Pipe Rack or Cross Country piping are piping work carried out to connect two units and are usually straight. The piping in these areas is less complex when compared with Unit Piping

Observation: • •

In Unit Piping there is more welding and less of erection In Piperack or Cross Country there is less of welding and more of Pipe Laying

Page 6 of 6