PROJECT UPDATE OCTOBER 2017 CONSTRUCTION UPDATE The [PDF]

CONSTRUCTION UPDATE. The installation of the fixtures and fittings to the interiors of the apartments is ... for install

9 downloads 7 Views 311KB Size

Recommend Stories


Project Construction Update
Knock, And He'll open the door. Vanish, And He'll make you shine like the sun. Fall, And He'll raise

July 2017 project update
Stop acting so small. You are the universe in ecstatic motion. Rumi

DSM-5 Update October 2017
Learning never exhausts the mind. Leonardo da Vinci

Project Update
Don't watch the clock, do what it does. Keep Going. Sam Levenson

ERS literature update October-November 2017
If you are irritated by every rub, how will your mirror be polished? Rumi

Weekend Update Newsletter October 20, 2017
Don't watch the clock, do what it does. Keep Going. Sam Levenson

Social Housing Monthly Update October 2017
Open your mouth only if what you are going to say is more beautiful than the silience. BUDDHA

Energy Infrastructure Update For October 2017
We can't help everyone, but everyone can help someone. Ronald Reagan

28th Annual Psychopharmacology Update October 21, 2017
Courage doesn't always roar. Sometimes courage is the quiet voice at the end of the day saying, "I will

Weld County Oil & Gas Update October 2017
It always seems impossible until it is done. Nelson Mandela

Idea Transcript


PROJECT UPDATE OCTOBER 2017

请点击 此处查看中文版.

We are pleased to advise you that the construction of the Ivy and Eve development is fast approaching completion.

The anticipated settlement of the apartments for Ivy and Eve is on track for November/December 2017.

CONSTRUCTION UPDATE

The installation of the fixtures and fittings to the interiors of the apartments is continuing to progress and has now reached all levels with completion due in the upcoming month.

Installation of the kitchen joinery and internal painting is currently occurring on Level 27. Quality control of the completed apartments has commenced on the lower to midlevels.

The recreational deck and common facilities on Level 5 are progressing as planned with these areas taking fantastic shape. The gym and yoga room are being prepared for installation with the swimming pool area and deck currently under construction.

External façade painting and window installation has reached Level 30 and is close to completion. The vertical Green wall feature on Merivale Street is being planted.

WHAT’S NEXT? •

Basement parking structures are very close to completion •



Completion of the Ground Floor lift lobbies

Ivy construction hoist to be removed and the Eve crane to be demobilised

Here are a few recent photos of Ivy and Eve including the planting of the vertical green wall feature

GETTING READY FOR SETTLEMENT Your finance application should be well underway by now.

Please do not underestimate the amount of time required to complete a finance application. We are currently in Phase Two of the below:

In preparation of the loan application, you will be required to have various supporting documents such as personal identification, proof of income, copy of your purchase contract, evidence of savings and details of other debts/liabilities. On application, the banks will provide a detailed list of their requirements that you will need to supply.

An email will be sent out later in the month providing dates for the bank valuation, please note that it is your responsibility to notify and keep your bank updated.

If you have any queries relating to the settlement process, please do not hesitate to contact Pauline Paihes from Property Settlement Solutions on (03) 8582 8971 or [email protected]

Three Sixtyº Property Group Pty Ltd Melbourne | Sydney | Brisbane

www.360propertygroup.com.au

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.