Window & Door Schedule
In the end only three things matter: how much you loved, how gently you lived, and how gracefully you

Window & Door Schedule
Just as there is no loss of basic energy in the universe, so no thought or action is without its effects,

schedule schedule
Don’t grieve. Anything you lose comes round in another form. Rumi

Security Door Opening Schedule
Don't count the days, make the days count. Muhammad Ali

Schedule (pdf)
In every community, there is work to be done. In every nation, there are wounds to heal. In every heart,

SCHEDULE
Learn to light a candle in the darkest moments of someone’s life. Be the light that helps others see; i

daily schedule daily schedule
Just as there is no loss of basic energy in the universe, so no thought or action is without its effects,

schedule
Forget safety. Live where you fear to live. Destroy your reputation. Be notorious. Rumi

SCHEDULE
Never wish them pain. That's not who you are. If they caused you pain, they must have pain inside. Wish

Schedule
Be like the sun for grace and mercy. Be like the night to cover others' faults. Be like running water

Idea Transcript


DOOR SCHEDULE

WINDOW SCHEDULE

900

900 600

ROOM ENTRANCE DOORS

2 100

2 100

600

600

D-01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11 (11off)

1 200

INTERNAL TOILET DOORS

D-12, 13, 14, 15, 16 (5off)

BATHROOM

W-12 (X1)

FRAME

SOLID WOOD TIMBER FRAME

FRAME

SOLID WOOD TIMBER FRAME

FRAME

EXTRUDED ALUMINIUM WINDOWS WITH MATCHING ALUMINIUM BEADING & RUBBER GLAZING SEALS. PLUG & SCREW FIXED TO WALLS & LINTOLS. SEAL WITH SILICON ALL ROUND.

FINISH

1 HOUR FIRE RATED, SOLID TIMBER DOOR

FINISH

HOLLOW CORE TIMBER DOOR

FINISH

MATT GRAPHITE GREY EPOXY POWDER COATED (CODE:RAL7024), RANGE: INTERPON 02525.

GLAZING

TINTED DOUBLE LOW E TOTAL U-VALEU=2041 / SHGC=0.51 GRND FL.TINTED DOUBLE . TOTAL U-VALEU=4.23 / SHGC=0.59 FIRST FL.

PRECAST CONC. LINTOLS.

LINTOLS

PRECAST CONC. LINTOLS.

900 x 2100

CILLS

EXTERNAL: PLASTER & PAINT EDGE AT 30° SLOPE.

SIZES

600 x ERF 1200

LINTOLS SIZES

LINTOLS

PRECAST CONC. LINTOLS. 900 x 2100

SIZES

of Eshowe. Bulwer Avenue 225

WINDOW SCHEDULE Client

683

900

633

683

467

600

900

600

600

900

517

1 500

600

517

600

344

600

1 244

U/S lintel level 2.100

2 100 Clients Name Clients contact Street address

2 000

1 500 BATH ROOM

W-11, W-10, W-09, ROOM1, 2, W-08, W-07(X5) 3, 4, 5, 6, 7, 8

: King Cetshwayo Municipality : 035 799 2500 : King Cetshwayo House, Krugerrand, CBD Richards Bay

Clients signature:………………………………………

W-01, W-02, W-03, W-04, W-13, W-14, W-15, W-16 (X8)

KITCHEN

W-05(X1)

KITCHEN

W-06 (X1)

Project description: Proposed Additions & Alterations & Demolishing of Existing Water Plant of Eshowe.

FRAME

EXTRUDED ALUMINIUM WINDOWS WITH MATCHING ALUMINIUM BEADING & RUBBER GLAZING SEALS. PLUG & SCREW FIXED TO WALLS & LINTOLS. SEAL WITH SILICON ALL ROUND.

FRAME

EXTRUDED ALUMINIUM WINDOWS WITH MATCHING ALUMINIUM BEADING & RUBBER GLAZING SEALS. PLUG & SCREW FIXED TO WALLS & LINTOLS. SEAL WITH SILICON ALL ROUND.

FRAME

EXTRUDED ALUMINIUM WINDOWS WITH MATCHING ALUMINIUM BEADING & RUBBER GLAZING SEALS. PLUG & SCREW FIXED TO WALLS & LINTOLS. SEAL WITH SILICON ALL ROUND.

FRAME

EXTRUDED ALUMINIUM WINDOWS WITH MATCHING ALUMINIUM BEADING & RUBBER GLAZING SEALS. PLUG & SCREW FIXED TO WALLS & LINTOLS. SEAL WITH SILICON ALL ROUND.

FINISH

MATT GRAPHITE GREY EPOXY POWDER COATED (CODE:RAL7024), RANGE: INTERPON 02525.

FINISH

MATT GRAPHITE GREY EPOXY POWDER COATED (CODE:RAL7024), RANGE: INTERPON 02525.

FINISH

MATT GRAPHITE GREY EPOXY POWDER COATED (CODE:RAL7024), RANGE: INTERPON 02525.

FINISH

MATT GRAPHITE GREY EPOXY POWDER COATED (CODE:RAL7024), RANGE: INTERPON 02525.

GLAZING

TINTED DOUBLE LOW E TOTAL U-VALEU=2041 / SHGC=0.51 GRND (OBSCURE FLOAT FL.TINTED DOUBLE . TOTAL U-VALEU=4.23 / SHGC=0.59 FIRST FL. GLASS IN BATHROOM/ WC'S)

GLAZING

TINTED DOUBLE LOW E TOTAL U-VALEU=2041 / SHGC=0.51 GRND FL.TINTED DOUBLE . TOTAL U-VALEU=4.23 / SHGC=0.59 FIRST FL.

GLAZING

TINTED DOUBLE LOW E TOTAL U-VALEU=2041 / SHGC=0.51 GRND FL.TINTED DOUBLE . TOTAL U-VALEU=4.23 / SHGC=0.59 FIRST FL.

GLAZING

TINTED DOUBLE LOW E TOTAL U-VALEU=2041 / SHGC=0.51 GRND FL.TINTED DOUBLE . TOTAL U-VALEU=4.23 / SHGC=0.59 FIRST FL.

LINTOLS

PRECAST CONC. LINTOLS.

LINTOLS

PRECAST CONC. LINTOLS.

LINTOLS

PRECAST CONC. LINTOLS.

LINTOLS

PRECAST CONC. LINTOLS.

Drawing title: Window & Door Schedule

CILLS

EXTERNAL: PLASTER & PAINT EDGE AT 30° SLOPE.

CILLS

EXTERNAL: PLASTER & PAINT EDGE AT 30° SLOPE.

CILLS

EXTERNAL: PLASTER & PAINT EDGE AT 30° SLOPE.

CILLS

EXTERNAL: PLASTER & PAINT EDGE AT 30° SLOPE.

Drawing status:

SIZES

600 x 600

1.500 x 1.500

SIZES

1.244 x 2.000

SIZES

600 x 2.100

SIZES

Bulwer Avenue

Street address

:

Cadastral

: ERF 225

Service Provider 9 West Central Arterail Richards Bay 3900 A. GENERAL NOTES: 1. This drawing is to read in conjunc on with the engineer's drawings, the electrical layout, the key to the electrical layout and the schedule of finishes. B. BYLAW REQUIREMENTS: All building work and any plumbing and drainage installa ons must be carried out by the contractor in accordance with the Na onal Building Regula ons and Building Standards Act No 103 of 1977 and ammendments. C. CODES OF PRACTICE AND MANUFACTURERS SPECIFICATIONS: All work shall be carried out in accordance with SABS and NBR standards and Codes of Prac ce and or manufacturers specifica ons or recommenda ons except in so far as such specifica ons etc do not conflict with any ByLaw. D. LIGHTING AND VENTILATION: To comply with Part O of SANS 10400. E. HEALTH: Rodent proofing to comply with public health regula ons R1441 of 23/09/66.

GSPublisherVersion 0.0.100.100

F. DRAINAGE: 1. The contractor is required to ensure that the local authority installs necessary stormwater and/or sewer connec ons before drainage work commences. It is therea er the contractor's responsibility to ensure adequate falls to these connec ons. 2. Approval for the si ng of sep c tank and/or soakpits together with any percola on tests which may be required is to be obtained from the local authority by the contractor before commencing any building work. 3. The contractor is responsible for ensuring that stormwater damage to the work in progress or the neighbouring proper es does not occur during construc on and that the surface water drainage is adequate. 4. All sanitary fi ngs to be trapped and/or vented to local authority requirements. 5. All bends and junc ons in drains to be provided with inspec on eyes at 26m centres. 6. Adequate access panels to be fi ed in all ducts over  inspec on eyes. G. DOORS AND FRAMES: 1. External frames to be hardwood and Aluminium. (Refer to Schedule) 2. Internal frames to be hardwood. (Refer to Schedule) 3. External doors to be hardwood and Aluminium. (Refer to Schedule) 4. Internal doors to be flush panel semi hollow core faced in. 5. Doors in mber to be provided with 1 pair(internal) and 1.5 pairs(external) 100mm brass bu  hinges and lockset.

I. GLAZING: 1. All glazing is to be accordance with SANS 10400. 2. Glazing to bathrooms and WC's to be in obscure glass. J. SITING AND EXCAVATIONS: 1. All boundary beacons are to be flagged by a registered land surveyor and the contractor is to obtain a cer ficate sta ng that the work has been correctly set out before proceeding with excava ons. 2. Contractor is to check all dimensions and levels before commencing work and report any discrepancies to drawing service. 3. Contractor is to confirm and ensure correctness of floor and entrance levels physically on site with local authority inspector before commencing work. 4. If the site is found to contain clay, shale, ground water or any other suspect soil condi on, then all founda ons are to be to professional engineer's details and built under his supervision. 5. All founda ons to be taken to hard, virgin ground. No back filling over excavated areas will be permi ed. Founda on depths to be determined on site.

K. WALLS: 1. To be built in accordance with professional structural engineer’s detail under, his supervision. 2. Finish to be plastered unless otherwise noted. 3. Two courses of brickwork to be reinforced in with brick-force. Solid cement mortar joint below wallplate level, above window head level and below window cill level. 4. Unplastered external walls to be bagged and bitumen painted between skins. 5. All brickwork below ground level to be bricks recommended for the purpose by the manufacturer. 6. Gundle 'brickgrip' DPC's to be provided over all slabs, under all cills, parapets and elsewhere as required by the local authority and in accordance with NBR and window systems. 7. Galvanised steel coil outguards, lapped and soldered at joints to be to local authority requirements. 8. Two vermin-proofed airbricks to be provided in the external walls of all habitable rooms. L. SURFACE BEDS: 1. Surface beds to be 100mm concrete of mix not weaker than 1:3:6 by volume, reinforced with 6mm diameter GMS rods at 300 centres both direc ons or equal mesh. 2. Surface beds to be laid on Gundle UFS green membrane on ground poisoned by, specialist to SABS requirements.

(c) 078 725 6238 [email protected]

U.

B.

E.

pty(ltd).

Drawn by : M. S. Langa Checked by: R. R. Lesoana. SACAP Reg: PAT 20760

Drawing scale: As shown Drawing #

Date:

UBE_KDCM1- E /0002

13 February 2017

c

Copyright reserved - Architects cc.

Smile Life

When life gives you a hundred reasons to cry, show life that you have a thousand reasons to smile

Get in touch

© Copyright 2015 - 2024 PDFFOX.COM - All rights reserved.