PRC-027 Capabilities.pdf - Quanta Technology [PDF]

PRC 027-1: An Automated Solution for CAPE/ASPEN Users. For more information please ... Quanta Technology offers an autom

18 downloads 13 Views 850KB Size

Recommend Stories


Quanta Cloud Technology
Respond to every call that excites your spirit. Rumi

Quanta Cloud Technology
We may have all come on different ships, but we're in the same boat now. M.L.King

Quanta Cloud Technology
You have survived, EVERY SINGLE bad day so far. Anonymous

capabilitiesPDF
Sorrow prepares you for joy. It violently sweeps everything out of your house, so that new joy can find

Quanta V4.0 PDF
Nothing in nature is unbeautiful. Alfred, Lord Tennyson

Prospekt Quanta GB_V6:Prospekt Quanta GB
Make yourself a priority once in a while. It's not selfish. It's necessary. Anonymous

Prospekt Quanta GB_V6:Prospekt Quanta GB
How wonderful it is that nobody need wait a single moment before starting to improve the world. Anne

Quanta 2016-2017
What we think, what we become. Buddha

Quanta Image Sensor
Life is not meant to be easy, my child; but take courage: it can be delightful. George Bernard Shaw

PDF Technology
You often feel tired, not because you've done too much, but because you've done too little of what sparks

Idea Transcript


PC-C--082016

CAPABILITIES

PRC 027-1: An Automated Solution for CAPE/ASPEN Users What are the Requirements? R1. Establish a process for developing new and revised protection system settings. R2. Perform a protection system coordination study or compare present fault current values to an established base line. R3. Develop new & revised protection system settings by following your process. Does your organization need to implement PRC-027-1? Yes, if you are a:  Transmission Owner;  Generation Owner; or  Distribution Provider that owns Protection Systems Protection Systems installed for the purpose of detecting Faults on BES Elements. For more information please contact our team in the: Northeastern US: Jim Blackman (610)888-9200 [email protected] Southern USA & Canada: Diana Prkacin (919) 737-5519 [email protected] Central USA: Evan Estes (636)751-1960 [email protected] Western USA: Reza Nasri (510)272-2769 [email protected] International: David Elizondo +1 -510-272-2769 [email protected]

Coordination of Protection Systems for Performance During Faults PRC-027-1 is on track for approval by FERC in Early to Mid 2017. When this new NERC requirement goes into effect, utilities will be required to perform periodic reviews of their Bulk Electric System (BES) relay settings to ensure proper coordination between relays , including relays that are applied on tie lines with neighboring utilities. Quanta Technology offers an automated solution for all CAPE and ASPEN users that considerably reduces the time spent in complying with this requirement and in documenting and demonstrating compliance. By combining our expertise in system protection analysis, applying the advanced protection modeling and simulation features in CAPE or ASPEN with other tools that we have developed in-house over several years, Quanta Technology is able to offer an elegant solution to meet PRC-027-1 requirements. When does PRC-027-1 go into effect? Effective Date: Time to Implement:

24 Months after approval by FERC. 72 Months (6 years) from Effective Date.

What are the PRC-027-1 requirements? The standard imposes three requirements (encapsulated in Figure 1), that: R1. Establish a process for developing new and revised protection system settings for BES elements such that the protection systems operate in the intended sequence during faults. R2. This requirement applies to BES element protection system functions wherein either the fault current is used to develop settings or coordinated operation with other protection systems is required. For such protection systems, the standard provides three options:  Perform a protection system coordination study in a time interval not to exceed six years, or  Compare present fault current values to an established base line and perform a protection system coordination study when the comparison identifies a deviation greater than 15%, all in a time interval not to exceed six years.  A combination of Option 1 & Option 2. R3. Develop new & revised protection system settings by following the process developed in requirement R1. Figure 1: Quanta Technology’s Offerings to Support NERC PRC-027 Compliance •Setting Management •Power system Model Management •QA & Review Procedure •Interaction with Neighboring Utilities

R1 Effective Process

•Manage Periodic Bus SC Fault Current •Perform Coordination Study of BES Elements every 6 Years

R2 Review System

Repeat Requirements Every 6Yrs Using R1

•Revise Settings •Risk Assessment •Update Base Case

R3 Develop Settings

What should a Utility consider when deciding on how to implement PRC-027 compliance?

What is the Timeline?

As the number of studies and the need to prove compliance increases, protection teams experience increased workload and therefore may want to consider improved efficiencies such as:  Process consolidation  Process automation through built in CAPE macros and 3rd Party tools such as Quanta’s PSA (Protection System Analyser) including interface to asset management software.  Elimination of manual processes The result is increased efficiency of resource utilization and reduction of human errors.

Effective Date: 2 years after FERC approval.

Where is the best place to start? The base case has several major components such as: the short circuit model, the relay settings, and the coordination review. In looking at each of these components, some items to consider include:  Is my system primary model updated and correct?  Are the relay field settings the ones available for the coordination study?  What is the level of confidence in the system coordination in the base case? The first two items are related to using accurate information and are associated with the process of updating the appropriate systems. The last item concerning coordination is obviously dependent on the first two, but even with completely accurate input data the overall BES system coordination is worth considering in more detail. Why? Over the years, coordination reviews are not usually performed over a wide area. Additionally, primary system and protection system contingencies are considered in a very limited manner. Both items result in latent protection issues that need to be addressed prior to establishing the base case. The solution is to consider a Wide Area Co-Ordination Study for PRC-027 that will modernize your process to minimize time and effort for downstream reporting. How quickly can you prove your system complies? It is important to note that the effective date of the standard is the first day of the first calendar quarter that is 24 months after the date the standard is approved by FERC. Assuming FERC grants approval in early 2017, the standard will become effective in early 2019. The 6-year time interval of requirement R2 will then begin early 2019. It is also important to note that should the organization decide to use Option 2 of requirement R2, a base line case must be established by the effective date of the standard, which would be early 2019. Quanta Technology suggests that the organization starts the preparation as soon as possible. We can assist in:  reviewing your existing setting philosophy and management process  assessing your existing network and protection models  assessing the tools used to analyse your models We can then make recommendations on changes that might be needed to any or all of the above so that compliance with PRC-027-1 can be achieved efficiently. Figure 2: Quanta Technology’s Offerings to Support NERC PRC-027 Compliance Q2

2017 Q3

Q4

Q1

2018 Q3 Q2

Q4

Q1

Q2

2019 Q3

Beyond 2019 Q4

R1 R2 R3 (New Settings) Kick-Off

Assessment

Roadmap

Implementation

A milestone schedule based on a Q2 Effective Date is shown above. An overall implementation plan includes an assessment of your current process, creation of a roadmap for implementation, a detailed timeline for the plan and implementation of the plan. We consider factors such as utility budget, priorities, resources, and the size of the BES when committing to timing. Getting started early in review of your process is a key milestone to successfully implementing PRC-027-1.

Implementation Deadline: 6 years from Effective Date. Getting Started: Timeline to implement is a key factor, and as you would expect, to review your existing processes and tools takes time. A plan can be created on how to move forward with the new tools and processes. Depending on the system size, establishing a base case to review and update the system and relay data, as well as catch latent coordination issues takes time not only to perform the study but also time to correct any discovered issues. To successfully meet the new workplace challenges and opportunities, getting started soon is the key.

About Quanta Technology: Quanta Technology is a consulting and technology firm providing expertise, software and testing tools to solve strategic and operational problems for global energy utilities and industry. We focus on solutions for transmission and distribution in key areas of protection & control, planning, operations, asset management, as well as emerging technologies such as : distributed energy resource integration, storage and energy system automation. Quanta Technology is a wholly owned subsidiary and technology arm of Quanta Services Inc. (NYSE: PWR). Our Locations: Raleigh, NC headquarters and regional offices in Boston, Chicago, Oakland and Toronto, Canada.

Quanta Technology, LLC 4020 Westchase Blvd.; Suite 300 Raleigh, NC 27607 +1 (919) 334-3000 www.quanta-technology.com

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.