railway under bridge construction methodology ... - Ascent Journals [PDF]

Abstract. Under Bridges are required to be provided under earth embankment for crossing of Vehicular/Road traffic, railw

1 downloads 3 Views 63KB Size

Recommend Stories


railway bridge trail
Just as there is no loss of basic energy in the universe, so no thought or action is without its effects,

bridge construction
There are only two mistakes one can make along the road to truth; not going all the way, and not starting.

Roadway and Railway Construction
I tried to make sense of the Four Books, until love arrived, and it all became a single syllable. Yunus

Olmsted Dam Construction Methodology
Silence is the language of God, all else is poor translation. Rumi

Accelerated bridge construction overview
Those who bring sunshine to the lives of others cannot keep it from themselves. J. M. Barrie

Accelerated Bridge Construction
The only limits you see are the ones you impose on yourself. Dr. Wayne Dyer

Bridge Construction Loads Topics
You have survived, EVERY SINGLE bad day so far. Anonymous

Estimating Total Cost of Bridge Construction using Accelerated Bridge Construction
You have survived, EVERY SINGLE bad day so far. Anonymous

Fluoroskan Ascent FL & Ascent
The best time to plant a tree was 20 years ago. The second best time is now. Chinese Proverb

case studies in railway construction
Sorrow prepares you for joy. It violently sweeps everything out of your house, so that new joy can find

Idea Transcript


International J.of Multidispl.Research & Advcs. in Engg.(IJMRAE), ISSN 0975-7074, Vol. 3, No. I (January 2011), pp. 293-308

RAILWAY UNDER BRIDGE CONSTRUCTION METHODOLOGY, DESIGN AND ANALYSIS

M. K. GUPTA AND GUNTUKA INDRA SENA REDDY

Abstract Under Bridges are required to be provided under earth embankment for crossing of Vehicular/Road traffic, railway traffic across the level crossing of Railway line, etc. The under Bridges are also required in urban area where the busy Business location streets crossing to Railway lines etc.Present day Intensity of Traffic, both Rail & Road due to the fast development of Industries and other Infrastructures, is very heavy and so it cannot be disturbed, for construction of under bridges or drainage etc by conventional i.e. open cut system. So to construct under bridges without disturbing the existing Railway / Road embankment we choosen to construct the RCC BOX CELL BRIDGE by Box Pushing Technique, where in R.C.C. Boxes in segments are cast out side and pushed through the heavy embankments of Rail or Road by Jacking. The required thrust is generated through thrust bed, as well as line & level of precast boxes are also controlled.Further my thesis work is restricted to design and Analysis part only. Analysis part is done using the computer software Staad.pro and design part is done by manually as per IRS Bridge Rules IRS ……1997. The box segments design and Analysis part is very simple and not critical. To push the Box into the embankment of railway is also not a major problem, the required thrust can be generated from thrust bed by jacking. After completion of the work Thrust Bed can be used as a protection work in Hydraulic structures and rigid pavement work in Highway structures.The required bearing capacity of soil is very little. Safest method of crossing underground / Embankment, without disturbing overhead traffic / structures for R.U.B

---------------------------------------Keywords : Railway Under Bridge, Pushing Technique Method, Design&Analysis

© Ascent Publication House: http: //www.ascent-journals.com

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.